| 1 | Dismantling of old G.I. Sheets, Chain Link fencing, M.S. bars, including cutting, providing scafolding, loading, transporting to MPA MM Stores, Baina, unloading, weighing and stacking as directed etc. complete . All tools, plants labour, materials etc. complete. |
| 2 | Constructing masonry in superstructure using precast cement concrete solid blocks having a crushing strength of not less than 35kg./cm2 (28 days curing) with a mix not leaner than (1:5:10) in cement mortar (1:6) including providing specially moulded blocks at junctions & corners, curing, scafolding, dismantling/removing of loose/ soft masonry etc. All tools, plants labour & material etc. complete. |
| 3 | Plastering with C.M. (1:5) 15mm thick in two coats for external surfaces (Backing coat of 10mm & finishing coat of 5mm) including Patches, bays, bands, fluting, scaffolding and cleaning of all dirts, raking out joints, hacking, scrubbing, chamfers, beading, curing, all lifts etc.as directed. All tools, plants, labour & material, etc. complete |
| 4 | Supplying and fixing pvc coated GI Chain Link fence having mesh size of 50x50mm of 4mm thick of dark green or any other approved colour including cutting,fixing, providing fixtures, loading unloading, transporting,stacking, providing scafolding, etc.complete and as directed. (Note: the rate does not include structural steel members and shall be paid seperatly) |
| 5 | Supplying & erecting in position structural steel work in single section (light sections up to 34 kg./m) using G.I.Pipes,G.I. tubes, M.S. Tubes, Angles, etc. of Government (approved brand/make (IS), including cutting, hoisting, fixing in position and cleaning the surface, painting two coats of approved quality synthetic enamel paint of approved colour/ shade over a coat of red oxide zinc chromite primer etc. complete and as directed All tools, plants labour, materials etc. complete. |
| 6 | Excavation in dense or hard soil/murrum etc. including removal of obstructions such as small trees, vegetation etc. and removal of excavated material upto a lead of 50-100m and a lift of 1.5m including refilling foundation trenches as directed. All tools, palnts,labour and material etc. complete |
| 7 | Soling with hard laterite rubble stone of 20 cm to 30 cm size including hand packing etc. complete and as directed. All labour & material ,tools & plant etc. complete |
| 8 | Cement concrete (1:2:4) using 20 black aggregate as coarse aggregate including mixing, depositing, consolidating, levelling, curing etc. complete and as directed. All tools, plants, labour & material etc. complete. |
| 9 | Demolishing and clearing away laterite brick/CC. Block or rubble masonry in C.M including stacking serviceable material & disposal of unserviceable material at places pointed out upto a lead of 100m including all tools & plant labour & material, etc. complete. |
| 10 | Demolishing and clearing of cement concrete/RCC in trap stone metal, disposal of unserviceable material within a lead of 100m, including cutting of steel, all tools & plant, labour and material, etc. complete |
| 11 | Painting iron work/metal work with a primer coat of Red Oxide Zinc Chromite including scrapping, cleaning, surfaces. All tools, plants, materials, labour, etc. complete |
| 12 | Painting iron work/metal work with two coats of approved synthetic enamel paint of approved colour/shades (excluding priming coat) including preparing the surfaces, as directed, etc.. All tools, plants, materials, labour, etc. complete |
| 13 | Painting two coats on previously painted masonry/concrete/plastered surfaces with synthetic enamel paint of approved shade/ colour including cleaning and preparing the surfaces. All tools, plants, labour and material etc.complete. |
| 14 | Application of a coat of exterior wall primer of approved quality , cleaning and preparing the surface, Scaffolding etc. All tools, plants, labour materials, etc. complete. |
| 15 | Painting external wall surfaces, etc with exterior emulsion paint with silicon additives of reputed make/brand and of approved colour/shade having weather guard/weatherproof, anti-fungal/ Anti-Angal properties and of approved colours/shades applied in two or more coats including scrubbing and cleaning the surface of all dirt, dust filling cracks with Crack filler curing necessary scaffolding, painting bays band, chajjas, grooves, etc. complete as directed. All tools, plants, labour materials, etc. complete. ( Note : The bidder has to produce the paint including application of paint samples in advance for approval before commencement of the work . The rate does not include the cost of application of external wall primer). |
| 16 | Deploying of crane of minimum 15T capacity with experienced operator, fuel, lubricant on call basis along with proper sling, belts, ropes, etc. for holding , lifting, lowering, loading, unloading of items as directed. (The contractor shall deploy crane in good condition for a min. period of 4hrs. Day on call basis. The Contractor or his authorised supervisor must be present at site during operation of the crane) |
| 17 | Extra for attachment of man carry basket for Hydra crane on call basis. (Note: The contractor shall attach good quality man carry basket at site The man carry basket should have capacity of holding/carrying minimum 2 (two) persons along with tools, plants/equipments/machine. The Contractor or his authorised supervisor must be present at site during operation of the crane with man carry basket.) |
| 18 | Supply of Tree prunning / chain saw machine- 22 inch petrol operated including fuel and oil etc and 01 operator and 01 helper for 8 hours a day including replacement of worn out chain (used for cutting trees) on call basis etc. including cutting of logs in 1mtr size and stacking neatly in place as directed. All tools, plants, labour and material etc complete |
| 19 | RCC (1:2:4) mix using 20mm graded trap stone metal for 08-10cm thick precast slabs including shuttering mixing concrete, placing, levelling, consolidating, curing, finishing with C.M. (1:3) 6mm thick including placing and fixing in position but excluding cost of reinforcement etc. All labour and material etc. complete. |
| 20 | Providing and fixing reinforcement with Torsteel conforming to IS:1786 or equivalent including cutting, bending, tying grills, placing in position, holding in position during concreting etc. including cost of binding wire. All labour & material etc. complete. |
| 21 | Supplying & fixing galvalume sheets of 0.45mm thick of Tata/Jindal make or any other equivalent make in roofing including drilling holes with necessary self drilling screws/ providing J- hooks, G.I and bitumen washer etc. as per site directions. All tools, plants, labour and material, etc. complete. |