| 1 | S&F in repair PLC for drying tumbler as per existing complete all as specified and directed. |
| 2 | S&F in repair PLC for washing machine as per existing complete all as specified and directed. |
| 3 | S&F in repair PLC for Hydro extractor as per existing complete all as specified and directed. |
| 4 | Supply, fixing, testing & commissioning in replacement of bronze globesteam Stop valve flanged of following sizes (IBR certified) :- |
| 5 | 50 mm bore |
| 6 | 40mm bore |
| 7 | 25 mmbore |
| 8 | S&F in replacement Gun metal Gate globe or gate valves with iron wheel head screwed both ends for union pipe of following sizes:- |
| 9 | 50mm bore |
| 10 | 40mm bore |
| 11 | 25 mm bore |
| 12 | 15 mm bore |
| 13 | S&F in replacement following type belts:- |
| 14 | V Belt B-59 |
| 15 | V Belts B-73 |
| 16 | V Belt B-87 |
| 17 | V Belt B-92 |
| 18 | V Belts B-97 |
| 19 | S&F in replacement following type bearing :- |
| 20 | 22215 EK |
| 21 | 22212 EK |
| 22 | 22211 EK |
| 23 | S&F in replacement steam solonoid valve 15mm cap 220 volt single phase of steam brass body ISI mark working at Max 185oC and working at min operating pressure at 0.5 Kg/cm2 - max operating pressure at 15 Kg/cm2 as per OEM design complete all as specified and as directed. |
| 24 | All as per item No 8above but of size 20 mm |
| 25 | S&F in replacement water solonoid valve 25 mm cap 230 volt single phase of steam vessel ISI mark as per OEM design complete all as specified and as directed. |
| 26 | All as per item No 10 above but of size 40 mm complete all as specified and directed. |
| 27 | S&F flush push type emergency switch suitable for industiral Laundry machines as per OEM design complete all as specified and as directed. |
| 28 | S&F in replacement door gasket suitbale for 60 Kg washing machineas per OEM design complete all as specified and as directed. |
| 29 | S&F in replacement door gasket suitbale for 30 Kg washing machineas per OEM design complete all as specified and as directed. |
| 30 | S&F in replacement steam flexible steel threaded pipe of 15 mm dia and 1.0 Mtr long complete all as specified and directed. |
| 31 | S&F in replacement contactor of following capacity/ sizes:- |
| 32 | MNX 12 |
| 33 | MNX 18 |
| 34 | MNX 25 |
| 35 | MNX 32 |
| 36 | Supply and filling gear oil EP 90 for gear box complete all as specified and as directed. |
| 37 | Supply and filling gear oil 20W 40 for boiler pumps complete all as specified and as directed. |
| 38 | Supply and fixing graphite gland packing of 10 mm size for repairing leakages complete all as specified and directed. |
| 39 | S & F teflon pad of iron machine of 1200mmx750mm size as per OEM design complete all as specified and as directed. |
| 40 | S&F in replacement heating element of iron machine single phase 900 watt 230 volt ISI mark as per OEM design complete all as specified and as directed. |
| 41 | S&F in replacement heating element \"U\" shape for iron tablesingle phase 3.0 KW 230 volt ISI mark as per OEM design complete all as specified and as directed. |
| 42 | S&F in replacement heating element of steam vessel three phase 9 KW cap ISI mark as per OEM design complete all as specified and as directed. Note :- (i)Thread of element should match with vessels thread.(ii)Contractor will be ensured that no leakage from threaded joint of elements. |
| 43 | S&F Aluminium shoes of iron machine ISI mark as per OEM design complete all as specified and as directed. |
| 44 | S&F steam rubber pipe 6 mm of (0-10kg) pressure 3 mtr long nylon embeded of iron machine ISI mark as per OEM design complete all as specified and as directed. |
| 45 | S&F pressure gauge of steam tank of 10kg pressure rating ISI mark as per OEM design complete all as specified and as directed. |
| 46 | S&F single phase micro switch of paddle ISI mark for steam iron press as per OEM design complete all as specified and as directed. |
| 47 | S&F single phase rocker switch 15 Amp cap ISI mark as per OEM design complete all as specified and as directed. |
| 48 | S&F cotton covered copper wire of size 1 sqmm and four core complete all as specified and as directed. |
| 49 | S&F in replacement Wall mounting industrial plug 63 amp cap 5 pin, 415 volts, AC splash proof IP -67 protected complete all as specified and directed. |
| 50 | S&F in replacement of MCCB 4 pole 63 Amp, breaking cap 16 KA suitable for isolation, adjustable overload complete all as specified and directed. |
| 51 | S&F in replacement of MCCB 4 pole 200 Amp, breaking cap 35 KA suitable for isolation, adjustable overload complete all as specified and directed. |
| 52 | S&F in replacement, PVC insulated, un-armoured, heavy duty electric power cable 6 Sqmm4 core copperconductor, 1100 volts grade complete all as specified and directed. |
| 53 | Taking down boiler 600Kg complete with the help of chain pulley and removing of blockage of steam generator main coil any type and refixing the same its original position after cleaning complete all as specified and directed.Note :- The rates of T&P required for taking down of hydro extractor are deemed to be included in the quoted rates for this item. |
| 54 | QuarterlyMaintenance for two boilers of cap 600 Kg/Hr (i) This service will be performed at the start of the maintenance service term.All manufacturer\"s recommended yearly maintenance procedures on the unit(s) will be conducted.The inspection will be conducted on a mutually agreed date (1 visit) (ii) Preventative Maintenance - This service provides for regularly scheduled preventative maintenance inspections including descaling if reqd. There will be four Preventative Maintenance visits per year, at approximately equal intervals or as recommended by Engr-in Charge.(iii) Written Reports - A report will be provided at the end of each inspection with recommendations of necessary repairs and maintenance procedures.(iv) Emergency Service - Includes two breakup/emergency calls between inspections as required for the purpose of diagnosis of trouble, adjustment, minor repair, or resetting of controls. (v) Preventative Maintenance - Regularly scheduled preventative maintenance inspection will include the following:• Check the general operation of the unit.• Log the operating temperatures, pressures, voltages and amperages.• Check the operation of the control circuit.• Check the operation of the motor and starter. |
| 55 | (vi) Analyse the recorded data.Compare the data to the original design conditions.• Review operating procedures with operating personnel.• Provide a written report of completed work, operation log and indicate any uncorrected deficiencies detected.(vii) Written Reports - To be provided at the end of inspection with recommendations of necessary repairs and maintenance procedures.Notes:-(a) The tenderers shall have to submit the copy of MOU with M/s Thermax company through its authorizedservice provider as a proof to carry outannual/quarterly/ prevantive maintenance etc recommended by Engr In Charge after commencement of work and strictly follow the company maintenance recommendations.The rates quoted shall be deemed to include all such maintenance cost. (b)The contractor shall submit the record of periodical /preventive /annual maint service carried out M/s Thermax company along with recommendation of necessary repairs and maintenance proceure alongwith documentary evidence for claiming payment. The contractor shall produce the \"purchase order\" issued to M/s Thermax company/auth service provider for Annual Maintenance.(c) Contractors quoted rates shall be deemed to beinclusive of any miscellaneous minor spares such as wires, toggle switch, lugs, nuts, cable gland, connector, thimbles, gland packing etc when required or as ordered by Engr in Charge for smooth and uninterrupted operation of the complete system except spares such as mentioned here in after in relevant items of this schedule.(d) The item rates included scaling, cleaning/washing, overhauling ofevery two month complete all as directed by Engr in Chargefailing which a penalty @ Rs 2000/- per two months will be charged.(e)In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost. |
| 56 | QuarterlyMaintenance for diesel fired hot water geyser of cap 300000 K Cal per hrs. - (i) This service will be performed at the start of the maintenance service term.All manufacturers’ recommended yearly maintenance procedures on the unit(s) will be conducted.The inspection will be conducted on a mutually agreeable date (1 visit) (ii) Preventative Maintenance - This service provides for regularly scheduled preventative maintenance inspections including descaling if reqd. There will be four Preventative Maintenance visits per year, at approximately equal intervals or as recommended by Engr In Charge.(iii) Written Reports - A report will be provided at the end of each inspection with recommendations of necessary repairs and maintenance procedures.(iv) Emergency Service - Includes two breakup/emergency calls between inspections as required for the purpose of diagnosis of trouble, adjustment, minor repair, or resetting of controls. |
| 57 | (v) Preventative Maintenance - Regularly scheduled preventative maintenance inspection will include the following:• Check the general operation of the unit.• Log the operating temperatures, pressures, voltages, and amperages.• Check the operation of the control circuit.• Check the operation of the motor and starter.• Analyse the recorded data.Compare the data to the original design conditions.• Review operating procedures with operating personnel.• Provide a written report of completed work, operation log and indicate any uncorrected deficiencies detected. |
| 58 | Notes:- (a) The tenderers shall have to submit the copy of MOU with OEM M/s Alfa Therm Limited through its authorizedservice provider as a proof to carry outannual/ quarterly/prevantive maintenance etc recommended by OEM immediatly after commencement of work and strictly follow the company maintenance recommendations.The rates quoted shall be deemed to include all such maintenance cost.(b)The contractor shall submit the record of periodical /preventive /annual maint service carried outM/s Alfa Therm Limited along with recommendation of necessary repairs and maintenance proceure alongwith documentary evidence for claiming payment. The contractor shall produce the \"purchase order\" issued to M/s Thermax company/auth service provider for Annual Maintenance.(c) Contractors quoted rates shall be deemed to beinclusive of any miscellaneous minor spares such as wires, toggle switch, lugs, nuts, cable gland, connector, thimbles, gland packing etc when required or as ordered by Engr in Charge for smooth and uninterrupted operation of the complete system except spares such as mentioned here in after in relevant items of this schedule.(d)In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost. (e) The item rates include de scaling, cleaning/washing, overhauling ofevery two month complete all as directed by Engr in Chargefailing which a penalty @ Rs 2000/- per two months will be charged. (e) In case of any major break down the additional manpower if required will be arranged by the contractor to re-start the plant without any additional cost. |
| 59 | Supply & Filling bacteria culture in PVC shells suitable for MBBR type plant complete all as specified and directed. |
| 60 | Supply & Filling molasses (Sheera)for day to day use in Sewage treatment plant complete all as specified and directed. |
| 61 | Supply only poly aluminium chloride chemical for day to day use in Sewage treatment plant complete all as specified and directed. |
| 62 | Supply only DAP for day to day use in Sewage treatment plant complete all as specified and directed. |
| 63 | Supply only granular based Calcium hypo chloride water disinfectantpacked in 45 kgs plastic drums (having 90% free chlorine) for day to day use in sewage treatment plantcomplete all as specified and directed . |
| 64 | M&L for testing of treated sewage water from out letof chlorine contact tank once in every months from NABL accredited authorized lab as per IS 3025 forrecording essential parameters such as BOD, COD, PH, suspended solids and total dissolved solids complete all as specified & directed. |
| 65 | M&L for periodical maintenance of drying beds by dislodging of filter media scrapping out the media mixed with sludge to a depth 25 mm to 32 mm removing all floating material, cleaning well from inside, taking out sludge and algaeand disposal off to a distance not less than 50 mtrs including digging out filter media upto 150 mm depth for improving the porosity, leveling the media uniformly in filter bed complete all as specified and directed. |
| 66 | M&L for taking down electric motor from base frame and shifting to work shop for rewinding, dismantling and taking out rotor assembly from stator carefully and cutting/cleaning burnt wire from stator, repair to damage slots including rewinding with super enameled copper wire of suitable size, varnishing, drying and tapping with cotton tapes, reassembling, reinstalling at site including testing at full load for 15 HP motor complete all as specified and directed. |
| 67 | All as per item No 44.00 above but 7.5 HP motor complete all as specified and directed. |
| 68 | Allas per item No44.00 above but 5 HP motor complete all as specified and directed. |
| 69 | All as per item No44.00 above but 3 HP motor complete all as specified and directed. |
| 70 | Allas per item No 44.00 above but 2 HP motor complete all as specified and directed. |
| 71 | Allas per item No44.00 above but for 1 HP motor complete all as specified and directed. |
| 72 | Supply & Filling of compressor oil 320 grade complete all as specified and directed . |
| 73 | Repair and maintenance to chlorine Dozing plant incl transporting to workshop of manufacture or authorizeddealer, dismantling the dozing plant, cleaning, disconnecting electric connection liquid of all Job parts taking out all defective parts and supply and fix new parts for replacement reassembling, testing and re-fixing complete all as directed during execution of work by Engr-in-Charge. |
| 74 | S&F in replacement of UPVC pipe of internal dia 110mm and outer dia 113mm with sage delivery pressure of 10 Kg/CM2complete with all fittings incl elbow, T jucntion etc and fixing accessories like sockets, nut, bolts along with PVC solvent cement etc complete all as specified and directed. |
| 75 | S&F in replacement of PVC ball valve suitable for UPVC pipe of internal dia 110mm and outer dia 113mm suitable for sage delivery pressure of 10 Kg/CM2 along with PVC solvent cement etc completeall as specified and directed. |
| 76 | S&F in replacement of flagne suitable for PVC ball valve/metal body butter flyof internal dia 110mm and outer dia 113mm with sage delivery pressure of 10 Kg/CM2 along with PVC solvent cement etc completeall as specified and directed. |
| 77 | Repairing, Overhauling and replacement of dual Filter Media and activated carbon filtration vessels of MBBR STP 0.4MLD including Performing the following:- |
| 78 | Unloading of exhausted filter media from the Filter vessels with proper care etc. complete all as specified and directed. |
| 79 | Thorough cleaning and scraping inside the existing Filter vessel properly including painting with two coats of anticorrosive black bituminous paint etc.complete all as specified and directed. |
| 80 | Checking of the existing Bed support plate and replacement of entire strainer of Filter Plant as per existing specification complete all as specified and directed. |
| 81 | Thorough cleaning, scrapping out side of vessel properly including painting withtwo coats of best quality synthetic enamel paint over one coat zinc chrome primer complete all as specified and directed. |
| 82 | Taking out the exhaust activated Carbone and fill up the same with live catalyst AgNO3 of IV value not less than 750 with supporting under bed media (duly coasted with manganese di- oxide) as required and removal of the existing exhausted media complete all as specified and directed. |
| 83 | Supply and loading of new live filter media in to the dual filter media vessel incl removal of existing media from the vessels and dump out side the installation as and where directed by Engr in charge as per following norms:-ItemSize Fine Silex1/4\" x 1/10\" Course silex 1/2\" x 1/4\"Pebbles3/4\" x 1/2\" Pebbles1-1/2\" - 1\" Mix Sand 6 -14 & 16-30 100 BS mesh sand |
| 84 | M&L for spray painting with two coat of synthetic enameled paint over one coat of primer of different sizes connecting pipes, valves, panels etc and its related items including writing letters as per colour code including preparation of surface and removing existing paint all as specified and directed. |
| 85 | M&L for repairing, servicing and setting of programme of PLC installed at MH Panel Room for functioning of main Supply and DG Supply complete all as directed by Engr-in-Charge. |