| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction ofEngineer-in-Charge. |
| 2 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost). |
| 3 | Providing and laying factory made chamfered edge Cement Concretepaver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-35 grade with approvedcolour design and pattern. |
| 4 | Dismantling old C.I. pipes including excavation and refilling trenches aftertaking out the pipes, breaking lead caulked joints, melting of lead andmaking into blocks, including stacking of pipes at site lead up to 50 metre: 80 mm diameter C.I. pipe |
| 5 | Labour for cutting C.I. pipe with steel saw.80 mm diameter C.I. pipe |
| 6 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints completeas per direction of Engineer in Charge.80 mm nominal dia Pipes |
| 7 | Providing and fixing C.I. double acting air valve of approved quality with bolts, nuts, rubber insertions etc. complete (The tail pieces, tapers etc if required will be paid separately) :80 mm dia |
| 8 | Providing and fixing enclosed type water meter (bulk type) conforming to IS : 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. (The tail pieces if required will be paid separately) :80 mm dia nominal bore |
| 9 | Providing and fixing C.I. dirt box strainer for bulk type water meter with nuts, bolts, rubber insertions etc. complete conforming to IS : 2373 :80 mm dia |
| 10 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer -in - charge.Nominal concrete 1:4:8 or leaner mix (including equivalentdesign mix) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived fromRecycled Concrete Aggregate (RCA) : 10 graded stoneaggregate 40 mm nominal size Recycled Aggregate (RA) ) |
| 12 | Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial desilting of manholes and dechockingof sewer lines. Dechocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150 mm dia upto 300 mm |
| 13 | Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge. |
| 14 | Cleaning of under ground sump, Over Head R.C.C. Tank ( independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:-(i)Tank shall be emptied of water by pumping & bottom shall be cleaned ofsilt and other deposits.(ii) Entire surface area of the sump shall then scrubbed thoroughly withwire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as perdirection of Engineer-in-Charge. |
| 15 | Credit and disposal of old damaged and dismantled Steel/Cast Iron/M.S/G.I and other similar articles (The material will be handed over to contractor). Note: Actual weight of the material to be measured for payment. |
| 16 | Modified estimated cost using GST correction factor @0.973=2734464.00 |
| 17 | Cost index @ 3% |