| 1 | Earth work in foundation of masonary work on channels of discharge above 10 Cumecs including lead upto 30 M. And lift upto 1.5 M and its disposal. |
| 2 | Local sand filling by manually or tractor in all types of sand including all lead and lifts and its proper compaction etc. |
| 3 | Laying C.C. M-15 (1:2:4) mix in foundation with Kabrai crushed gritt 10 to 20 mm size coarse sand of F.M. not less than 2.0, including all cost of material, labour, T & P etc. required for proper completion of work. |
| 4 | Brick on edge lining with First-Class brick and preparation of sub grade and 1:3 cement mortar with 8mm thick sandwitched plaster including all cost of material, labour, T & P etc. |
| 5 | Ist class brick work in 1:4 C.M. with Hamirpur coarse sand F.M. not less than 2.0 including all cost of labour,material,T&P etc. with proper completion of work. |
| 6 | Deep struck cement pointing on exposed surface of brick masonry with 1:2 C.M.with Hamirpur coarse sand.including all cost of material, labour T&P etc. required for completion of work. |
| 7 | Finishing walls with two coat of water proof cement paint of good quality on old surface with this paint to give an even shade after throughly brushing the surface to remove all dirt and remains loose powdered materials including curing and cost of all material,labour& T&P etc. |
| 8 | Earth work for making cunette with dressing of bariyar escape. Km. 2.000 & Km 1.800 as per requirement of site and as per direction of engineer incharge,in all types of soil including lead upto 30m ,lift upto 1.5m. |
| 9 | Writing letter on sign board above 50mm size but below 80mm size. |
| 10 | Supply & fixing sign board ISA 40*40*06mm size 0.90x1.50m. And 18 SWG M. S. sheet with painting caution letter; including all cost of material, labour, T & P etc. complete work as per direction of engineer-incharge. Unit-No. take=03 No. |
| 11 | Centering and shuttering for .C.C.work; including all cost of material, labour, T & P etc. complete work. |
| 12 | Dismantling 1:4:8 lime or cement concrete 150 mm thickness. |
| 13 | Dismantling the old and damaged brick soling and stacking dismantled bricks |
| 14 | Dewatering with all cost of power & P.O.L . machine, pump, well point systm and operator etc with assembling and dismentling of machine etc. required for proper completion of work (As for calculation sheet Attach) Please Enable Macros to View BoQ information |