| 1 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil,kankar, etc. |
| 2 | Depth upto 1.5 m |
| 3 | Add extra for overall depth of excavation above 1.5 m and upto 3.0 mover item no 17.1.1.1 |
| 4 | Add extra for overall depth of excavation above 3.0 m and upto 4.5 m over item no 17.1.1.1 |
| 5 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face areatimbered) for following depth below NGL. Depth upto 3.0 m |
| 6 | Providing and fixing OPEN timbering in trenches of sewer line andmanholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL. Depth upto 3.0 m |
| 7 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standarddrawings), re-handling of material/earth to complete the task. |
| 8 | Bituminous courses |
| 9 | Granular courses |
| 10 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. Hand broken - Grade-I(90-45mm) |
| 11 | Providing and applying tack coat on the prepared surface with bitumenemulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standarddrawings) to complete the task. |
| 12 | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item ofmanhole/inspection chamber shall not be payable. 600 mm internal diameter |
| 13 | Providing at site, lowering & laying in trenches, aligning & jointing ofU-PVC pipe as per IS 13592 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer for house sewer connection work. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chambershall not be payable. 110 mm Nominal Dia |
| 14 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directedby Engineer. 600 mm internal diameter |
| 15 | Providing, fixing and constructing of pre-cast RCC M-40 gradecircular manholes with internal dia 1.5m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.5m, vertical height 1.305m, wall thickness 125mm), and circular rings of required heights (ID 1.5m, height 150/225/300/600/900/1200 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 2.125m dia and 150mm thickness, PCC M15 grade circular wall ID 1.425 m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 16 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 gradefoundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall(if any) + 50mm) |
| 17 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300/600/900/1200mm for constructing extra depth of manhole beyond depth mentioned initem no-17.61.1 as per drawing. |
| 18 | Providing and making connection to the manhole/ road side chamber/property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thickM15 grade concrete etc complete as directed by Engineer. |
| 19 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage ofMaterials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specificationunder subhead \"Carriage of Materials\" |
| 20 | Earth 5 Km |
| 21 | Beyond 5 Km upto 10 Km. per Km. |
| 22 | Providing and laying 50-75 mm compacted thick design mix(approved by Engineer) Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates as per Table 500-9, 500-10 with bitumen binder set (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) for base/ binder course including loading of material withF.E. loader, heating and mixing of stone aggregate, filler and bitumen in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control as per clause 504.3.5 to the required level and grade, compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa to achieve the desired density (approximately 2.3 tonne/cum) complete as per clause 507 of MoRT&H specification but excluding primer/tack coat, including all material, labour, machinery, lighting, guarding and maintenance ofdiversion. Grade-II with Bitumen VG-grade 30 @ 4.50 %, lime filler @ 2% (percent by weight of total mix) |
| 23 | Providing and laying 30-45 mm compacted thickness BituminousConcrete as per design mix (approved by Engineer) on prepared surface with specified grade stone aggregate as per Table - 500-18 with bitumen for wearing course including loading of aggregate withF.E. loader and hot mixing of stone aggregate and bitumen (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensing device (as per clause 504-3.5) to the required level and grade and compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP =0.7 Mpa, to achieve the desired density complete as per clause 509 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding primer/tack coat. Grade-II with Bitumen VG-grade 30 @ 6% (percentby weight of total mix) Please Enable Macros to View BoQ information |