| 1 | SITC of Dome Camera Fixed dome 2MP HDR 3-9mm IR IN with complete accessories meeting technical specifications etc. complete as required. |
| 2 | SITC of Bullet Camera FixedBullet 5MP 3.3-10.2mm IP66 IK10 IR with complete accessories meeting technical specifications etc. complete as required. |
| 3 | SITC of PTZ Camera AUTODOME IP starlight 5000i IR, 30X, IP 66, 1080p with suitable lens, wall mountcover & other accessories meeting technical specifications etc. complete as required. |
| 4 | Supply of Video Management System, Video Analytics Software, & Digital Video Surveillance Control Software (Including upgradation/ replacement of existing system, if required) for complete system consisting of Servers/ Workstations/ NAS, to be supplied with media (2 Nos. of Software CD at each site) to meet the technical & functional requirements at each site, with per camera licence etc. complete as required. |
| 5 | SITC of Network Attached Storage (NAS): SAS/SATA Disk (in RAID 6 Configuration), suitable power socket, DC power converters, connectors, cables etc. complete as required. Network Attached Storage (NAS) shall be supplied for the complete storage for all cameras (as mentioned above) for 24x7 in real time mode for a period of 30 days and additional 25% vacant space in NAS. |
| 6 | Supply and fixing of following capacity indoor rack consisting of Double Fan For Wall Mount, Metal Cable Manager, Plastic Cable Loop\"s Mountable, Mounting Hardware Packet, Power Distribution Unit, Power Cable 2.5 sq.mm 3 meter Length and earth stip bare etc. and making connections etc. complete as required. |
| 7 | (a) 12 U rack (Make: Legrand) |
| 8 | (b) 15 U rack (Make: Legrand) |
| 9 | SITC of L2 Switch - LOCATION OUTDOOR (24 Nos. of 10/100/1000 Mbps PoE Copper Ports and 4 Nos. of 10 Gbps SFP ports fully populated with required modules) with 24 Port Jack Panel, 9U Rack, SM Optic Fibre and Cat-6 patch cords, Connectors, etc. as required complete as per specifications. |
| 10 | Supply and laying of 4 pair count, Category 6A U/UTP Cable, white jacket, CAT6A Cable (Make: Commscope), meeting technical specifications etc. complete as required.in the existing Raceway/Cable Tray /Conduit etc. complete as required. |
| 11 | Supply and laying of 6 core, optical fiber cable (Make: Commscope), meeting technical specifications etc. complete as required.in the existing Raceway/Cable Tray /Conduit etc. complete as required. |
| 12 | Supply and fixing of singlemode LIU, OS2, black + TeraSPEED® LC/UPC to Unconnectorized, Fiber Pigtail, 0.9 mm SBJ, minimum length 3 feet etc. as per Specification along with all accessories and making connections etc. complete as required. |
| 13 | SITC CAT6A Patch Cord of following length as per Contract Agreement Specification, connections etc. as required. |
| 14 | (a) 01 Metre |
| 15 | (b) 02 Metre |
| 16 | SITC of SMF/MMF/ SFP MODULES as per Contract Agreement Specification, including connections etc. as required. |
| 17 | Supply and fixing of singlemode LC/UPC to LC/UPC, optical fiber patch cord, 1.6 mm Duplex, Low Smoke Zero Halogen (LSZH), of suitable length etc.as per Contract Agreement Specification along with all accessories and making connections etc. complete as required. |
| 18 | Supplying and fixing suitable size GI box with Dual Outlet IO Module face plate & IO Module, connections etc. as required. |
| 19 | SITC of following port Patch Panel as per Contract Agreement Specification, and making connections etc. complete as required.(a) 24 Port Panel |
| 20 | SITC of following Port POE Switch for CCTV as per Contract Agreement Specification, connections etc. as required.(a) 24 Port POE Switch (Make-CISCO) |
| 21 | Supply of 40mm (OD), PN-10, PE-100, HDPE pipe confirming to IS: 4984 - 1995 with upto date amendments and confirming to technical specifications, terms and conditions i/c loading, unloading etc., and laying of 40mm Dia HDPE pipe by HDD (Horizontal direction drilling) work using trenchless technology for cable laying below ground etc. complete as required. |
| 22 | Supply of Optical Fiber Cable of 6 Core, Single Mode, armoured cable as per technical specification attached. |
| 23 | Pulling / drawing of one number Optical Fiber cable in the existing HDPE/GI/RCC/hume pipe. |
| 24 | Supply and laying of 3 core 2.5 sq.mm multistrand PVC insulated PVC sheathed copper conductor power cable in existing conduit/pipe/ on surface/recess/ concealed including all accessories, termination, etc. as required. |
| 25 | Supply and laying of 3 core 6 sq.mm multistrand copper conductor PVC insulated PVC sheathed armoured power cable on surface/recess/ concealed including termination etc. required as required. |
| 26 | SITC of GI Pole dia 100 mm (up to 6 Mtrs.) with base plate of size 300mm X 300mm X 6mm for mounting camera suitable complete with weatherproof junction box with all accessories by providing REINFORCED CEMENT CONCRETE and Steel reinforcement as per the design of Pole Manufacturer and providing required Sets of suitable \"J\" type foundation GI bolts, separate adequate size HDPE/UPVC pipes for incoming and outgoing cables to weatherproof junction box in the RCC including excavation and refilling etc. complete as required. |
| 27 | Providing required accessories, licenses, miscellaneous items, any other material or devices required in addition to above for successful installation, testing, and commissioning of entire CCTV system as per specifications, and carrying out all allied works including networking, intergration with existing system, cabling, configration, splicing, training, and documentation at site etc. complete as per Project requirement. |
| 28 | All Inclusive Annual Comprehensive Maintenance Contract of complete CCTV system including supply of all spares & consumables (after expiry of 02 Years DLP Period). |
| 29 | (a) 1st Year (After Completion of 02 Years DLP Period) |
| 30 | (b) 2nd Year (After Completion of 02 Years DLP Period) |
| 31 | (c) 3rd Year (After Completion of 02 Years DLP Period) |
| 32 | (d) 4th Year (After Completion of 02 Years DLP Period) |
| 33 | (e) 5th Year (After Completion of 02 Years DLP Period) |