|
| 1 | PHASE-I Surface excavationn exc 30 cm deep and averaging 15cm deep and getting out in soft /loose soil completeall as specified and directed |
| 2 | Removing excavated material exc. 250m but not exceeding 500m and depositing where directed at a level n.exc 1.50m above the starting point completeall as specified and directed |
| 3 | Supply only and stacking of good earth as approved by GE/Engr-In-Charge at site brought by the contractor outside of MOD land at his own arrangement including royality and deposited on natural ground by trimming it properly and filling upto 30 cm depth .Earth measured in stacks will be reduced by 20 % of volume including for payment completeall as specified and directed . |
| 4 | Supply only, stacking and dumping manure of neem cake and cow dung of good qualities screened through sieve of IS designation 4.75mm as approved by GE / Engr-In-Charge including carriage outside from MOD land (manure measured in stacks will be reduced by 8% for payment) completeall as specified and directed |
| 5 | Surface dressing n exc 15 cm deep for the area Coming under cutting and filling shall be cleared of shrubs vegetation, grass, bush, weed, trees and saplings and trimming of natural ground,rough excavated surfaces completeall as specified and directed |
| 6 | Spreading and levelling of sludge / dump manure and good earth in required thickness and proportion (cost of sludge, dump manure and good earth to be paid separately as per ser item No. 3 & 4) completeall as specified and directed |
| 7 | M & L for Mixing with earth, sludge or manure (neem cake and cow dung in ratio 1:10 by volume) in proportion completeall as specified and directed |
| 8 | M & L for Digging holes in ordinary soil and filling the good learth mixed with manure or sludge in the ratio of:2:1 by volume-(2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) completeall as specified and directed (a) Holes 60cm dia and 6Ocmdeep (2000 Nos)(b)Holes 1.20m dia and 1.20m deep (280 Nos) |
| 9 | M & L for Grassing with natural carpet grass selection No i grass including watering till the grass forms a thick lawn fill free from weeds and fit for mowing includng supply of good earth and manure if needed (in rows 7.5 cm apart ineither direction Maintenance of the lawn incl watering ,cleaning weeding,fertilisation ,watchup to avoid animal entry,cutting of lawns ,hedge, creeper. ground Cover,shrubs trees and remain responsible for replacement of deadplants, shrubs, grass and other casualitiescompleteall as specified and directed |
| 10 | Maintenance of Arboriculture for one year, including spreading of cow dung of chemical, removal of waste leafs and supply water and replace dry plant in 1st Year completeall as specified and directed |
| 11 | Supply & Labour for developingof Ficus pandas (4\"-5\") plants at site, stacking and plantation with good earth mixing with manure including watering till the Plants grown healthy permanent plants (perinial as specified. All plants /Shrubs must be approved before planting. Maintenance of the lawn including watering ,cleaning ,weeding including supply of good earth and manure if needed ,watchup to avoid animal entry,cutting of lawns ,hedge, creeper, ground cover ,shrubs trees and remain responsible for replacement of dead plants shrubs and other casualities complete all as specified and directed for one year till the completion of Ph-I work. |
| 12 | All as per Ser Item No 11 above butFicus Benjamina: 4-4.5 (1.20m to 1.35m) height will developed complete all as specified and directed |
| 13 | All as per Ser Item No 11 above but Ficus vaigetea complete all as specified and directed |
| 14 | All as per Ser Item No 11 above but Bottle Palm (3-4\") complete all as specified and directed |
| 15 | All as per Ser Item No 11 above but Bauhinia alba (kachnar)& purporia complete all as specified and directed |
| 16 | All as per Ser Item No 11 above but Caliesteuman iatus. ansao (golden bottle brush) complete all as specified and directed |
| 17 | All as per Ser Item No 11 above but Pulmeria alba & autifolia complete all as specified and directed |
| 18 | PHASE-IIMaintenace of Arboriculture (Plants, Gardens, Tree Plants etc) for one year(365 Days), including spreading of cow dung, Pesticides and fertlizers , removal of waste leafs trimming, suitable support for treesand supply water and replacement of dry plant of approved size and shapein 1st year from the date of completion of Phase-I work completeall as specified and directed . |