| 1 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 2 | Dismentaling of B.O.E. soling/ interlocking tiles including stacking of sevicable material and disposal of unsevicable material within a lead of 50m as per deirection of EI/C (Labour only) |
| 3 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 4 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M20 grade PCC on M-10 grade foundation, foundation having 50mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408. |
| 5 | Barricating of damaged portion with bamboos/ballies with ropes and red cloth etc all complete. |
| 6 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 7 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 8 | Making connection of pipe to the existing manhole/sewer line etc all complete. |
| 9 | Supplying and filling in plinth with sand under under floors, including watering, ramming, cosolidating and dressing complete. |
| 10 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 200 mm nominal size |
| 11 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of slab, including rubbing and polishing complete with base of cement mortar 1:4 (1 cement: 4 coarse sand). |
| 12 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 13 | Providing and laying of 125micron plastic sheet etc all complete. |
| 14 | Disposal of surplus earth/malwa upto 3.00km distance including loading/unloading of material with all charge complete. |
| 15 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |