| 1 | Providing openwell Submersible Motor and pipeline From T.mettur to Thatchankuruchi in Thatchankuruchi Panchayat.Open well Submersible pump set conforming to IS 14220 /2002 (100 lpm X 100mts ) |
| 2 | 6.00 Sqm sub cable |
| 3 | 90MM HDPE PIPES |
| 4 | 90MM GI Adopter |
| 5 | 15HP Panel board |
| 6 | G.M Gate valve |
| 7 | G.M Non Return valve |
| 8 | Nylon Rope for Borewell |
| 9 | 63 Amps DP Switch with Metal Clad |
| 10 | 600 mm X 600 mm Plywood |
| 11 | 63Amps Fuse unit |
| 12 | Run off SD 63 |
| 13 | 25mm GI Service pipe SD 70 |
| 14 | Labour charges for the erection of submersiblepumpset in borewell/openwell including fixingand jointing submersible cable with properclamps upto the starter to required depth andalso fixing of riser pipes to the required depthvalves erection clamps |
| 15 | Conveyance of power pumpset (centrifugal,jet and submersible) and its accessories fromdivisional stores to site of works. |
| 16 | 90mm 6KSC PVC Pipe |
| 17 | 90mm PVC Bend |
| 18 | 90mm PVC Coupler |
| 19 | 90mm PVC Equal Tee |
| 20 | 90mm PVC End cap |
| 21 | pvc adhesive solution |
| 22 | Earthwork excavtion for all classes of soil |
| 23 | Refillingwith excavated earth same trench |
| 24 | Laying and Jointing pvc pipe |
| 25 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 26 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 27 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 28 | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush |
| 29 | Brick work using country bricks of size 83/4\"x41/4\"x23/4\" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 30 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) |
| 31 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 32 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 33 | Supply and fixing ms Door 0.75M X 2.10M |
| 34 | Supply and Fixing cement jolly 0.60m X 0.60M |
| 35 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). |
| 36 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 37 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) |
| 38 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. |
| 39 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
| 40 | Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER) |
| 41 | Provision for Name board etc., Complete |
| 42 | Provision for Photo cahrges etc., Complete |
| 43 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |