|
| 1 | The provision has been made for Excavation in dumped stones or malba including stacking of serviceable and unserviceable material separately and disposal of unserviceable material, lead up to 50 m and lift up to 1.5 m, disposed material to be neatly dressed. |
| 2 | The provision has been made for Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment etc complete in all respect |
| 3 | The provision has been made for Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) etc complete in all respect |
| 4 | The provision has been made for rough dressing the trenched ground including breaking of clods. etc complete in all respect |
| 5 | The provision has been made for uprooting of weeds from the surface dressed after 10 to 15 days of its flooding with water, which is essential to check the growth of weeds. The rate is based on etc complete in all respect |
| 6 | The provision has been made for fine dressing of the surface dressed. etc complete in all respect |
| 7 | The provision has been made for spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge(cost of sludge, dump manures and/or good earth to be paid separately) etc complete in all respect |
| 8 | The provision has been made for mixing of good earth and manures in the surface dressed. etc complete in all respect |
| 9 | The provision has been made for flooding the surface dressed with water including making kinaries and dismantling the same for compacting the soil, etc complete in all respect |
| 10 | The provision has been made for digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) etc complete in all respect |
| 11 | The provision has been made for supply of doob grass turf required for grassing of the surface dressed for making the weed free lawn and to maintain the greenery at site. |
| 12 | The provision has been made for grassing with Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). |
| 13 | The provision has been made for Supply Purchase of plants (Tree/Shrubs/Hedge Plants and ground Cover) - Hibiscus 90–120 cm in PB |
| 14 | The provision has been made for Supply Purchase of plants (Tree/Shrubs/Hedge Plants and ground Cover) - Neem 90–120 cm in PB |
| 15 | The provision has been made for Supply Purchase of plants (Tree/Shrubs/Hedge Plants and ground Cover) - Kaner 2.5–3\" in PB in PB - Kaner 2.5–3\" in PB |
| 16 | The provision has been made for Supply Purchase of plants (Tree/Shrubs/Hedge Plants and ground Cover) - Coconut Plants 90–120 cm in PB |