| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 mabove ground level and removal of rubbish up to a distance of 50 moutside the periphery of the area cleared. |
| 3 | Earth work in excavation in foundation in kankar and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge into a distance pickaxes, subbals etc. |
| 4 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 5 | Random rubble masonry with hard stone in foundation and plinth includinglevelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12graded stone aggregate 20 mm nominal size) upto plinth level with : |
| 6 | R.c.c.work in 1:1.5:3 cement:sand:STONE GRIT COLUMN FOOTING |
| 7 | R.c.c.work in 1:1.5:3 cement:sand:STONE GRIT Column |
| 8 | R.c.c.work in 1:1.5:3 cement:sand:STONE GRIT PLINTH BEAM |
| 9 | R.c.c.work in 1:1.5:3 cement:sand:STONE GRIT SLAB LEVEL BEAM & SLAB |
| 10 | P/F Mild steel or iron in plain work such as reinforced concrete or reinforced, brick work (when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised over lapping shall be measured upto floor two level. |
| 11 | Filling of earth in plinth in 20cm layer including leveling, dressing and watering and also including of supply of earth including carted loading & unloading as per direction of Engineer incharge.. |
| 12 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in super structure above plinth level up to floor v level in all shapes and size in:1:4 (1 cement : 4 sand) |
| 13 | 12mm plaster in 1:6 c:s mortar outer side of wall |
| 14 | 15mm plaster in 1:6 cement:sand mortar |
| 15 | 6-10mm ceiling plaster in 1:3 cement:sand motar |
| 16 | 15mm plaster in 1:3 cement:sand mortar with neat finish |
| 17 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from naturalsources : 8 graded stone aggregate 40 mm nominal sizederived from natural sources) |
| 18 | Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 12-20mm nominal size laid in one layer neat cement (25 mm thick floor). |
| 19 | Providing and fixing glass strips in joints of terrazo/ cement concretefloors. |
| 20 | Finishing wall with water proof cement paint in 3 coat |
| 21 | White washing three coat |
| 22 | Providing and laying 80mm thick inter locking paver bricks in Appron for parikrima marg |
| 23 | Construction of granular sub-base by providing close graded Materialconforming to specifications, mixing in a mechanical mix plant atOMC, carriage of mixed material by tippers to work site, for all leads& lifts, spreading in uniform layers of specified thickness with motorgrader on prepared surface and compacting with vibratory power rollerto achieve the desired density, complete as per specifications anddirections of Engineer-in-Charge |
| 24 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from naturalsources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources |
| 25 | 15mm plaster in 1:3 cement:sand mortar with neat finish |
| 26 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete |
| 27 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, buttresses and cantilevers. |
| 28 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. |
| 29 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts |