Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Excavation in trenches not exceeding 1.5 m width and not exc 1.5 m in depth and getting out in hard/dense soil for removing/laying of pipe line complete all as specified and directed. |
| 2 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in any type of soil complete all as specified and directed. |
| 3 | Removing excavated material (soils) n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. |
| 4 | Repair/rectification of leakages to water supply distribution lines 15 mm bore to 25 mm bore GI/PPR tubing with provision of necessary excavation, cutting of hard standing, returning and filling in as required, tightening of loose joints of union, elbow, sockets etc, threading if required including replacement of GI unions/sockets/nipples as required at site complete all as specified and directed. |
| 5 | All as per item No 4.00 above but for GI tubing 40 mm bore to 50 mm bore |
| 6 | All as per item No 4.00 here-in-before but for GI tubing 80 mm bore to 100 mm bore. |
| 7 | Attending routine complaints of external water supply including rectification of minor defects by taking down of existing GI/PPR tubing up to 25 mm bore, cutting/threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of jumper valve/ packing sheet of gate valve and including replacement of GI unions/sockets/nipples etc as required at site complete all as specified and directed. |
| 8 | All as per item No 7.00 above but for GI tubing 40 mm bore to 50 mm bore. |
| 9 | Attending complaints of BLOCKAGE OF WATER PIPE LINES / NO WATER SUPPLY AT ANY kind of ACCOMODATION (MARRIED / OTM/ single / multi story building), IDENTIFY THE FAULTS including rectification by taking down of existing GI/PPR tubing up to 80 mm bore, cutting/threading and making joints and cleaning for any blockages, opening of float valve of service tanks, cleaning and fixing the same in its position, replacement of valve/ packing sheet of gate valve and including replacement of GI unions/sockets/nipples etc as required at site TO RESTORE WATER SUPPLY complete all as specified and directed. |
| 10 | Notes for Sl item No 4 to 9 :-(a) The contractor will be allotted complaints at MES complaint cell on requirement basis on all working days including Sundays and holidays and sufficient tradesman / resources will be deployed by him/her for completion of day to day complaints within 12 hours from the time of reporting. Any delay beyond above mentioned time limit without intimation of genuine cause, penalties will be recovered twice of the quoted rate for each un-attended complaint. (b) A detailed log book of complaints with completion/non-completion remarks from users/MES will be maintained by the contractor and the same will be updated on daily basis in consultation with JE E&M/Engr-in-Charge. (c) The contractor will make suitable arrangement for emergency complaints and will notify authorised representative/Engr-in-Charge about extraordinary circumstances for probable non-completion or delay in rectification of complaints beyond stated time limit set for disposal of complaint. In case of any dispute the decision of accepting officer will be final and binding in this regard. |
| 11 | (d) The contractor will intimate MES authority well in advance if electric shutdown is required during rectification of complaints. (e) The quoted rate is deemed to be inclusive of transportation and other expenses required for the resource deployment at the complaint site around scattered Military station at Secunderabad. (f) The contractor will maintain location wise record of each spare/fittings utilized as per inventory format given by AGE E/M, Secunderabad and the same shall be submitted to E/M No II store yard on requirement basis. (g) The stationery required for the job work such as complaint slip books, gate pass book, job card and T&P shall be arranged and maintained by the contractor. (j) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution. (k) Spares/GI fittings required to be replaced and shall be measured and paid separately under respective items. |
| 12 | Rectification of leakages in pumping /delivery lines(CI/DI/PPR/MS) of size 80 mm to 200 mm at Military area / Military Roads /civil Roads /PWD Roads /Cantt board roads by taking necessary permission from respective authorities by excavating PCC/RCC/pavement/soft & hard soil/rock of any depth by using necessary T&P(Excavator/hammer drill)as per the requirement, De-watering from the trenches by using pump sets, rectification of leakages, fixing of CI/ DI specials such as collars, bends/tail pieces, any type of gasket , welding work etc as required to arrest the leakages completely and making joints, filling the trenches , site clearances and PCC at the top portion as required complete all as specified and as directed. Note:-(i)CI specials, lead Joints, D-Joints, Clamp joints, DI/CI Pipe etc shall be measured and paid under respective items of BOQ. (ii) Excavation and PCC will be measured and paid separately under relevant items.(iii) rate of any kind of gasket and Lead joint, necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate.(iii) rate of any kind of gasket and necessary barrication for safety of worker etc as required , deemed to be included in the quoted rate.(iv) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES department if required.(v) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution. |
| 13 | Taking up or down steel tubing and connections, including cleaning the pipes free from scaling for re-fixing or removal complete with all fittings and connections of the following sizes :- |
| 14 | 15 mm dia |
| 15 | 20 mm dia |
| 16 | 25 mm dia |
| 17 | 40 mm dia |
| 18 | 50 mm dia |
| 19 | Refixing of old steel tubing and connection in new or old position including cutting threads if required, fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-Note: (a) Excavation and Earth work shall be measured and paid separately. |
| 20 | 15 mm dia |
| 21 | 20 mm dia |
| 22 | 25 mm dia |
| 23 | 40 mm dia |
| 24 | 50 mm dia |
| 25 | Refixing of old steel tubing and connection in new or old position including , cutting threads if required, fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in floors, walls and ceilings and testing for leakages complete all as specified and directed for the following sizes:- |
| 26 | 15 mm dia |
| 27 | 20 mm dia |
| 28 | 25 mm dia |
| 29 | 40 mm dia |
| 30 | 50 mm dia |
| 31 | Supply and laying steel water tubing medium grade, galvanised with all fitting, laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-Note: (a) Excavation and Earth work shall be measured and paid separately. |
| 32 | 15 mm dia |
| 33 | 20 mm dia |
| 34 | 25 mm dia |
| 35 | 40 mm dia |
| 36 | 50 mm dia |
| 37 | Supply and laying steel water tubing medium grade, galvanised with all fitting, fixed to wall and ceilings or laid in floor and testing for leakages complete all as specified and directed for the following sizes:- |
| 38 | 15 mm dia |
| 39 | 20 mm dia |
| 40 | 25 mm dia |
| 41 | 40 mm dia |
| 42 | 50 mm dia |
| 43 | Taking up or down PPR/CPVC pipe and connections, including cleaning the pipes free from scaling for re-fixing or removal complete with all fittings and connections of the following sizes :- |
| 44 | 20 mm dia |
| 45 | 25 mm dia |
| 46 | 40 mm dia |
| 47 | 50 mm dia |
| 48 | Refixing of old PPR Pipe/CPVC and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:-Note: (a) Excavation and Earth work shall be measured and paid separately. |
| 49 | 20 mm dia |
| 50 | 25 mm dia |
| 51 | 40 mm dia |
| 52 | 50 mm dia |
| 53 | Refixing of old PPR/CPVC Pipe and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in floors, walls and ceilings and testing for leakages complete all as specified and directed for the following sizes:- |
| 54 | 20 mm dia |
| 55 | 25 mm dia |
| 56 | 40 mm dia |
| 57 | 50 mm dia |
| 58 | Supply, laying and testing of CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPES (SDR-11) Pipes ISI marked as per IS:15778,Pressure bearing capacity 23°C is 28.12kg/cm² ² & at @82°C 7.03kg/cm² ,UV stabilized, leak proof, tough, rigid and One step CPVC yellow solvent cement to be used for pipe & fittings up to 50 mm , The rate below includes all plain CPVC fittings and pipe cutting fixing with CPVC solvent cement and testing laid in trenches of following sizes (Outer diameter). |
| 59 | 20 mm dia |
| 60 | 25 mm dia |
| 61 | 40 mm dia |
| 62 | 50 mm dia |
| 63 | Supply, laying and testing of CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPES (SDR-11) ISI marked as per IS:15778,Pressure bearing capacity 23°C is 28.12kg/cm² ² & at @82°C 7.03kg/cm² ,UV stabilized, leak proof, tough, rigid and One step CPVC yellow solvent cement to be used for pipe & fittings up to 50 mm, The rate below includes all plain CPVC fittings and pipe cutting fixing with CPVC solvent cement and testing laid in floors, walls and ceilings of following sizes. |
| 64 | 20 mm dia |
| 65 | 25 mm dia |
| 66 | 40 mm dia |
| 67 | 50 mm dia |
| 68 | Supply and fixing CHLORINATED POLYVINYL CHLORIDE (CPVC) PIPES (SDR-11) Special brass fittings of outer dia 20mm, smooth finished and make embossed on fittings complete all as specified and directed for the following fittings:- |
| 69 | Brass elbow |
| 70 | Brass TEE |
| 71 | Male brass threaded adaptor (MTA/MBTA) |
| 72 | Female brass threaded adaptor (FTA/FBTA) |
| 73 | Union |
| 74 | Ball Valve |
| 75 | All as per item No 21.00 above but for 25 mm bore. |
| 76 | Brass elbow |
| 77 | Brass TEE |
| 78 | Male brass threaded adaptor (MTA/MBTA) |
| 79 | Female brass threaded adaptor (FTA/FBTA) |
| 80 | Union |
| 81 | Ball Valve |
| 82 | All as per item No 21.00 above but for 40 mm bore. |
| 83 | Brass elbow |
| 84 | Brass TEE |
| 85 | Male brass threaded adaptor (MTA/MBTA) |
| 86 | Female brass threaded adaptor (FTA/FBTA) |
| 87 | Union |
| 88 | Ball Valve |
| 89 | All as per item No 21.00 above but for 50 mm bore. |
| 90 | Brass elbow |
| 91 | Brass TEE |
| 92 | Male brass threaded adaptor (MTA/MBTA) |
| 93 | Female brass threaded adaptor (FTA/FBTA) |
| 94 | Union |
| 95 | Ball Valve |
| 96 | Taking up unserviceable/ defective CI/DI/MS/PPR water mains (including all fitting) with spigot/ socketed / flanged ends including disconnecting pipes and fittings in any position complete all as specified and directed for the following sizes:- |
| 97 | 100 mm Dia |
| 98 | 150 mm Dia |
| 99 | 200 mm Dia |
| 100 | Refixing of old CI/DI/MS Pipe and connection in new or old position including fittings with old/new bends, elbows, socket, nipple, tapers, and reducers etc as per site requirement and laid in trenches and testing for leakages complete all as specified and directed for the following sizes:- |
| 101 | 100 mm dia |
| 102 | 150 mm dia |
| 103 | 200 mm dia |
| 104 | S&F in replacement ductile iron pressure pipes, class K7, centrifugally cast with spigot and socket ends as per following conforming to IS 8329/2000 with cement mortar lining inside the pipes with outside zinc coating suitable for push-on-joint (rubber gasket D jointing) in any length including DI specials as required at site confirming to IS 8329/2000 and all jointing materials and making good for disturbed surfaces of roads, path ways etc while laying the pipe line at site, site clearance for the route of pipe line, welding, cutting the existing CI/DI/MS pipe line of any size up to 400 mm dia for inserting branch connections etc complete all as specified and directed for the following sizes:- Notes:- (a) Quoted rates inclusive of Push on Joints / D-Joints as required (b) The contractor is responsible for obtaining the approval from Police Department for Traffic Diversion and related works if required in consultation with the MES department if required.(c) Contractor is responsible for repair/replacement of any damages to the existing structures, Under Ground HT/LT/OFC Cables etc during the course of execution. |
| 105 | 100 mm Dia |
| 106 | 150 mm Dia |
| 107 | Cutting existing CI pipe line for insertion of new tees, collars for branch connections complete all as specified and directed for the following sizes:- Note: CI /DI specials, Joints and Earth work shall be measured and paid separately under relevant items of this schedule. |
| 108 | 80 mm Dia |
| 109 | 100 mm Dia |
| 110 | 150 mm Dia |
| 111 | Supply only GI fittings 15 mm bore, medium grade, ISI marked, smooth finished and make embossed on fittings complete all as specified and directed for the following fittings:- |
| 112 | Union |
| 113 | All equal Tee |
| 114 | Socket |
| 115 | Nipple 75mm Long |
| 116 | Nipple 100mm Long |
| 117 | Nipple 150mm Long |
| 118 | Plug |
| 119 | Elbow |
| 120 | All as per item No 29.00 above but for 20 mm bore. |
| 121 | Union |
| 122 | All equal Tee |
| 123 | Reducer Tee 20 x 20 x 15 mm |
| 124 | Socket |
| 125 | Reducer Socket 20 x 15 mm |
| 126 | Nipple 100mm Long |
| 127 | Nipple 150mm Long |
| 128 | Nipple 600mm Long |
| 129 | Plug |
| 130 | Reducer Elbow 20 x 15 mm |
| 131 | Elbow |
| 132 | All as per item No 29.00 above but for 25 mm bore. |
| 133 | Union |
| 134 | All equal Tee |
| 135 | Socket |
| 136 | Reducer Socket 25 x 20 mm |
| 137 | Reducer Socket 25 x 15 mm |
| 138 | Nipple 75mm Long |
| 139 | Nipple 100mm Long |
| 140 | Nipple 150mm Long |
| 141 | Nipple 600mm Long |
| 142 | Elbow |
| 143 | Reducer Elbow 25 x 20 mm |
| 144 | Reducer Elbow 25 x 15 mm |
| 145 | Plug |
| 146 | Reducer tee 25mm x 25 mm x 20mm |
| 147 | Reducer tee 25mm x 25 mm x 15mm |
| 148 | All as per item No 29.00 above but for 40 mm bore. |
| 149 | Union |
| 150 | All equal Tee |
| 151 | Socket |
| 152 | Reducer Socket 40mm x 25 mm |
| 153 | Nipple 75mm Long |
| 154 | Nipple 100mm Long |
| 155 | Nipple 150mm Long |
| 156 | Elbow |
| 157 | Plug |
| 158 | Reducer elbow 40mm x 25mm |
| 159 | Reducer tee 40mm x 40mm x 25mm |
| 160 | Reducer tee 40mm x 40mm x 20mm |
| 161 | Reducer Socket 40mm x 20 mm |
| 162 | Reducer elbow 40mm x 20mm |
| 163 | All as per item No 29.00 above but for 50 mm bore. |
| 164 | Union |
| 165 | All equal Tee |
| 166 | Socket |
| 167 | Nipple 75mm Long |
| 168 | Nipple 100mm Long |
| 169 | Nipple 150mm Long |
| 170 | Reducer Socket 50mm x 40mm. |
| 171 | Reducer Socket 50mm x 25mm. |
| 172 | Plug |
| 173 | Elbow |
| 174 | Reducer elbow 50mm x 40mm |
| 175 | Reducer elbow 50mm x 25mm |
| 176 | Reducer tee 50mm x 50 mm x 40mm |
| 177 | Reducer tee 50mm x 50 mm x 25mm |
| 178 | Reducer tee 50mm x 50 mm x 20mm |
| 179 | Supply and fix in replacement of unserviceable Gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipes and fixed complete all as specified and directed for the following sizes:- |
| 180 | 15mm dia bore |
| 181 | 20mm dia bore |
| 182 | 25mm dia bore |
| 183 | 40mm dia bore |
| 184 | 50mm dia bore |
| 185 | M&L for Arresting leakages of sluice valves by replacing Gland packing, gland bush, gland flange, nut bolts, gasket, packing material as required after dismantling in existing position including testing on completion complete all as specified and directed for the following sizes:-Note: Quoted rates inclusive of the materials mentioned above like Gland packing, gland bush, gland flange, nut bolts, gasket, packing material etc as required to arrest the leakages. |
| 186 | 100 mm Dia |
| 187 | 150 mm Dia |
| 188 | 200 mm Dia |
| 189 | Burning out lead joint in position for following sizes of CI/DI pipe, removing old lead complete all as specified and directed :- |
| 190 | 100 mm Dia |
| 191 | 150 mm Dia |
| 192 | 200 mm Dia |
| 193 | M&L for run lead joint for CI pipe/DI pipe including spun yarn etc for spigot and socket pipes and fittings complete all as specified and directed for the following bore of pipes:- |
| 194 | 100 mm Dia |
| 195 | 150 mm Dia |
| 196 | 200 mm Dia |
| 197 | S&F in replacement of unserviceable CI non raising type sluice valve both ends flanged with CI body, ISI marked, IS 14846, pressure PN 1.6 with SS spindle with clamps and check nuts, operating hand wheel complete all as specified and directed for the following sizes:- |
| 198 | 100 mm bore. |
| 199 | 150 mm bore. |
| 200 | 200 mm bore. |
| 201 | Cutting the existing road of any kind straight by manual, depth and width not less than 30 cm for pipes up to 100 mm dia and 60 cm for pipes from 150 mm to 150 mm dia and 75 cm for pipes above 400 mm dia and filling back with excavated soil up to 75 % road portion and 25 % shall be made with cement concrete 1:2:4 type B1 (using 20 mm graded stone aggregate complete all as specified and directed. |
| 202 | M&L for Construction of new PCC solid Masonry valve chamber of size 1500 X 1500 X 1500 mm (Internal dimensions) with PCC foundation 1:4:8 type D2 using 40 mm graded stone aggregate 150 mm thick 150 mm wide off sets around over 100 mm thick hard core , 200 mm thick PCC solid block walls built in CM 1:6, 50 mm thick PCC 1:2:4 Type B1 coping finished even and smooth, rendering 10 mm thick in cement mortar (1:6) finished even and smooth, without using extra cement internally including top of floor including excavation earth work in hard/Dense soil 3 mm thick MS sheet cover fixed on 40 mm X 40 mm X 6 mm thick angle iron frame with hold fasts embedded in PCC coping with locking arrangement, mild steel handle and painting to steel surfaces with two coats of synthetic enamel paint over one coat of primer including disposal of surplus soil to a distance not exceeding 50 m etc complete all as specified and directed. |
| 203 | M&L for painting of water distribution header including all control valves and all exposed pipe of any size by using synthetic enamelled spray painting after scrapping /cleaning complete all as directed . |
| 204 | Supply and lay in replacement Pipes MS black ERW Steel including specials having nominal dia 100 mm of thickness 6.0 mm as per IS 3589 - 2001, Grade - 330 with plain ends and specials by welding, leak testing of line laid in trenches / floors/ walls /ducts complete all as specified and directed. Note: Quoted rate is inclusive of supply and fixing of flange of suitable size as required , bends welding and cutting etc as required for fixing of pipe . |
| 205 | Supply and lay Pipes MS black ERW Steel including specials having nominal dia 150 mm of thickness 6.0 mm as per IS 3589 - 2001, Grade - 330 with plain ends and specials by welding, leak testing of line laid in trenches / floors/ walls /ducts complete all as specified and directed.Note: Quoted rate is inclusive of supply and fixing of flange of suitable size as required, bends, welding and cutting etc as required for fixing of pipe . |
| 206 | Core cutting / drilling of Bldg. Roof / Wall for passing of GI Pipe up to 40 mm dia including necessary machineries complete all as specified and directed |
| 207 | Cutting anxious green growth/vegetation growth for cleaning out the area around Pump house/ transformer yard, E/M installations and four pole structure yards at ground level by cutting out roots, un wanted plants bushes and removal of the same by surface excavation not exceeding 30 cm deep average 15 cm complete |
| 208 | Disconnecting and removing the water and electric connections carefully from the existing submersible pump sets of capacity 5 HP to 10 HP and taking out the pump set along with pipes and fittings for flushing the bore well above 450 feet and up to 750 feet depth or repair the pump set and strip opening the pump set for repairs/replacement of worn out spares, refixing of serviceable spares, assembling the pump set completely, testing of pump set, lowering the pump set inside the bore well after repairs including connecting back the water and electric connections, commissioning of pump set for satisfactory operation on its full load complete all as specified and directed. Note :- The spares required for repair the pump sets and rewinding of motors will be measured and paid separately. |
| 209 | M&L for rewinding the Submersible pump Motor with PVC insulated, super enamelled copper conductor with ‘F’ class heavy grade insulation weight and turns to achieve its full efficiency including tying the winding and connecting the coils and brining the connections as that of existing one including applying insulating varnish, heating and backing the windings thoroughly including taking down old existing copper winding complete all as specified and directed for Submersible pump motor of capacity 5 HP to 10 HP :- |
| 210 | Supply only the following spares suitable for existing make of submersible pump set 3 to 10 HP capacity, multi stage for repairs complete all as specified and directed :- |
| 211 | Gun metal Impeller. |
| 212 | Stage casing. |
| 213 | SS Sleeves. |
| 214 | Middle bush.(LB) |
| 215 | Middle sleeve. |
| 216 | Discharge outlet.(LB) |
| 217 | Pump coupling. |
| 218 | DOL SS Sleeve. |
| 219 | Suction bush. |
| 220 | Pump Shaft |
| 221 | Complete removal of existing treatment including preparation of old painted surfaces by washing, rubbing down and stopping of painted surfaces, painting with one coat of synthetic enamel paint of approved colour on centrifugal pump set 7.5 HP capacity including inlet, outlet mains, couplings, sluice valve, non return valve, base plate, pulley with safe guard, vacuum pipe line, LT panel board and writing the MES / SM number with black paint of suitable size of letters complete all as specified and directed. |
| 222 | S&F PVC insulated Copper conductor, sheathed, Submersible flat cables of size 4 Sqmm, 3 core, for Submersible Pumps, 1100 Volts grade, conforming to IS:694/1990 with latest amendments cutting to required length connecting with necessary end ferrules / water proof joints and jointing and testing including disconnecting/taking out old existing cable complete all as specified and directed. |
| 223 | Supply & fixing HDPE heavy duty column pipe in Bore well internal dia 50mm PN 16kq/Sqmm including all necessary fittings and fixtures as requited for fixing with submersible motor Complete all as specified and directed. Note: Quoted rate inclusive of fixing of pipe with submersible motor and lowering in existing bore well |
| 224 | Supply and installation CPRI approved pump starter electric control panel board, for out door use, DOUBLE door dust & vermin proof floor mounted made out of CRCA steel sheet of 3.15 mm thick angle iron legs of size50x50x5mm, having electrolytic high conductivity insulated bus bar made out of aluminium strips of rating 100 Amps for 3 phase, 415 Volts, 50 C/S 4 wire system, with cable entry provision, with suitable lugs gland, voltmeter, Ammeter and phase indicator complete, duly painted with two coats of stove enamelled power coated paint over a coat of red oxide primer complete all as including necessary PCC work of height 300 cm from the ground level including disconnecting/taking out old existing unsv pump panel complete all as specified and directed of the following(Leg of the panel should not be less than 0.75 M and size of the panel should not be less than 70CmX60CMX30CM)) :- |
| 225 | INCOMMING :-(a) MCCB, 4 pole, 415 Volt, 40 Amps, 16 KA - 01 No(b) 3 Phase LED Voltmeter, class - 0.5 - 01 No(c) 3 Phase LED Ammeter, class -0.5 - 01 No(d) LED Indicator lamp in three colour RYB - 01 SetOUTGOING :-(a) MCCB, 3 pole, 10 KA c Curve 415 volts, 32 Amps -01 No(b) DOL starter in sheet enclosure type MK-1, Motor rating AC-3 duty, 415 volts, 50 Hz suitable FOR 7.5 HP relay max rang 15-25 Amps-01 No.(c) Single phase preventer relay type Sz% (6wire), 415 volts -01 No |
| 226 | Supply and fixing of DOL Starter suitable for up to 7.5 HP Motor, 5.5 KW and relay max range 20-32 Amp as in repairs complete all as specified and as directed. Makes : L&T cat part No CS90947 or equivalent of Havells/CG as approved. |
| 227 | Supply and fixing of DOL Starter suitable for up to 5 HP Motor, 3.7 KW and relay max range 20-32 Amp as in repairs complete all as specified and as directed. Makes : L&T cat part No CS90947 or equivalent of Havells/CG as approved. |
| 228 | Disconnecting, dismantling and taking aside the Pump set of 05 to 7.5 HP capacity for replacement of existing base frame with new one from the installed position and dismantling of existing PCC / RCC foundation and refixing the same motor by preparing sufficient PCC foundation and base frame required for 5hp/7.5 hp HP pump including connecting items like nuts, bolts and setting the alignment of motor and pump set testing and commissioning all as specified and directed. Note: The quoted rate will be inclusive of required replacement of base frame/MS channel and PCC / RCC for foundation. |
| 229 | Arresting leakages from pumps of motor capacity 05 HP to 7.5 HP by replacing gasket, nutbolts, gland packing etc as required complete all as directed Note: Rate quoted by the contractor inclusive of all items as require to arrest the leakages from pumps |
| 230 | M&L for flushing of existing bore wells of any size up to 250 Mtrs depth with drilling compressor mounted on truck including surging and flushing the bore at a pressure of 7 Kg / Sqcm with compressed air and flushing the sand, mud including flushing out tree roots etc from the bore well till discharge of the fresh water including testing of water samples for chemical and bacteriological tests and complete all as specified and directed . |
| 231 | Servicing / periodical checking of Starter panel board suitable for 15 HP to 40 HP Motor by replacing all unserviceable parts , checking for any kind of loose contact , identification of fault etc complete all as specified and directed . Note : All spare to be replaced and measured under relevant items. |
| 232 | M&L for Disconnecting the suction and delivery pipe line and electric connections of centrifugal monoblock pump set up to 7.5 HP capacity and removing it from its position carefully and transporting the same to the work shop and refixing the same in its original position after carryout the repairs and connecting back the water and electric connections including testing and commissioning complete all as specified and directed. |
| 233 | M&L for rewinding of centrifugal motor with super enamelled copper conductor of same gauge, weight and turn to achieve its full efficiency including tying the windings and connecting the coils and brining the connections as that of existing one including renewal of worn out/unserviceable bearings etc complete all as specified and directed of capacity up to 7.5 HP |
| 234 | M&L in repair of centrifugal pump set of up to 7.5 HP capacity to achieve the water discharge as per manufacturer recommendation including replacement of worn out unserviceable parts complete all as specified and directed.Notes :-(i) Expendable stores like cotton waste/cleaning materials, lubricants, gland packing, metal filling, machining and transportation to and from site to work shape are deemed to be included in unit rate quoted.(ii) Labour against this item for replacement of spares (supply only items) shall be deemed to be included in the rate quoted.(iii) Spare parts like SS sleeves, impeller, stage casing etc shall be measured and paid separately under relevant item of Sch \"A\". |
| 235 | Supply only the following spares for repairs of Centrifugal pump set of 7.5 to 25 HP capacity complete all as specified and directed :- |
| 236 | Ball bearing drive end for suitable size. |
| 237 | Ball bearing for non driving end of suitable size. |
| 238 | Gun Metal bush. |
| 239 | CI impeller. |
| 240 | MS pump shaft. |
| 241 | Gland cover. |
| 242 | Gland. |
| 243 | Supply and fix Cast iron foot valve swing type flanged of size 50 mm as per IS 4038 . Make Kartar/kirloskar/durga |
| 244 | Advance Maintenance Free G.I. SAFE EARTHING Electrode with PIPE of not less than 50 mm outer dia(THICKNESS NOT LESS THAN -2.5MM) and two meter length, The electrode should be of galvanised (80 -100 micron) along with earth lead as Galvanised steel strip of size 32 X6 mm 7.5 m . The GI Electrode shall be pre-filled with Crystalline Conductive Material (CCM) . The GI electrode shall be surrounded with 25 kg Backfill compound to provide maximum contact between the electrode and Back Fill Compound. .The earthing pit should be cover with pcc(1:2:4 , B1) cover ,of 450 x 450 mm complete all as specified and directed make ASHLOK / INDELEC/JMV /TERCEL/True Power. |
| 245 | Annual Maintenance Contract (AMC) – Automatic Meter Reading (AMR) SystemThe Annual Maintenance Contract (AMC) is for Automatic Meter Reading (AMR) technology, which enables remote reading of electricity meters without manual intervention. Billing is carried out through a GPRS-enabled system that covers data acquisition, meter data management and supply of spare parts/accessories as required for the meters/complete system. The scope includes the following equipment:(Total Postpaid meters in this contract- 849 Nos)(a) Energy meters (b) Data concentrator unit (c) Low Power Radio Frequency (LLRP) communication facility(b) Cloud-hosted multi-user web-based software |
| 246 | Notes:(i) Free online technical support (via phone or remote access) shall be provided within 24 hours of raising a complaint.Service Terms and Conditions:Response Time: The service team must respond to any issue within 8 working hours with a defined action plan. Site visits will be scheduled based on the initial findings and requirements, and customers will be duly notified.Ticketing System: AMC activities will be monitored through an instant ticketing system linked to the email ID to be specified by the tenderer.System Monitoring: The health of device communications with the EMS server shall be monitored monthly, and a report will be shared with the customer. Software maintenance activities such as clearing caches and removing unnecessary log files shall also be carried out.System Crash Support: In the event of a system crash during the AMC period, the tenderer shall reinstall the software at no additional cost. The reinstallation shall be carried out using the previous configuration (subject to operating system compatibility), and existing backups shall be restored in “as-is” condition.System Health Reports: A system health check report shall be shared with the department on a monthly basis. Root cause analysis of issues, along with preventive actions, shall also be provided. |
| 247 | Annual Maintenance Contract (AMC) – Charges & Scope: This AMC pertains to Single Phase / Three Phase Prepaid Energy Meters with the following specifications:(Total Prepaid meters in this contract- 398 Nos)AC Supply: Single Phase / Three PhaseWiring: 2-Wire / 4-WireMeter Type: Tamper-proof, static, Class 1.0 accuracyVoltage: 240 V, 50 HzCurrent Range: 10 – 60 AmpsCommunication: GSM Module (IS 16444 compliant)The AMC charges will cover the following components for a period of 12 months: |
| 248 | (a) Configuration of Meters & Software : (a) Installation, integration, and configuration of prepaid meters with the central server/software platform. (b) Ensuring proper GSM connectivity and data transfer for energy usage monitoring and recharge updates. (c) Periodic firmware/software updates for accuracy, security, and compliance with IS 16444 standards. (d)Reconfiguration support in case of system crash, meter replacement, or connectivity issues. |
| 249 | (b) SIM Card Maintenance Charges : (a) Monthly/annual subscription charges for the GSM SIM card used for real-time communication of each meter. (b) Monitoring and troubleshooting of SIM/network-related issues to ensure uninterrupted data transfer. (c) Replacement of defective SIM cards or re-provisioning in case of network migration/change. |
| 250 | (c) Data Management Charges : (a) 12 months of continuous availability, maintenance, and storage of meter readings, recharge history, and billing records. (b) Implementation of data backup, redundancy, and disaster recovery protocols. (c) Regular software upgrades for the server platform to improve performance, security, and reporting. |
| 251 | (d) Preventive & Corrective Maintenance Services : (a) Periodic health checks of meters, SIM modules, and communication systems. (b) Online and offline support for troubleshooting complaints within defined SLA (response within 8 hours, resolution within 24 hours). (c) Root cause analysis of recurring issues and implementation of preventive measures. (d) Replacement of faulty meters/accessories (if covered under the warranty period from the date of installation) or providing immediate repair support. In case the meter is out of warranty and declared non-repairable, the responsibility for replacement shall lie with the user. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy