| 1 | Excavating in trenches n exc 1.5 m wide and n exc 1.5m in depth , for foundation ,etc or for shafts, wells , cesspits, main holes etc.n exc 10 sqm on plan and n exc 1.5 m depth and getting out on soft/ lose soil and addedadditional 1.5 m or part thereof in depth beyond the first 1.5 m complete all as specified and directed. |
| 2 | Excavation in trenches in soft/loose soil not exceeding 1.5 metre wide and cum exceeding 1.5metre depth but n.exc. 3 m in depth for foundation for poles etc complete all as specified and directed. |
| 3 | Returning, filling in, including spreading , levelling , watering and well ramming in layers not exc 25cm of any soil complete all as specified and directed. |
| 4 | Removing excavated materials(soils) n exc 50m and depositing where directed at a level n exc 1.5m above the starting point complete all as specified and directed. |
| 5 | Supply and spreading ofdry river bed sand for cushioning and covering the under ground cable in trenches ( Punned down thickness shall be measured) complete all as specified and directed. |
| 6 | Supply, laying and replcement of PCC covers, class LV type-1 flat size 250x150x40mm, ISI marked complete all as specified and directed. |
| 7 | Supply & lay HDPE pipe 65mm bore for laying of LT cables etc complete with all accessores complete all as specified and directed. |
| 8 | Supply & lay HDPE pipe 50 mm bore for laying of LT cables etc complete with all accessores complete all as specified and directed. |
| 9 | Supply and Laying in trenches or drawn through pipe or fixed on wall / poles , LT UG cable 1100 Volts, heavy duty XLPE insulated, screened, PVC bedded, galvanised steel strip or wired armoured with aluminium conductor after removing old one complete all as specified and directed of followingsize:- |
| 10 | (a) 16 sqmm 4 core |
| 11 | (b ) 25 Sqmm 4 core |
| 12 | (c) 35 Sqmm 31/2 core |
| 13 | (d) 50 Sqmm 31/2 core |
| 14 | (e) 70 Sqmm 31/2 core |
| 15 | (f) 95 Sqmm 31/2 core |
| 16 | (g)120 Sqmm 31/2 core |
| 17 | (h) 150 Sqmm 3.5 core |
| 18 | Material & Labour for demolition and making good the damaged Tar Road by using existing specificatios complete all as specified and directed. |
| 19 | Material & Labour for repair of LT Panel board of any size with replacing the unserviceable MCCB,MCB,switch fuse unit , change over ,Busbar,etc jointig cable with proper lugs ,nut , bolt and washers, cleaning the panel by using of CRC Soluation and repairing thhe panel door by using hinges and repairing the lock system, welding etc painting the LT Panel wit one coat of primer & two coat of synthetic enamel paint as approved complete all as specified and directed.Notes:(i)MCCB, MCB, Switch fuse unit and change over switch shall be measured and paid separately.(ii) Labour for MCCB, MCB, Switch fuse unit and change over switch shall be measured and paid separately.(iii)Rate of newlugs,CRC Solution,nut,bolt, painting and washers shall be deemed to be included in quoted rates. |
| 20 | Supply and fixing in replacement MCCB, 4 Pole, 630 Amps , with breaking capacity 36 KA , fixedtype,adjustable typetheRunning Meteral setting 70-100% AC 415 volt ,50 HZ and connectingcomplete all as specified and directed. |
| 21 | Supply and fixing in replacement MCCB, 4 Pole, 400 Amps , with breaking capacity 36 KA , fixedtype,adjustable typetheRunning Meteral setting 70-100% AC 415 volt ,50 HZ and connectingcomplete all as specified and directed. |
| 22 | Supply and fixing in replacement MCCB, 4 Pole, 250 Amps , with breaking capacity 36 KA , fixedtype,adjustable typetheRunning Meteral setting 70-100% AC 415 volt ,50 HZ and connectingcomplete all as specified and directed. |
| 23 | Supply and fixing in replacement MCCB, 4 Pole, 200 Amps , with breaking capacity 36 KA , fixedtype,adjustable typetheRunning Meteral setting 70-100% AC 415 volt ,50 HZ and connectingcomplete all as specified and directed. |
| 24 | Supply and fixing in replacement MCCB, 4 Pole, 100 Amps , with breaking capacity 36 KA , fixedtype,adjustable typetheRunning Meteral setting 70-100% AC 415 volt ,50 HZ and connectingcomplete all as specified and directed. |
| 25 | Attending breakdown complaint of OH conductors of any size and repairing the conductorby using additional conductor of same size for fiing on poles incl binding wire etc complete all as specified and directed.(Note - All T&P required for attending the comlaint incl safety devices will be the contractors responsibility) |
