| 1 | NOTES :The bidders/contractorsare advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. |
| 2 | Material & labour of repair to pot holes of any depth not exc 1.00 Sqm each incl sweepingfree from dust and mud or water, scoring sunken surfaces in roads, paths etcand cutting around edges to at least 25mm in depth and making good by applying tack coat of bitumineous primer VG-10 at 5 kg/ 10 Sqm putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sqm, binded with 0.09 cum of stone chippings, 6.3mm size and again well rammed complete all as spd & directed. Depth of pot holes exc 30 mm. |
| 3 | Material & labourfor preparation of black top surfaces by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etccomplete all as specified & directed. |
| 4 | Material & labourforapplying a tack coat over existing bituminous surface @5 Kg/ 10 Sqm of 20/30 bitumen and providing and laying 20mm thick (consolidated thickness) bitumen mastic asphalt on prepared surface strictly in accordance with IS : 1195 of 1978 (as latest modified) with mastic i.e. bitumen of grade 20/30 @8.98 Kg /Sqm (minimum) mixed stone dust (lime stone powder with calcium value 80%) @0.016 Cum/Sqm and stone chipping of size 12.5mm and 10mm @0.0192 Cum/Sqm and sand @0.008 Cum per sqm with bitumen of grade 20/30 and finally providing stone aggregate of size 20mm @0.005 Cum / Sqm, mixed with 0.017Kg/Sqm of bitumen of grade 20/30, for anti skiding including all material, labour, tools and plants etc complete all as specified and directed by Engineer-in-Charge. |
| 5 | Material & labourfor preparing bituminous surface of road and marking 2.5 mm thick centre lines, stop lines, dashes, arrows, letters, zebra cross etc and the like n.exc 10cm wide on roads, pavements with hot applied thermoplastic road marking paintof approved colour as per IRC 35 conforming to BS 3262-1989 with 20% glass beads (intermixed), spread and laid by automatic mechanical machine engine drivecomplete all as specified and as directed. |
| 6 | Supply and fixing in repairplastic speed bump of 750mm length x 250mm width x 75 mm high and made of ABS materialwith 2 nos high reflective reflectors moulded in PMMA and fixed with 4 nos nail and epoxy adhesive (base bumper & hole) on road surfacecomplete and fixingas per manufacturer\"s instruction and all as directed by Engineer-in-Charge. |
| 7 | Supply and fixing of Cat\"s eye Road stud, solar reflective type,metal body alloy,size 100mm x 100 mm x 20mm with PAMA striplens reflector with and incl MS stud of suitable size complete and fixing as per manufacturers instructions and all as directed by Engineer-in-Charge. |
| 8 | Supply and fixing in repair of SolarStud (blinker), aluminium alloy (100% water proofing design ) of size 125mm x 125mm x 25mm (shank 65mm) of high efficieny Mono crystaline solar panel 2.4V / 0.3 watt one Ni-mh rechargeable battery (1.2V / 1600MA) consisting of super bright LED with 10,000 to 18,000 mcd complete and fix to road with epoxy based adhesive as per manufacturers instructions and complete all as specified and as directed. |
| 9 | Material and labour for 100mm thick (Spread thickness) Moorum / Red bajri spread, rolled and consolidated to gradient and camber required with 8 to 10 tonne power roller as in light wearing surfaces i.e. road side berms complete all as specified and directed. |
| 10 | Demolition of cement concrete in ground floors and pavings not exc 15cm thick (below or above ground levels) all as specified and directed |
| 11 | Material & labourfor 75mm thick PCC M-10(Nominal Mix) (using 40mm graded crushed stone aggregate) as in sub-bases of flooring complete all as specified and directed. |
| 12 | Material ,Labourand laying 60mm thick factory made chamfered edge cement concrete paver block of M-35 grade confirming to IS 15658-2006 with approved colour, design & pattern as in footpath, parks, lawns, drive ways or light traffic parking etc., of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 50mm thick compacted bed of fine sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sandcomplete all as specified and as directed. |
| 13 | Material & Labour for 25mm thick prepolished colured PCC chequered tiles of size 400 x 400 x 25mm set and jpointed in neat cement slurry and pointed in cloloured cement o match the shade of tiles with and including 20mm thick screed bed in CM 1:6 complete all as specified and directed |
| 14 | Note: Schedule of credit (SCHEDULE OF CREDIT)amountshall be deducted from the total quoted amount of BOQ. |