| 1 | Earthworkin excavationof foundationtrenches or drains,in all sorts of soil (includingmixed soil but excluding laterite or sandstone) including removing,spreadingor stackingthe spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete - Depth of excavation not exceeding 1500 mm |
| 2 | Earth work in filling in foundation trenches or plinth with goodearth, in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) - With earth obtained form excavation of foundation |
| 3 | Brick work with 1st class bricks in cement mortar (1:6) - In foundation and plinth |
| 4 | 125 mm thick brick work with 1st class bricks in cement mortar (1:4) - In ground floor |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering. In ground floor and foundation. - 1:3:6 proportion |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excludingshutteringandreinforcementif any, as per relevant IS codes. - Pakur variety - In ground floor |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) - (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed for every 4 m or part thereof) - 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge. -In ground floor |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. - Tor steel / mild steel (JSW/JSPL/Shyam/ SRMB/BMASL/ Electro Steel/SSL) - n foundation, basement and upto roof of ground floor / upto 4m |
| 9 | M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs. - Grill weighing above 16 Kg./sq.mtr and above - In ground floor |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints incl. throating, nosing & drip course, scaffolding/staging where necessary (ground floor) [excluding cost of chipping over concrete surface] - In ground floor |
| 11 | With 6:1 cement mortar -15 mm. thick plaster |
| 12 | With 4:1 cement mortar - 15 mm. thick plaster (External / Internal) |
| 13 | Painting with ready mixed red lead paint of approved make and brand: One coat |
| 14 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : On steel or other metal surface - With super gloss (hi-gloss) - 2 coats (with any shade except white) |
| 15 | ApplyingExteriorgradeAcrylicprimerof approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured(matt finish) or smooth finishacrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. - One Coat -In ground floor |
| 16 | ProtectiveandDecorativeAcrylicexterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. - Premium 100% Acrylic emulsion (Weathershield/Weathercoat/ Snowcryl XT/Apex) -In ground floor (Two coats) |