| 1 | Part A: Installation of 1000mm complete belt conveyor for a length of 90 metre at CM 3 Panel 7A |
| 2 | Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on the platform |
| 3 | Transportation of 250 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground ( sl.no.- 21 in committee report, rate/ length =32838.4 / 250 =131.35 ) |
| 4 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV |
| 5 | Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV |
| 6 | Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV |
| 7 | Transportation and installation of Tail-end Unit Complete at CM panel 7A with the help of MUV |
| 8 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1000mm structures is 0.085 Te/mtr.) |
| 9 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop) |
| 10 | Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt. |
| 11 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 12 | Supply of G.I. wire 8 SWG (for signalling system) |
| 13 | Supply of Bobin insulator (for signalling system) |
| 14 | Supply of industrial oxygen cylinder(7.1cum) |
| 15 | Supply of DA cylinder(6.2 cum) |
| 16 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 17 | Part B: further installation of same 1000mm wide PVC belt conveyor for a length of 460 mtr. InCM 3 Panel 7A R-V seam, 12XR/-2L to 12XR/12L section at MIC |
| 18 | Transportation and Installation of 460 mtr. of belt structure, after loading it on MUV from surface(weight of 1000mm structures is 0.085MT/mtr.) |
| 19 | Transporting, laying, lapping & jointing of 920mtr. of belting |
| 20 | Shifting and installation of tail end for every shifting (wt =0.945*13 Te=12.285Te) |
| 21 | Installation of pull cord ,signalling and lock out devices |
| 22 | Supply of M.S. Nut & Bolt (M16x40) |
| 23 | Supply of G.I. wire 8 SWG (for signalling system) |
| 24 | Supply of Bobin insulator (for signalling system) |
| 25 | Supply of M.S. Nut & Bolt 3/8\"\"x 3\" with washer |
| 26 | Part C: Heightening of T6 Belt Conveyor(50pairs structure) at CM 3 Panel 7A in RV seam including necessary fabrication jobs and required alignment |
| 27 | Transportation of 50pair of ISMC 150 channels from surface to installation site at UG with the help of MUV (50 pair channels of 3 mtr. length each required for heightening) |
| 28 | Heightening of 12XR Belt conveyor with the help of Chain Pully Block along -12XR and fabrication of the structure of 12XR belt through gas cutting, adding channels vertically, and aligning it |
| 29 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 30 | Supply of industrial oxygen cylinder(7.1cum) |
| 31 | Supply of DA cylinder(6.2 cum) |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |