| 1 | Providing services for attending all types of day to day complaints of maintenance, repair, replacement of unserviceable worn out spare parts,charging fresh refrigerant, dismantling, reassembling in respect of all make, work & type of cooling appliances i.e., air conditioners (window type, split type, cassette type and duct able type) , water coolers , desert coolers, refrigerators and voltage stabilizers installed at various labs/locations in Chandigarh and TBRL Range Ramgarhby providing skilled qualified Refrigerator Mechanicwith helper per day alongwith required tools/equipment/machine/test kits/gas filling gauge, gas charging adopter, gas charging valve, drill machine with drill bit, allen key set, ladders, ropes ,clamp metre, brazing rod, butane gas cylinder, tape roll, vacuum pump, suction discharge valve, fasteners, spanner set, copper tube cutter, flaring tool, &other instruments which are required for maintenance, repair and to make the equipment functional and for keeping all equipment in perfectly clean, tidy and functional condition in all times . The complaints record to be maintained on the complaint register & complaint slips complete all as specified and directed.Note: (i) Cost of spares including refrigerant for charging and rewinding /replacement of condenser fan motors, compressor, blower fan etc if required shall be measured and paid separately under respective item of sch\"A\" (ii) 01x refmechanic and 1 x helper to be provided from 0900 hrs to 1700hrs.(iii) Non attending of complaints will be recovered @ Rs 250 per complaint per day.(iv) The vehicles alongwith fuel for attending complaint site(motorcycle etc) provide by contractor.(v) Simple phone (Keypad type without Camera) is to be provided for attending complaints/communication. (vi) One complaint will be considered as one Job after rectification.(vii) Cost of Complaint register, complaint slip shall be incl in quoted rates andwill be provided by contractor without any extra cost. |
| 2 | Material and labour for wet servicing of split AC by highly skilled technician incl both Indoor and outdoor units using water and specialized cleaning agents to thoroughly clean the cooling coils, condenser coils, outside panels, drain and fillet pipes by using pressure jet, jet pump,jackets cover to prevent spills, cleaning foam, blowers, brush cleaning cloths etc complete servicing with additional checks as: (i) Check for Gas Pressure (ii) Check for Power Consumption (iii) Check for level of indoor unit for proper water flow (iv) Check Thermostat (v) Check all electrical connections and tighten them complete all as specified and directed. |
| 3 | Material and labour for wet servicing of window AC by highly skilled technicianusing water and specialized cleaning agents to thoroughly clean the cooling coils, condenser coils, outside panels, drain and fillet pipes by using pressure jet ,jet pump,jackets cover to prevent spills, cleaning foam, blowers, brush, cleaning cloths etc complete servicing with additional checks as:(i) Check for Gas Pressure (ii) Check for Power Consumption (iii) Check for level of indoor unit for proper water flow (iv) Check Thermostat (v) Check all electrical connections and tighten them complete all as specified and directed. |
| 4 | Material and labour for dismantling and taking down split AC after restoring gas and disconnection of all electrical and copper tubes incl dismantling stands for outdoor unit and deposited to MES store yardcomplete all as specified and directed. Note: Rate of arrangement (ladder/Scaffolding) for reaching at a height for dismantling and taking down outdoor unit from multi-story buildings are deemed to be incl in quoted rates. |
| 5 | Material and labour for installation and mounting of split AC incl all electric and copper tube connections, drilling on brick wall (up to 12\") for copper tube & drain pipe and interconnecting them with electrical wires and communication cables with proper testing after installation complete all as specified and directed. Note : Rate of arrangement (ladder/Scaffolding) for reaching at a height for installation outdoor unit to multi-story buildings are deemed to be incl in quoted rates. |
| 6 | Material and labour for dismantling and taking down Window AC after restoring gas and disconnection of all electrical and copper tubes and deposited to MES store yard complete all as specified and directed. Note : Rate of arrangement (ladder/ Scaffolding) for reaching at a height for dismantling and taking down AC unit from multi-story buildings are deemed to be incl in quoted rates. |
| 7 | Material and labour for installation of window AC incl all electric and copper tube connections with proper testing after installation complete all as specified and directed. Note : Rate of arrangement (ladder/Scaffolding) for reaching at a height for installation AC unit to multi-story buildings are deemed to be incl in quoted rates. |
| 8 | Material and labour for nitrogen flushing / nitrogen pressure testing of already installed copper piping for spilt / window AC of capacity 1/1.5/2 TON and repair the leakage if found any complete all as specified and directed. |
| 9 | Supply and fixing for stand for outdoor unit of split AC incl heavy duty wall stand (set of 2) suitable for 1/1.5/2 ton AC, nut, bolts, fasteners etc complete all as specified and directed. |
| 10 | Supply and fixing for 3 core 1.0 sqmm copper flexible wire for connection/interconnection of water cooler and desert cooler complete all as specified and directed. |
| 11 | Supply and fixing for 3 core 1.5 sqmm copper flexible wire for connection/interconnection of Geyser complete all as specified and directed. |
| 12 | Supply and fixing for 3 core 2.5 sqmm copper flexible wire for connection/interconnection of IDU and ODU complete all as specified and directed. |
| 13 | Supply only PVC drain pipe of suitable diameter as per existing 1/1.5/2 Ton AC complete all as specified and directed. |
| 14 | Supply only PVC water pipe 15 mm bore heavy duty as per existing desert cooler complete all as specified and directed. |
| 15 | Supply and fixing of Two run of copper tubing of suitable dia for 1.5/2.0 TR split AC incl standard insulation,1 run of 4 core 2.5 sqmm flexible copper cable for interconnection between outdoor and indoor unit complete all as specified and directedNote : 2 Run of copper pipes incl insulation and 1 run of copper wire shall be measured as 01 RM. |
| 16 | Supply and fixing 50+6 MFD capacitor, burst proof, ISI marked, 440 VAC, round Aluminium suitable for split/ window AC of capacity 1.0/1.5/2 TON complete all as specified and directed. |
| 17 | Supply only capacitor 10 MFD suitable for air conditioner/ water cooler complete all as specified and directed. |
| 18 | Supply only capacitor 4 mfd for desert/water cooler as required at site complete all as specified and directed. |
| 19 | Supply only in replacement of capacitor 40/45 mfd for AC as required at site complete all as specified and directed. |
| 20 | Supply only in replacement of starting capacitor 80-100/100-120 mfd for split type A/C\"s of capacity 1.5TR/2 TR complete all as specified and directed. |
| 21 | Supply only in replacement of running capacitor 30/36 mfd for split type AC unit as required at site complete all as specified and directed. |
| 22 | Supply and charging gas R-22/R-32/R-134A/R-410A refrigerant as per existing suitable for filling in existing AC units of all capacity complete all as specified and directed. |
| 23 | Supply and fixing for automatic voltage stabilizer of capacity 3 KVA incl dismantling and taking down old unserviceable complete all as specified and directed |
| 24 | Supply and fixing for automatic voltage stabilizer of capacity 5 KVA incl dismantling and taking down old unserviceable complete all as specified and directed |
| 25 | Supply and fixing in replacement new condenser fan motor (DC /AC )(outdoor) for split type A/C unit of capacity 1.5/2.0 TR as per existing model complete all as specified and directed |
| 26 | Supply only in replacement of new condenser motor single phase of 1/16 HP as required at site for water cooler with clamps, bolts, nuts & rubber bushes complete including connecting testing complete all as specified and directed |
| 27 | Disconnecting and rewinding of condenser motor single phase of 1/16 HP for water coolers & refixing the same with clamps bolts, nuts and rubber bushes including connecting, testing complete all as specified and directed. |
| 28 | Disconnecting & taking down of window type AC of any make and refixing the same after replacement of condenser coil including soldering/welding and commissioning complete all as specified and directed |
| 29 | Disconnecting & taking down of window type AC 1.5 TR of any make and refixing the same after replacement of cooling coil including soldering/welding dehydration complete all as specified and directed |
| 30 | Supply and fixing in replacement of polypropylene filter mesh Air filter for split type A/C units of capacity 1.5 TR/2 TR as per sample complete all as specified and directed. |
| 31 | Supply only in replacement of Air filter of w/AC 1.5 TR capacity Make-Coir foam or equivalent as required at site complete all as specified and directed. |
| 32 | Supply and installation in replacement indoor unit complete 1.5/2.0 TR 5-star BEE rating, inverter type compatible with existing outdoor unit of make as per existing of split AC of cap 1.5 TR complete all as specified and directed. Note: Oldunsv items shall be the property of MES and shall be deposited in MES store yard. |
| 33 | Supply and fixing in replacement of starting relay for split type AC units of capacity 1.5/2 TR as required at site complete all as specified and directed. |
| 34 | Supply and fixing in replacement starting relay as required at site for water coolers complete including connecting, testing complete all as specified and directed. |
| 35 | Supply only in replacement starting relay for window A/C as required at site complete all as specified and directed. |
| 36 | Taking out old unserviceable power/auxiliary contactor from control panel / starter and supply and fix new power contactor of of AC3 rating 9-12 Amps MNX/MO type complete all as specified and directed |
| 37 | All as per serial item no 36.00 above but power contactors AC3 rating 25 Amps ML/MNX/MO (as per existing) type-ditto-. |
| 38 | All as per serial item no 36.00 above but power contactors AC3 rating 32-40 Amps ML/MNX/MO (as per existing) type -ditto-. |
| 39 | Supply and fixing in replacement of indoor unit blower motor suitable for existing split AC Capacity 1.5 / 2.0 TR complete all as specified and directed. |
| 40 | Supply and fixing in replacement of blower motor suitable for existing window AC capacity 1.5 / 2.0 TR complete all as specified and directed. |
| 41 | Supply and fixing for compressor of capacity 2.0 TR from split type AC unitas per existing models including flushing, dehydration incl dismantling and taking down old unserviceable complete all as specified and directed. |
| 42 | Supply and fixing compressor of capacity 1.5 TR from split type AC unit as per existing models including flushing, dehydration incl dismantling and taking down old unserviceable complete all as specified and directed. |
| 43 | Disconnecting and taking down compressor 1.5 TR window AC as per existing make and refixing the same after replacing with new one including flushing, dehydration and gas changing complete all as specified and directed. |
| 44 | Disconnecting and taking down compressor 02 TR window AC as per existing make and refixing the same after replacing with new one including flushing, dehydration and gas changing complete all as specified and directed. |
| 45 | Supply and installation in replacement outdoor unit complete 1.5 TR 5-star BEE rating, inverter type compatible with existing indoor unit of make as per existing of split AC of cap 1.5/2 TR complete all as specified and directed Note: Oldunsv items shall be the property of MES and shall be deposited in MES store yard. |
| 46 | Supply and installation in replacement outdoor unit complete 02 TR 5 star BEE rating, inverter type compatible with existing indoor unit of make as per existing of split AC of cap 1.5/2 TR complete all as specified and directed. Note: Oldunsv items shall be the property of MES and shall be deposited in MES store yard. |
| 47 | Supply and fixing in replacement the new remote control unit (cordless) with batteries as per existing model for 1TR/1.5 TR/ 2 TR split type A/C unit complete all as specified and directed. |
| 48 | Supply and fixing in replacement condenser fan blade for split AC 1.5/2.0 TR complete all as specified and directed |
| 49 | Supply and fixing in replacement printed circuit board (PCB) of cooling unit of split/ AC 1.5/2.0 TR suitable for existing invertor type ACs of Make Lloyd, Voltas, Godrej etc. as per sample suitable complete all as specified and directed. |
| 50 | Supply and fixing in replacement printed circuit board (PCB) suitable for existing 1.5/2.0 TR window type AC as per sample complete all as specified and directed. |
| 51 | Material and labour for repair of printed circuit board (PCB) after dismantling, taking down and refixing after repairing of Split/Window AC or AC plant any type any capacity incl dismantling and taking down and refixing the same after repairing complete all as specified and directed. |
| 52 | Supply, installation and testing of printed control board (PCB) of indoor unit and outdoor unit both of cassette type AC (inverter type) Cap 2.5 TR as per sample complete all as specified and directed |
| 53 | Supply, installation and testing of printed control board (PCB) of indoor unit and outdoor unit both of cassette type AC (inverter type) Cap 4.0 TR as per sample complete all as specified and directed. |
| 54 | Supply and fixing in replacement of thermostat for window/ split type AC 1TR/1.5/2.0 TR as required at site complete all as specified and directed. |
| 55 | Supply and fixing in replacement of overload protector for compressor as reqd at site for AC/ water cooler complete all as specified and directed |
| 56 | Supply only in replacement of over load protector for 1.5/2.0 TR Window AC complete all as specified and directed. |
| 57 | Supply only brass float valves accessories of 15 mm size as required at site complete all as specified and directed. |
| 58 | Supply and fixing for compressor (\"R’ type) suitable for 40/80 ltr water cooler as per existing including flushing dehydration incl dismantling and taking down old unser complete all as specified and directed |
| 59 | Supply and fixing for new desert cooler water pump including connection for proper functioning complete all as specified and directed. |
| 60 | Supply and fixing for cooler wood wool pad set of three for desert cooler complete all as specified and directed. |
| 61 | Supply and fixing for desert cooler fan motor single phase, 50 Hz, 240 Volt, 180 W, 1400 RPM complete all as specified and directed. |
| 62 | Supply and fixing for new GI body of desert cooler of cap 60/70 ltr with front grill, switches etc duly painted complete as per existing complete all as specified and directed |
| 63 | Supply and fixing for new PVC body of desert cooler of cap 80/ 100 ltr with front grill, switches etc complete as per existing complete all as specified and directed |
| 64 | Supply and fixing for PVC three way water distributor of desert cooler heavy duty as per existing sample complete all as specified and directed. |
| 65 | Servicing and repair with replacement of minor parts if reqd of voltage stabilizer of capacity 3-5 KVA complete as per existing complete all as specified and directed. |
| 66 | Supply and fixing in replacement PVC connections for hot and cool water 15 mm size with PTMT nuts of length 450 mm suitable for water coolers/geysers complete all as specified and directed. |
| 67 | Supply and fixing in replacement PVC connections for hot and cool water 15 mm size with PTMT nuts of length 600 mm suitable for water coolers/geysers complete all as specified and directed. |
| 68 | Supply only brazing rod for copper tube welding complete all as specified and directed . |
| 69 | Supply only butane gas cylinder 230 gram for brazing rod welding complete all as specified and directed. |
| 70 | Supply only for suction valve with dead end cap at outdoor unit of split type Air conditioner 1.5/2.0 TR complete all as specified and directed. |
| 71 | Supply only for discharge valve with dead end cap at outdoor unit of split type air conditioner 1.5/2.0 TR complete all as specified and directed. |
| 72 | Supply and filling of compressor oil for existing cooling appliance complete all as specified and directed. |
| 73 | Supply and fixing for DBOX MCB protected socket, single phase, with MCB 20 Amps \"C\" curve with plastic enclosure 4 module suitable for AC and other electrical connection incl dismantling and taking down old unser switch sockets box or AC socket box or MCB enclosure 2 modules (PVC/Metal) as per actual complete all as specified and directed. |
| 74 | Supply only enamel spray paint (matt white/smoke grey) in an aerosol spray paint bottle packing of 400 ml eachsuitable for metal surface complete all as specified and directed. Make: Asian Paints/Dulux/Cellux. Note: Spray paint shall be taken in charge by MES through RV. |
| 75 | Supply only dust, oil and grease hard stain remover for exhaust fan/ceiling fan and any other item non- flammable, nontoxic liquid spray in a 500 ml each spray bottle suitable for allsurface complete all as specified and directed. Note: Cleanershall be taken in charge by MES through RV. |
| 76 | Supply only rust remover spray suitable for cleaning and protection of electrical parts, act as anti moisture agent and lubricants in420 ml each spray bottle suitable for allsurface complete all as specified and directedMake: WD-40/3M/Castrol.Note:Rust remover shall be taken in charge by MES through RV. |
| 77 | Material and labour for painting / marking of MES/SM number on electrical equipment / AC outdoor unit /ACIndoor Unit / any other plant or equipmentwith black enamel paint complete all as specified and directed. Note : (i) MES/SM no shall be provided by department. (ii)One MES/SM number/Identification No/Location shall be considered as one unit separately. |
| 78 | Supply fixing in replacement of old unserviceable copper/stainless steel Apparatus plate cum element (complete assembled unit special type) 2/3 kw 230 volt 50 Hz as existing pattern with rubber gaskit including nuts, bolts & washers suitable for existing 25 ltr geyser complete all as specified and directed. |
| 79 | Supply fixing in replacement of unserviceable magnesium anode Rod (anty rusting rod) of water heater as per existing pattern to protect the corrosive particles from the geyser suitable for existing 25 ltr geyser complete all as specified and directed. |
| 80 | Supply fixing in replacement of unserviceable finned tubular heater made out of stainless steel and nickel-chromium with aluminium fins for central AC plant, fin pitch 5 mm to 10 mm, diameter of tube 8 mm to 16 mm, length range 300 mm to 1500 mm, power rating 0.5 kw to 6 kw, temperature range up to 350 degree C, complete all as specified and directed. |