| 1 | Execution of work |
| 2 | Provision for dismantling ruined, cracked, out of plumb, damaged rubble stone masonry in cement mortar manually means. Including stacking of serviceable material for reusing masonry work which may be about 50% and disposal of unserviceable material with in 60 mtr as per direction of engineering incharge for further disposal of the same out of municipal limit by mechanical transport. Including loading, unloading and disposal etc. Including all the labour and T&P required proper completion of work at the site. |
| 3 | Provision for Course Rubble stone masonry with hard stone (first short) in superstructure with mortar of ratio 1:6 cement and course sand with fixing of bond stone at random position as required.Including all the labour, supply of material and T & P Required proper completion of work at the site. |
| 4 | Provision for cement concrete coping work on top of wall in semi circular shape with mortar of ratio 1:4:8 cement c.sand and stone gritt 10mm gauge finished with 6.00mm cement plaster of ratio 1:3 cement c.sand. Including cost of centring and shuttering as required.Including all the supply of material labour and T.&P.Required proper completion of work at this site. |
| 5 | Provision for flush/ruled pointing on stone work with cement mortar of ratio 1:3 cement and course sand. After carefully racking of masonry joints and washing of surface. Including all the labour, supply of material and T&P. Required proper completion of work at the site |
| 6 | Provision forearth work in filling in down area/low level area/under plinth of foundation trenches .Including necessary supply of soil (free from grass, garbage and other foregien material) from a distance not exceeding 8.00 km from site of work and including watering and compaction etc including all the labour, supply of material & T&P requied proper completion of work at the site. |
| 7 | Provision for laying of factory made chamfered edge cement concrete paver block 80mm thick in footpath, park, lawns, drive way or light traffic, parking of required strength, thickness and size/ shape made by table vibratory mathod using PU mould laid in required color and pattern orver 50mm thick compacted bed of sand, compacting and proper embedding/laying of inner locking paver block into sand bedding layer through vibratory compaction method by using plate vibrator, filling of joints with sand and cutting paver block as per required size and pattern, finishing and sweeping extra sand. Including all the labour, materialand T&P Required proper completion of work at the site. |
| 8 | Provision for painting work on iron work in small area on previously painted surface by two coat of approved class synthetic paint over one coat of red oxide primer. Including carefully cleaning of old layer of paint and washing of surface. Including all the supply of material labour & T. & P |
| 9 | Provision for fixing of Culture Notice Bord with sand stone tablet and base pillar of appropriate size as per designed by the department by engraving of lettersin bilingual of suitable size. Including all supply material, finishing, engraving and fixing etc. Including all the labour, material and T&P. required proper completion of work at the site. |
| 10 | Provision for fixing of DIRECTION NOTICE BORD with 50 mm Ø and 25 mm Ø stainless steel pipe and iron sheet of thickness 18 gauge fabricated as per designed by the department with 25x3mm steel strip. Size of display bord is 1.50x1.20 mt. and height of bord will be 3.00 mt. Including pasting of high visibility micro prismatic p.v.c. reflective sheet both side in bilingual as directed by the department. Bord to be fixed with P.C.C. of mortar of ratio 1:2:4: cement c.sand and stone gritt 20 mm. Including all the labour, material and T&P. Required proper completion of work at the site. |
| 11 | Provision for fixing of Protection Notice Board / Act Notice Board(As per new rule ) with angle iron post of size 50 X 50 X 06 mm and frame of size 25 X 25 X 03 mm with 18 gauge iron sheet fixed with back of board as designed by the department. Board to be fixedwith P. C.C. of mortar of ratio 1:2:4 cement, c. sand and stone gritt 20 mm. lncluding painting on iron member with two coat of syntheticpaint over one coat ofRedoxide primer. Including all the labour material fabrication etc. |
| 12 | Provision for making of masonry tank of size 2.50 x 1.50 x 0.90mt for slacking of lime, mixing grinding of lime mortar for conservation work. tank will be made by stone masonry, cement concrete etc. Including all the supply of material labour & T & P. Required proper completion of work at the site. |