| 1 | Dismantling of roads for laying of pipe line including sorting out and stacking of serviceable materials, stacking and disposal of unserviceable materials upto a distance of 50 m. |
| 2 | Cement Concrete road |
| 3 | 91.80mm (110mm O.D.) HDPE pipes |
| 4 | Interlocking CC Tiles |
| 5 | 91.80mm (110mm O.D.) HDPE pipes |
| 6 | 133.60mm (160mm O.D.) HDPE pipes |
| 7 | Excavation of earth for pipe line trenches in ordinary soil(loam, clay, or sand) including lift upto 1.5m and lead upto 50m and refilling, watering, ramming of excavated earth into the trenches & disposal of surplus earth upto 50m from the center of the trenches |
| 8 | 91.80mm (110mm O.D.) HDPE pipes |
| 9 | 133.60mm (160mm O.D.) HDPE pipes |
| 10 | Supply of the following HDPE Pipes as per B.I.S. code no. 4984/2016 or its latest amendment including cost of 1 P.V.C. coupler per pipe length and inclusive of all taxes and duties, 3rd party inspection charges, packing and forwarding charges, trasnit insurance charges, road transportation charges etc. F.O.R. destination etc. complete. |
| 11 | 110 mm dia HDPE pipe PN 6: class PE 100 |
| 12 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 13 | Supply of HDPE specials for HDPE Pipes.( socket joint ) |
| 14 | Carting of following pipes, specials and fittings from site store to site of work, lowering them into trenches, laying true to alignment and gradient, laying and jointing of pipe line including cutting of pipe for making up lengths as required for proper completion of work |
| 15 | 110 mm dia HDPE pipe PN 6: class PE 100 |
| 16 | 160 mm dia HDPE Pipe PN-6: Class PE-100 |
| 17 | Supply and fixing of following fittings including cartage of materials, labour, T&P etc. complete Sluice/wheel valve |
| 18 | Sluice valve CID/F |
| 19 | 150mm dia |
| 20 | Sluice valve CID/F |
| 21 | 100mm dia |
| 22 | Supply of all labour, materials, T&P etc. all complete and construction of following valve chambers as per |
| 23 | Sluice valve chamber (0.55*0.55*0.30) (Surface Box Type) |
| 24 | Provision of new water house hold Connection |
| 25 | 110mm HDPE pipes |
| 26 | 160mm HDPE pipes |
| 27 | Nala crossing (small) |
| 28 | Reinstatement of following type of roads dismantled during laying of pipe line including supply of all materials, labour and T & P etc. required for proper completion of the work. |
| 29 | Cement Concrete road (as per item no. ...above) for pipe line |
| 30 | Interlocking C.C. Tiles (as per item no..... above) for pipe line |
| 31 | Interconnection of water line to Existing main water line i/c all complete work |
| 32 | Site clearance and other unforeseen items |
| 33 | GST Please Enable Macros to View BoQ information |