| 26 | Material and labour for spray painting the LT Steel tubular pole,9 mtr long with two coats ofsynthetic enamel paint including prepartion of surfaces,Scraping the old paint and writingpole No in Black letter under yellow circle with alternative layers of black and white strip upto 1.5 mtr from GL complete all as specified and directed. |
| 27 | Supply, installation, commissioningand testing ofswitch Air break, Gang operated with 12insulator polymer typetypeswitch Triple pole mechanicaly operated, mounted oninsulator and steel frame, with mechanism worked from ground level, for current rating 200 Amp operating Voltage 11 KV out door type vertical mounted typecomplete with locking arrengement, assembly with fuse mountcarrier and fuse element of required capacity and isolate suitable for 11 KV including necessary electric connection and 11 KV fuse (drop out type) of capacity as per site requirement and as specified by Engr Incharge , complete with DO fuses assembly with channel andone No. operating Rod of 25 mm dia bore mediumgrade GI pipe of suitable length worked out from ground level and handle complete with lock and two Noskeys incl flat iron clamp 50mm x 6mm MS channel of suitable size & length for fixing GOD incl nut,bolt, washers including disconnecting and taking down the old unserviceableGOD & accessories ; Complete all as specified and asdirected. |
| 28 | Material & Labour for checking of HT UG 11 KV XLPE faulty cable with HT UG cable fault locating testing machine, rectifing the fault, putting the jointing kit and charging the cable as all as specified and directed.Note :- Minimum length 500 m shall be for each Job.(The rate for excavation & earth work, removing of old cable, laying after repairs shall be demmed to be included in the rate quoted by the contractor). |
| 29 | Supply and Fixing in repairs bus bar enclosure 800 mm x 600 mm x 200 mm made out of3 mm thick CRCA steelduly powder coated and including 200 amp, 25 kAMCCB 4 pole, theRunning Meteral magnetic based fitted in bus bar enclosure using 300 Amp rated busbar aluminiumand RYB indication lamps duly protected by 2A SP MCB outdoor type welded to suitable size MS angle iron frameand embedded in PCC 1:2:4 type B-1 ; Complete all as specified and asdirected. Note - Height of the enclouser from ground level should not be less than 0.5 metre. |
| 30 | Supply and Fixing in repairs bus bar enclosure 800 mm x 600 mm x 200 mm made out of3 mm thick CRCA steelduly powder coatedand including100 amp, 25 kAMCCB 4 pole, theRunning Meteral magnetic based fitted in bus bar enclosure using 150 Amp rated bus bar aluminiumand RYB indication lamps duly protected by 2A SP MCB outdoor type welded to suitable size MS angle iron frameand embedded in PCC 1:2:4 type B-1 ; Complete all as specified and asdirected. Note - Height of the enclouser from ground level should not be less than 0.5 metre. |
| 31 | Material and labour in repairs for earthing complete with galvanised steel earth plate electrode 600 x 600 x 6.0 mm thick, buried verticallyin ground (Each pit not less than 2.25 mtrs deep below noRunning Meteral ground level with top edge of plate not less than 1.50 M below noRunning Meteral ground level) connected to GI strip 32 x 6 mm , by means of bolts, nuts, and check nuts and washers etc encased in GI protection pipe 40 mm dia light grade pipe for protection of GI earth strip both to be provided to the extet of 7.5 meters, all as shown on electrical plate No 3 of MES SSR - 2004 Part - I, GI protection pipe buried in ground, laid under floors / plinths or mixed on walls / pole etc or concealed in walls etc; with provision of mixture of charcoal dust and common salt packed upto minimum 150 mm all around the earth plate, including PCC 1:2:4 type B-1 earth pit with M.S angle iron frame, cast iron cover with locking arrangement, with GI 20 mm dia medium grade pipe and MS funnel with wire mesh for watering arrangement, including necessary excavation and earth work in any type of soil / strata and testing on completion complete all as specified and directed.Note:- i) Cost of GI strip 32 x 6 mm and protection pipe 40 mm dia is deemmed to be included in rate quotedii) Excavation & earth workofany type of soil shall be deemed to be included in rate. |
| 32 | Supply and fixing ACSR conductor, any size, type as directedcomplete all as specified and directed. |
| 33 | Material & Labour for dismantling of OH conductor of any size complete all as specified and as directed by Engr in charge |
| 34 | Material and labour for cleaning away all grass vegetation sapling shrubs bushes from under roots and tress not exceeding 30 cm girth and removing upto distance of 50 mtr out the periphery of area under cleannessincluding levelling of the area complete all as specified and directed. Note : T & P required for this job to be brought by the contractor and shall be included in qouted rate.. |
| 35 | supply and fixing in true vertical position steel tubular poles 11m long complete with cast iron base plate final taper plug bolts, nuts and screws tyoe 410 SP-55 confiRunning Metering to relevant IS including one primer coat of red oxide ant two coats of aluminimu paint and two coats of bituminous paint inside and oustide of botom portion up to 1.8 mtr length all as specified and provide circular bend 1 No of width 2 cm with alternative layers of black and white strip upto 1.5 mtr from GL complete including dismantling of old existing PCC pole complete all as specified and directed.( Excavation & earth work shall be deemed to be included in qouted rate. PCC in foundation & coping shall be measured and paid for separately). |
| 36 | supply and fixing in true vertical position steel tubular poles 9m long complete with cast iron base plate final taper plug bolts, nuts and screws tyoe 410 SP-31 confiRunning Metering to relevant IS including one primer coat of red oxide ant two coats of aluminimu paint and two coats of bituminous paint inside and oustide of botom portion up to 1.8 mtr length all as specified and provide circular bend 1 No of width 2 cm with alternative layers of black and white strip upto 1.5 mtr from GL complete including dismantling of old existing PCC pole complete all as specified and directed.( Excavation & earth work shall be deemed to be included in qouted rate. PCC in foundation & coping shall be measured and paid for separately). |
| 37 | Material and labour cement conctere 1:4:8 type D-2 (using40mm grade aggregate) as in foundation of pole and similar work complete all as specified and directed. |
| 38 | Material & Labour for PCC (1:3:6) type C-2, (using40mm graded stone aggregate) as in coping of pole and similar work including necessary form work complete all as specified and directed. |
| 39 | Material and Labour for finding UG cable fault of LT Cable by excavation and repairing the cable of various sizes with straight through joint and returning refilling of trenches and removal of extra soil fromsite complete all as specifiec and directed for the following :-LT cable 3.5/4 core 10 Sqmm to 35 Sqmm incl straight through joint (Note -Excavation and earth work shall be deemed to be included in qouted rate ). |
| 40 | Material and Labour for finding UG cable fault of LT Cable by excavation and repairing the cable of various sizes with straight through joint and returning refilling of trenches and removal of extra soil foRunning Meter site complete all as directed for the following :-LT cable 3.5/4 core 50 Sqmm to 95 Sqmm incl straight through joint (Note -Excavation and earth work shall be deemed to be included in qouted rate ). |
| 41 | Material and Labour for finding UG cable fault by excavation and repairing the cable of various sizes with straight through joint and returning refilling of trenches and removal of extra soil fromsite complete all as specifiec and directed for the following :-LT cable 3.5/4 core 120 Sqmm to 300 Sqmm incl straight through joint (Note -Excavation and earth work shall be deemed to be included in qouted rate ). |
| 42 | Material & Labour cable straight through joint boxtypesuitable for 11 KV U/G XLPE screened PVC bedded GI Strip or wire aRunning Meteroured cable size 50 to 95Sqmm 3 coreheat shrinkable, , teRunning Meterination kit jointing materialconnected to electrical systemwith and including cable pieces of suitable size length, and the tap vice type compelete all asspecified and directed. |
