| 1 | Earth work in filling for slope & bed of canal including all lead & lift with all cost of material,labour,T & P etc. required for proper completion of work. |
| 2 | Laying C.C. M-15 (1:2:4) mix in foundation with Kabrai crushed gritt 10 to 20 mm size coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. |
| 3 | Filling Local Sand including carriage with all cost of labour and T&P charges etc. |
| 4 | Supplying and laying Geo Textile sheet made of 200 gsm woven multifilament polypropylene yarn including all cost of labour, T&P and material charges etc. |
| 5 | Boulder masonary in 1:4 C:M with coarse sand,of F.M. not less than 2.0, including all cost of material,labour, T & P etc. required for proper completion of work. |
| 6 | Stone grit (4.75 to 10mm ) in side slope 75 mm thick including all cost of material,labour, T & P etc. required for proper completion of work. |
| 7 | Stone grit (10 to 20mm ) in Side Slope 75 mm thick including all cost of material,labour, T & P etc. required for proper completion of work. |
| 8 | Supplying and laying Mirzapur hard stone Boulder in G.I. wire crate ( 1.0 x 1.0 x 1.0 ) mtr. With mesh size 20x20 cm including all cost of material with loading, unloading and carriage , labour, T & P etc required for proper completion of work. |
| 9 | Supplying & laying of Mirzapur hard stone Boulder for slope including all cost of material with loading, unloading and Carriage , labour, T & P etc. required for proper completion of work. |
| 10 | Centering and shuttering for R.C.C.work; including all cost of material, labour, T & P etc complete work. |
| 11 | Cutting, bending, binding and placing of steel reinforcement in R.C.C. work; including all, cost of steel, binding wire,labour, T & P etc. complete work. |
| 12 | Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge. |
| 13 | Laying R.C.C. M-20 (1:1½:3) mix with Kabrai crushed stone grit graded 4.75 to 20mm size with coarse sand of F.M. not less then 2.0; including all cost of material, labour T & P etc required for proper completion of work. |
| 14 | Supply & fixing sign board ISA40x40x05mm size 1.20x2.10m. and 1.50mm thick M.S. plate, painting caution letter, including all cost of material, labour, T & P etc complete work. |
| 15 | Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc required for proper completion of work. Please Enable Macros to View BoQ information |