| 1 | (Construction of subgrade and Earthen shoulders)Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(Excluding GST) |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MORD Technical Speicification Clause 401(Excluding GST) |
| 3 | Providing, laying, spreading and compacting stone aggregates of 45-63mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.(Excluding GST) |
| 4 | Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.(Excluding GST) |
| 5 | Brick edging on both side of the S.O.B. brick 8 cm. (3\") wide and 12 cm. (4 1/2) deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing and ramming the excavated earth including all labour T & P sudries required for proper completion of the work as per S.O.R. 2014 S.I. No. 765(Excluding GST) |
| 6 | Providing and applying Primer coat with bitumen emulsion on prepared (SS-2) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg / sqm using mechanical means. As per technical specification clause 502(Excluding GST) |
| 7 | Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.3kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10)(Excluding GST) |
| 8 | Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508 including cost of bitumen(Excluding GST) |
| 9 | Providing and applying seal coat type \"C\" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510 including cost of bitumen(Excluding GST) |
| 10 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.(Excluding GST) |
| 11 | Plain cement concrete M10(1:3:6 nominal mix) in levelling course below open foundation of head wall as per drawing and technical specification clause 1109.(Excluding GST) |
| 12 | Layig (40mm SSB)Bedding on well compacted sand,moorum or approved granular material as per Clause 1105(ii) (Excluding GST) |
| 13 | Brik Masonry Work in cement mortar (1:4) in foundation of head walls complete excluding poining and plastering as per rawing and technical specification Clause 1109(Excluding GST) |
| 14 | Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.(Excluding GST) |
| 15 | Pointing with cement mortar (1:3) on brick work as per technical specification clause 613.3(Excluding GST) |
| 16 | Backfilling from local sand in foundation trenches as per drawing and technical specification Clause 1108. 30% of Item no. 3(Excluding GST) |
| 17 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301(Excluding GST) |
| 18 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302(Excluding GST) |
| 19 | Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 I. Stone/Boulder(Excluding GST) |
| 20 | Providing & laying of Kilo Meter/Hectometer and Sign Board including costn of all material &transpotation to site,labour T&P etc.required proper complete of work.(Excluding GST) |
| 21 | Maintenance of Constructed Road for next Five Year after completion of work Shall be paid as per G.O. No. 17/2024/सा०-113/23-1-2024-23-1099-113/2023 लोक निर्माण अनुभाग- 1दिनांक 16.01.2024 एवं कार्यालय प्रमुख अभियन्ता यातायात वर्ग लो०नि०वि० लखनऊ का पत्रांक-3689-ओ०पी०आर०एम०सी०/मूल-23-24 दिनांक 17;02;2024 Payment Shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including Labour Cess but GST will paid Extra as applicable.) 1st Year Maintenance cost total construction of cost item No. 1 to 17 Rs,. 12760951.00 @ Zero Percent & for 2nd year @ 0.75% |
| 22 | Maintenance Charge for Third Year@ 1.5% |
| 23 | Maintenance Charge for Fourth Year@ 2.25 % |
| 24 | Maintenance Charge for Fifth Year@ 3 % Please Enable Macros to View BoQ information |