| 43 | Material & Labour cable straight through joint boxtypesuitable for 11 KV U/G XLPE screened PVC bedded GI Strip or wire aRunning Meteroured cable size 120 to 185 Sqmm 3 core , heat shrinkable, , teRunning Meterination kit jointing materialconnected to electrical systemwith and including cable pieces of suitable size length, and the tap vice type compelete all asspecified and directed. |
| 44 | Material & Labour outdoor type cable end teRunning Meterination kit, heat shrinkablejointing material and accessary completesuitable for 11 KV HT XLPE underground cable size 50 to 95 sqmm 3 core including testing after jointing complete all as specified and directed. |
| 45 | Material & Labour outdoor type cable end teRunning Meterination kit, heat shirnkablejointing material and accessary completesuitable for 11 KV HT XLPE underground cable size 120 to 185 sqmm 3 core including testing after jointing complete all as specified and directed. |
| 46 | Material & Labour outdoor type cable end teRunning Meterination kit, heat shrinkablejointing material and accessary completesuitable for 11 KV HT XLPE underground cable size 240 to 300 sqmm 3 core including testing after jointing complete all as specified and directed. |
| 47 | Material & Labour for prunning and removing of tree branches touching to electric over head lines wild growth around LT /HT over head lines and around pole and stay complete to make clear span of 2 Mtr of tree both sideof the OH line with JCB, Cutter and all tools, plants etc compelete all asspecified and directed. Note :(i) Distance between pole to pole will be measured and paid. (ii)Contractor has to take upmost care to avoid damage to existing lines/structures if Any breakdown of line caused during punning shall be made good without any extra cost. (ii) Prunning of tree to be done twice a year (before & after rainy season)(iii) The contractor has to ensure the proper safety of the tradesmans to avoid any mishappening.If any mishappening occures the contractor will be solely responsible for it. |
| 48 | Supply , Installing testing and commissioning in replacement LT panel board factory made outdoor cubical type vermin /dust proof duly powder coated with suitable protection as per latest IS made out of 3 mm thick CRCA sheet & 2 mm thick inner sheet including provn of angle iron frame of size 50x50x5 mm at bottom with 90 cm long legs. The panel shall be open able from both side front & back with locking arrangement duly powder coated internally and externally. The internal wiring of electrical panel shall be done with suitable size copper wire complete all as specified and directed.The panel should be of suitable size to accommodate the following accessories as mentioned below :-(i)Aluminium bus bar 600 amps cap 3 phase 4 wire system – 01 set(II) MCCB 400 Amp 415 Volts 4 pole with theRunning Meteral magnetic setting rupturing cap 36 KA -01(Incoming)(III) MCCB 250 Amps 415 V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 01 Nos (For Out Going)(IV) MCCB 200 Amps 415V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 03 Nos (For Out Going)(V) MCCB 100Amps 415V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 01 Nos (For Out Going)(VI) MCB SPN 32 Amps -01 Nos(Vi) Volt Meter (digital Type (0 -500 Volts)-01 No(Vii) Ammeter (digital type) with CTs 0-300Amps)-01 No(VIII) Phase indication lamps LED type (RYB) with holder-01 Set(Set of Three) |
| 49 | Supply , Installing testing and commissioning in replacement LT panel board factory made outdoor cubical type vermin /dust proof duly powder coated with suitable protection as per latest IS made out of 3 mm thick CRCA sheet & 2 mm thick inner sheet including provn of angle iron frame of size 50x50x5 mm at bottom with 90 cm long legs. The panel shall be open able from both side front & back with locking arrangement duly powder coated internally and externally. The internal wiring of electrical panel shall be done with suitable size copper wire complete all as specified and directed by Engr-in-charge.The panel should be of suitable size to accommodate the following accessories as mentioned below :-(i)Aluminium bus bar 400 amps cap 3 phase 4 wire system – 01 set(II) MCCB 250 Amp 415 Volts 4 pole with theRunning Meteral magnetic setting rupturing cap 36 KA -01(Incoming)(iii) MCCB 100Amps 415V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 05 Nos (For Out Going)(iv) MCB SPN 32 Amps -01 Nos(V) Volt Meter (digital Type (0 -500 Volts)-01 No(Vi) Ammeter (digital type) with CTs 0-300Amps)-01 No(VIi) Phase indication lamps LED type (RYB) with holder-01 Set(Set of Three) |
