| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Foundation |
| 3 | For plinth beam |
| 4 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 5 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 6 | Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graD/F hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommenD/F proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 7 | Foundation and basement |
| 8 | ground floor |
| 9 | Supply and fabrication of steel using TMT & RTS bars with including cost and conveyance of all materials and including all labour charges etc complete |
| 10 | Providing centering and shuttering works using MS sheet moulds and soffits with including cost and conveyance of all materials and including all labour charges etc complete |
| 11 | column |
| 12 | slab, beam, lintel |
| 13 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9\" X 43/8\"X 2 3/4\" including finishing, curing, etc., complete complying with standard specification - 100CFT |
| 14 | ground floor |
| 15 | Plastering in C.M 1:5-20 mm thick with including cost and conveyance of all materials and including all labour charges etc complete |
| 16 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification |
| 17 | Earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, sand, silt or other loose soil and to full depth as may be directed except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per SS 20B for foundation |
| 18 | Providing of Granular Sub base using 53-22.40mm (53mm metal, 46.50mm metal,45mm metal, 37.50mm metal,26.50mm metal, 25mm metal, 22.40mm metal) Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - IV No. 111,112,401,900. |
| 19 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 20 | Plain Cement concrete 1:1.5:3 (one cement, One and Half sand, Three aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 21 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed |
| 22 | Supply and fixing of 12mm thick Bitumen Pad to the required depth of good quality. The rate shall inclusive of all charges such as labour charges, cutting charges etc, complete as per standard specification |
| 23 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification |
| 24 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. Please Enable Macros to View BoQ information |