| 1 | nirman work |
| 2 | Exavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & lead upto…..as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (including royalty).(S.I.No.251) |
| 3 | Cement concrete with 2 cm. (1½\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.no.281) |
| 4 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item. (but for slabs.) S.I.No.284(A) |
| 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks.(S.I.no.504) |
| 6 | First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.No.305) |
| 7 | First class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.No.305+309+310) |
| 8 | Cement concrete with 2 cm. (1½\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.(S.I.no.279(i)) |
| 9 | 12 mm thick plaster with cement and course sand of 1.25 F.M. Mortar in 1:4 brick work minimum thickness not to be less than 3/8\" (10 mm) thick including supply of all materials, labour and T&P etc. required for proper completion of the work. (S.I.No.584 i) |
| 10 | sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km from the site of work & including watering, dressing etc. completion of the work si no 255 |
| 11 | construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spredading, granding to required slope and compacting to meet requirement of table 3.16(305) (5 km carted) |
| 12 | Mild steel or iron of small size and section such as holding down bolts hold fast tie….required for proper completion of work fabrication work si no.502 |
| 13 | distamper one coat with oil bound distamper of approved brand…..including cost of all materials si no(649+650) |
| 14 | poviding and applying plaster of paris putty of 2mm thickness over platered surface to prapare…smooth complete AS PER DSR 13.26 |
| 15 | finishing walls with water proof cement paint of approved make and quality on new work with two coats to give as shade….si no (660+661) |
| 16 | collection of 22.4.53 mm guage stone ballast of approved quarry duly stacked at site including cost of material loading, unloading, carriage, royalty, testing charges & all other taxes including trade tax etc. for proper completion of work as per direction of E/I |
| 17 | same as above but collection of screening material type \"B\" as per item of work |
| 18 | consolidation of stone ballast including opening out stacks, spreading stone ballast in proper dressing, makingm medhi to retain water and also including carriage of metal upto 30m, supply and maintanance of barriers, caution posts, light at night and including arrangment of water for consolidation required for proper completon of the work as directed by E/I by hand roller |
| 19 | P/L of factory made 80mm thick interlocking cement concrete tiles. S..I for road work Please Enable Macros to View BoQ information |