| 50 | Supply , Installing testing and commissioning in replacement LT panel board factory made outdoor cubical type veRunning Meterin /dust proof duly powder coated with suitable protection as per latest IS made out of 3 mm thick CRCA sheet & 2 mm thick inner sheet including provn of angle iron frame of size 50x50x5 mm at bottom with 90 cm long legs. The panel shall be open able from both side front & back with locking arrangement duly powder coated internally and externally. The internal wiring of electrical panel shall be done with suitable size copper wire complete all as specified and directed by Engr-in-charge.The panel should be of suitable size to accommodate the following accessories as mentioned below :- |
| 51 | (i)Aluminium bus bar 300 amps cap 3 phase 4 wire system – 01 set(II) MCCB 200 Amp 415 Volts 4 pole with theRunning Meteral magnetic setting rupturing cap 36 KA -01(Incoming)(iii) MCCB 100Amps 415V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 05 Nos (For Out Going)(iv) MCB SPN 32 Amps -01 Nos(V) Volt Meter (digital Type (0 -500 Volts)-01 No(Vi) Ammeter (digital type) with CTs 0-300Amps)-01 No(VIi) Phase indication lamps LED type (RYB) with holder-01 Set(Set of Three) |
| 52 | Supply , Installing testing and commissioning in replacement LT panel board factory made outdoor cubical type veRunning Meterin /dust proof duly powder coated with suitable protection as per latest IS made out of 3 mm thick CRCA sheet & 2 mm thick inner sheet including provn of angle iron frame of size 50x50x5 mm at bottom with 90 cm long legs. The panel shall be open able from both side front & back with locking arrangement duly powder coated internally and externally. The internal wiring of electrical panel shall be done with suitable size copper wire complete all as specified and directed by Engr-in-charge.The panel should be of suitable size to accommodate the following accessories as mentioned below :- |
| 53 | (i)Aluminium bus bar 300 amps cap 3 phase 4 wire system – 01 set(II) MCCB 200 Amp 415 Volts 4 pole with theRunning Meteral magnetic setting rupturing cap 36 KA -01(Incoming)(iii) MCCB 100Amps 415V 04 polewith theRunning Meteral magnetic settingbreaking cap 25KA- 05 Nos (For Out Going)(iv) MCB SPN 32 Amps -01 Nos(V) Volt Meter (digital Type (0 -500 Volts)-01 No(Vi) Ammeter (digital type) with CTs 0-300Amps)-01 No(VIi) Phase indication lamps LED type (RYB) with holder-01 Set(Set of Three)(viii) Change over off load swtich 200 Amps - 01 |
| 54 | Notes for items Nos 48 to 51(a) The PanelShould be CPRI approved. Drawing shall be got approved by Accepting Officer.(b) Necessary opening for incoming & outgoing cable shall be provided with cable glands.(c) Necessary lifting hooks shall be provided.(d) Danger notice plate/handle etc shall be provided .(e) The rate quoted by contractor shall be deemed to be included for necessary excavation & earth work, PCCfoundation work as per manufacturers instrutions and as directed shall be deemed to be included in the quoted rates. No extra cost shall be addmissble to thecontractor on this account. |
| 55 | Material and Labour forin replacemennt earthing complete with galvanized steel earth plate electrod of size 60cmx60cmx6mm thick burried directly in ground vertically(earth pit not less than 2.25 metre deep below normal ground level) with top edge of the plate not less than 1.5 metre below normal ground level connected to galvanized iron or steel earth wire 4 mm dia by means of bolts nuts check nuts and GI washers of Galvanised iron protected by steel pipe 15mm (light grade) all as shown in elecrrical plate No.3 of SSR Part-I and connecting to earthing test point (earth test point to be provided at 5 metre distance from earth pit) and testing on completion including necessary excavation and earth work. The rate also include charcoal dust and salt in alternate layers, 25 mm dia light grade GI pipe, funnel, wire mesh, Concrete 1:3:6 type C-1 for pit and RCC pit cover. The extra cost of the watering pipe, bends, elbows shall be included in the unit rate. Note : RCC pit cover shall be precast of RCC 1:2:4 type B-1 80mm thick reinforced with XPM weighing notless than 4 Kg/Sqm,complete all as specified and directed. |