| 1 | Subwork-I Leachpit Item no.1:-Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means. |
| 2 | Item No.2:-Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. |
| 3 | Item No 3:-Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc) |
| 4 | Item No.4:-Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in foundations and plinth of inner walls/ in plinth external walls including bailing out water manually ,striking joints on unexposed faces, raking out joints on exposed faces and watering etc. Complete. |
| 5 | Item No.5:-Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc.complete. |
| 6 | Item no.6:-Providing and fixing in position steel fibre reinforced concrete (S.F.R.C.) frame and covers of approved make including loading, unloading, transportation, all taxes, etc. complete as directed by Engineerin-charge |
| 7 | Item no 7:-Providing and fixing in position steel fibre reinforced concrete (S.F.R.C.) frame and covers of approved make including loading, unloading, transportation, all taxes, etc. complete as directed by Engineerin-charge |
| 8 | Item No.8:-Providing, laying and fixing P.V.C. pipe of 110 mm. dia. with fittings such as bends, tees, reducers, clamps,etc. including necessary excavation, trench filling etc. complete. Including removing existing pipe line ifnecessary and conveying and stacking the same in PWD chowky or as directed etc. complete. |
| 9 | Item No.9:-Dewatering the excavated trenches and pools of water in the building trenches / pipeline trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. (Bd-A-9/261) |
| 10 | Subwork-I Leach Pit |
| 11 | Subwork -II Information Board |
| 12 | Total nos of Leach pit Please Enable Macros to View BoQ information |