| 1 | Road Work |
| 2 | Earth work in excavation and disposal of excavated earth including garbage and malwa up to 1.00 km.etc. |
| 3 | Construction of Embankment with approved material obtained from borrow pits with a all lead and lift upto 1.5 m, spreading ,grading to requirement of Tables 300-1 and 300.2 as per Technical Specification Clause 301.5 including Royalty. |
| 4 | Construction of granular sub-base by providing well graded material,spreading in uniform layers with motor grader on prepared surface,mixing by mix in place method with rotavator at OMC,and compacting with smooth wheel roller to achieve the desired density,complete as per technical specification clause 401. |
| 5 | Class -150 brick work in 1:4 cement and coarse sand mortar in foundation and superstructure as pre MORD. |
| 6 | plaster 1:3 Cement/Coarse Sand mortar including all material,Labour T&P etc. |
| 7 | Providing and laying Rubber mouled Reflective Zig-Zag 250x125mm and 80 mm thick precast compressed CC inter locking block, compressive strength shall not be less than 30MPA and weight not less than 4.50 kg each block including cost of 50mm thick bedding sand and joint filling with sand all material ,labour T&P etc required for proper completion of the work over the prepared base concrete as directed by Engineer-in-charge |
| 8 | 600,e0,e0,dux g~;we ikbi iqfy;k dk dk;Z Earth work in excavation and disposal of excavated earth including garbage and malwa up to 1.00 km.etc. |
| 9 | P.C.C. in 1:4:8 with 40mm gauge brick ballast (Coarse sand & cement) including supply of Labour Material etc.upto proper completion of works. |
| 10 | Class -150 brick work in 1:4 cement and coarse sand mortar in foundation and superstructure as pre MORD. |
| 11 | Laying C.C.Slab wih 20mm gauge stone grit coarse sand & cement in 1:1.5:3 including supply of all labour material & T &P etc.required for proper completion of works. |
| 12 | Mild Steel or Iron in plain work such as reinforced concrete or reinfoced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured upto floor two level. |
| 13 | struck pointing with cementmortar conisting of 1 part cement &2 parts of fine sand of 1.25 fineness modulus on brick work including supply of all materials labour & tools & plants etc.required for proper completion of the work. (S.I.No.574) |
| 14 | Construction of Embankment with approved material obtained from borrow pits with a all lead and lift upto 1.5 m, spreading ,grading to requirement of Tables 300-1 and 300.2 as per Technical Specification Clause 301.5 including Royalty. |
| 15 | Laying Brick on edge Solingfilled including preparation of base to proper slope and its ramming and including supply of all materials, labour and T & P etc.required for proper completion of the work. |
| 16 | S/F of inogration stone of approved stone and size i/c letter writing engraving letters i/c brick work plaster complete i/c cost of material labour t&p. |
| 17 | Provding of Photographs Please Enable Macros to View BoQ information |