| 1 | Demolishing all grades of Plain / Reinforced Cement Concrete including cutting of reinforcement steel bars and removal by mechanical means if required, and disposing the debris within a lead of 2 km within the Factory Area as directed by Engineer-In-Charge. The rate includes hire charges of all machinery / equipment, cutting of steel, labour, unloading, transportation. |
| 2 | Earth work in excavation in all soils by mechanical means (Hydraulic Excavators) / manual means in all works & areas including foundations, trenches, drains, sumps, pits etc., upto all depths including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All as directed by the Engineer-In-Charge, and also involves excavation in soft rock. |
| 3 | Earth work in excavation by mechanical means (Hydraulic Excavators) / manual means in all works & areas foundations, trenches, drains, sumps, pits etc., in all depths including disposal of excavated earth, lead upto 50 m, disposing earth to be levelled and neatly dressed, for Hard Rock(Blasting prohibited) complete all as directed by the Engineer-In-Charge,and involves medium to hard bed rock breaking. |
| 4 | Fillingwith available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidation each deposited layer by ramming and watering, lead upto 50.00 mand lift upto 1.50 m. |
| 5 | Conveyance of earth, excavated soil etc., up to a lead of 2 km, including loading, transportation, preparing dumping yard for unloading, unloading, spreading, levelling, dozing etc., complete all as directed by the Engineer-In-Charge. |
| 6 | Providing and laying in position Plain Cement Concrete of specified grade excluding the cost of centering and shuttering including consolidation by vibrations for all works up to plinth level with 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate of 40 mmnominal size). All materials including Cement and required equipment are in Contractor scope. Only 43 or 53 Grade OPC is permitted. |
| 7 | Providing and laying in positionspecified grade, of Reinforced Cement Concrete excluding the cost of centering, shuttering, finishing and reinforcement - all floor levels with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate of 20 mmnominal size). All materials including Cement and required equipment are in Contractor scope. Only 43 or 53 Grade OPC is permitted. |
| 8 | Providing and laying in position ready mixed M-25 grade concrete upto all heights and elevations, for reinforced cement concrete work, using cement content as per approved design mix, manufactued in fully automatic batching plant and transported to site of work in transit mixer for all leads having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C from trasit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, improve workability without impairing strengthand durability as per direction of the Engineer-In-Charge. (Cement content considered as 330 kg/Cum. Excess / less cement used as per design mix is payable / recoverable separately). All material including Cement and machinery are under Contractor scope.Notes:(1) Generally, OPC 43 or OPC 53 Grade are permitted. In exceptional cases like mass concreting etc., other forms of Cements like PPC or Fly ash based cement will be permitted subject to approval of Engineer-In-Charge. However, reduction in cement content with reference to that of M25 grade concrete with OPC (330 kg/Cu.m) shall be recovered and no additional payment for admixtures like fly ash etc.(2) For Unit Rate of M20 grade concrete (RMC), quantity of cement consumption reduced with reference to Cement content for M25 grade concrete at 330 kg/Cu.m shall be recovered at the cost equal to Unit Rate of Cement mentioned in the Contract under BHEL Free issue material.(3) For all structurally designed cases, cubes casting for assessment of Characteristic compressive strength of Concrete shall be as per IS 456. |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and bindinggrills with binding wire all complete by cold twisted bars / TMT Bars of Fe 500 or above grade.All materials, consumables, binding wires and required equipment are in Contractor scope. Only Steel Reinforcement will be issued free of cost by BHEL at BHEL stores. |
| 10 | Centering and shuttering including strutting, propping etc.; and removal of form for walls (any thickness) including attached pillasters, buttresses, plinth and string courses etc.- All Floor levels |
| 11 | Grouting of bolt pockets with Cement Mortar1 : 1 including the cost of all materials, labour, curing etc., complete. Only Cement will be issued by BHEL free of cost at BHEL stores. |
| 12 | Grouting of pockets and other gaps with Grout Mix as specified proportion by the manufacturer, including cost of labourand incidentals etc. Separate registers should be maintained for Grout material consumption. Cost of Grout material shall be paid separately as extra as per actual consumption. |
| 13 | Installation of Anchor Bolts as directed by the Engineer-In-Charge.Anchor Bolts shall be issued by BHEL free of cost at BHEL stores. |
| 14 | Supply and fixing of various sizes of MS Bolts, Nuts, washers conforming to IS 1367 including cost of all materials, labour charges etc., complete as directed by Engineer-In-Charge. |
| 15 | Brick work withGround moulded clay FPS brick in super structure above plinth level upto and floor five roof level in cement mortar 1:6 (1 cement :6 Coarse sand). Cost includes placing two 6 / 8 mm dia steel reinforcement bars in every fourth layer in case of half brick wall. Cost of placing steel bars shall be paid separately under steel reinforcement. All materials including Cement and required equipment are in Contractor scope. Only 43 or 53 Grade OPC is permitted.Note: No additional payment shall be made in case of usage of PCC solid / hollow bricks in-lieu of clay bricks. |
