| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201. (Excluding GST) |
| 2 | Earth Work in Excavation in Trenches Excavation for roadway in soil using manual means including loading in tranch for carriying of cut earth to embankment site with all lifts and lead upto 1000 metres (Excluding GST) |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Excluding GST) |
| 4 | Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Excluding GST) |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Excluding GST) |
| 6 | Granular Sub-Base with close Graded Material Construction of granular sub-base by providing close graded Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Excluding GST) |
| 7 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density (Excluding GST) |
| 8 | Prime Coat over WMM/WBM Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Excluding GST) |
| 9 | Dense Graded Bituminous Macadam Grading 2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Excluding GST) |
| 10 | Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.(Excluding GST) |
| 11 | Bituminous Concrete Grading 2 Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Excluding GST) |
| 12 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material .(Excluding GST) |
| 13 | P. C.C. with M15 cement , coarse sand and 4 cm gauge Dalla grit including all taxes , royalty and including supply of martial , labour and T&P etc. required for proper completion of work as per direction of E/I (Excluding GST) |
| 14 | R.C.C ( M-20 Grade) (Excluding GST) |
| 15 | Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202, for Bars below 36 mm dia including over laps and wastage, where they are not welded.(Excluding GST) |
| 16 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.(Excluding GST) |
| 17 | Struck cement Pointing with cement mortor consisting one part of cement 2 part of fine sand of 1.25 finencess moudulous on brick work including raking the joint washing and cleaning and supply of all material, labour T&P etc required for proper completion of the work as per SI No-574 (Excluding GST) |
| 18 | Furnishing and placing reintforced cement concrement M-25 in super structure as per drawing and Technical Specifications (Excluding GST) |
| 19 | Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification.(Excluding GST) |
| 20 | Plain Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications.(Excluding GST) |
| 21 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.(Excluding GST) |
| 22 | Drainage Spouts complete as per drawing and Technical specification.(Excluding GST) |
| 23 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specification (Excluding GST) |
| 24 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (Excluding GST) |
| 25 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Excluding GST) |
| 26 | Supply of 900 NP-3 Hume pipes (Excluding GST) |
| 27 | Laying of NP-3 Hume pipes (Excluding GST) |
| 28 | Supply of 600 NP-3 Hume pipes (Excluding GST) |
| 29 | Laying of NP-3 Hume pipes (Excluding GST) |
| 30 | Supply and laying of 1000 mm NP-3 hume pipe. including cost of all materials, loading, unloading etc.(Excluding GST) |
| 31 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Reference to MORT&H Specification 305 Sr No.3.163 (Excluding GST) |
| 32 | First class brick on edge floor laid dry joint sand filled including preparation of baseto proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper complition of the work.roller & including Cost of bitumen )(Excluding GST) |
| 33 | Maintenance of constructed road for next five year after completion of work shall be paid. as per GO No 17/2024 /lk0-113/23-1-2024-23-1099-113/2023 yksd fuekZ.k foHkkx vuqHkkx&1 fnuakd 16-01-2024 ,oa dk;kZy; izeq[k vfHk;Urk ;krk;kr oxZ yks0fu0fo0 y[kuÅ dk i=kad&3689lh&vks0ih0 vkj0,e0lh0@ ewy&23&24 fnuakd 17-02-2024- Payment shall be done as per satisfaction of engineer in chage regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid extra as applicable). 1st year Maintenance cost total construction of cost Item No. 1 to 36 of amount @ Zero percent on 1st year & for 2nd year @ 0.25% on item No, 1 to 32 |
| 34 | Maintenance cost for 3rd year @0.50% on item No, 1 to 32 |
| 35 | Maintenance cost for 4th year @0.75% on item No, 1 to 32 |
| 36 | Maintenance cost for 5th year @1.00% on item No, 1 to 32 Please Enable Macros to View BoQ information |