| 16 | Plastering in CM 1:6, 20 mm thick to internal and external surfaces of walls, ceiling including the cost of all materials, labour, curing etc, complete - upto 10.00 m level. All materials including Cement and required equipment are in Contractor scope. Only 43 or 53 Grade OPC is permitted. |
| 17 | Supply and applying Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade - New / Old work (two or more coats) over and including scrapping, water thinnable priming coat with cement primer at all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 18 | Supply and applying, Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade - New / Old work (two or more coats) applied @ 1.43 ltr/10 Sq.m over and including scrapping, priming coat of exterior primer applied @ 2.20 kg/10 Sq.m at all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 19 | Fabrication of Structural Steel work at all heights & elevationsincluding all materials going into the process of fabrication and forming an integralpart of steel work together with all shop and site rivets and electrodes for site welding as necessary and all site connections like sag rods, beams, girders, plates, flats, channels, anchors, anchor rods, anchor fasteners, levers, clamps, CR 120 / 100 / 80 Rail lines / suitable rails (52 kg/m, 62 kg/m etc.,)for - EOT Cranes, Gantry Cranes, Rail tracks, check rails, turnouts, crossings, fish plates, MS nuts, bolts, washers, springs, wedges, supply of Foundation bolts for Clamping bars / Clamping Bess/ Machine foundations etc., of required dia and length conforming to IS 1367, screws, wedge plates, packing pieces, chains, links, cleats, bracings, trusses and frame work for fixed false ceiling and for movable false ceiling, purlins with channel, angles, MS flat supports including all connections as per detailed drawings connected steel works etc., cleats, gusset plates, all bolts, nuts, washers, base plates, Clamping Bars, Clamping Beds, required fasteners of Clamping Bars & Beds, as per detailed drawings, cutting, welding before erection etc., complete.The rate shall include painting 2 coat of Red-oxide primer as per IS specifications (except rails etc.,) and all charges for handling, leading, loading, unloading, transportation, including all. No payment for wastage i.e., material which do not become integral part of the steel work shall be paid. Erection charges shall be paid separately. Cost also includes making required threading & machining of foundation bolts to required size.Required cutting gases will be issued free of cost by BHEL at respective stores. All welding rods are in Contractor scope. |
| 20 | All above materials are in Contractor scope.The rate includes consumables, loading, transportation, unloading, weighment of material.Make: SAIL / RINL / TATA / JINDAL or as approved by the Engineer-In-Charge. |
| 21 | Only raw materials like Structural Steel sections, foundation bolts, anchor bolts etc., will be issued free of cost by BHEL at BHEL Stores. The rate includes consumables, loading, transportation, unloading, weighment of material. |
| 22 | Erection of all kinds of Structural Steel work including wedges, plates, EOT / Gantry Rails, foundation bolts of Clamping bars / Clamping beds / Machine foundations etc., or any other BHEL Free issue material required for the work like Clamping Bars, Clamping beds, Rails etc., to alignment to 0.1mm/m accuracy including its transportation from BHEL Stores, machining, if required, etc., or as directed by Engineer-In-Charge including charges for transportation from Contractor / BHEL Stores, handling, leading and stacking at site at approved locations prior to erection including all site levelling, rivetting, bolting, jointing and site welding where ever required at all heights. All welding rods, cutting gases are in Contractor scope. |
| 23 | Painting with Aluminium Paint of approved brand and manufacture to give an even shade. Two or more coats on new work of STEEL SURFACE at all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 24 | Painting with Synthetic Enamel Paint of approved brand and manufacture to give an even shade: Two or more coats on new work of STEEL SURFACE at all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on FLOORING / GANGWAY / ALL SURFACES at all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 26 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. - On all material surfacesat all heights & elevations. All materials, required scaffolding and all other incidentals are in Contractor scope. |
| 27 | Supply, stacking, spreading, placing / filling, rolling / compacting, if required, of Construction Material. Cost includes filling under floors, including watering, ramming, consolidating and dressing complete, as directed by Engineer-In-Charge.- Coarsed Natural / River Sand having bulk density of 1500 to 1680 kg/Cu.m and water absorption of max. 12%, conforming to IS 383, at required site as directed by the Engineer-In-Charge. Sand graded to Zone-IV of IS 383 is not acceptable. No other sand is accepted. |
| 28 | Providing Granolithic topping of 25 mm thick using 1 part cement and 1 part granite stone chips by volume of 10 mm down graded laid over base concrete when it is in green condition and ironite finishing 12 mm thick using a mix of 50 kg of ironite, 200 kg of cement and 0.30 Cu.m of granite stone chips / metal of 6 mm down graded including cost of form work, cement, granite chips,ironite, labour,machinery, curing etc., complete as directed by the Engineer-In-Charge. |