| 1 | Earth work in embankment by power transported earth with a lead beyond 200m and upto 1.00 km. i/c excavation , loading, unloading, manual compaction, dressing and all lifts complete excluding royalty.all specified and as directed by Engineer in charge. |
| 2 | Removal of Bund and diversion after complition of Work all specified and as directed by Engineer in charge. |
| 3 | Earth work in foundation in dry ordinary soil i/c lift upto 1.50m & lead upto 30m and including back filling with removal and disposal of surplus earth as directed by Engineer-in Charge upto a distance of 30M from the foundation trenches all specified and as directed by Engineer in charge. |
| 4 | Cement Concrete 1:3:6 (Cement, coarse sand and stone grit 20-40mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction all specified and as directed by Engineer in charge. |
| 5 | Reinforced Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete but excluding cost of steel and its binding with mechanical mixing and compaction all specified and as directed by Engineer in charge. |
| 6 | Cement Concrete 1:2:4 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing and compaction. all specified and as directed by Engineer in charge. |
| 7 | Cement Concrete 1:1.5:3 (Cement, coarse sand and stone grit 16-22.4 mm) in foundation i/c cost of all material labour T&P etc complete. with mechanical mixing all specified and as directed by Engineer in charge. |
| 8 | Providing and placing steel shuttering for C.C. Work including cost of centering and shuttering upto 3.0m hightall specified and as directed by Engineer in charge. |
| 9 | Providing and placing steel shuttering for R.C.C. Work including cost of centering and shuttering upto 3.0m hight. all specified and as directed by Engineer in charge. |
| 10 | Providing and laying Reinforcement for R.C.C. Work i/c cutting, binding and placing in position i/c cost of all material such as steel, binding wire etc., labour T&P etc. complete as per drawing all specified and as directed by Engineer in charge. |
| 11 | Supply and fixing joint filler board in joint between expansion Joints.all specified and as directed by Engineer in charge. |
| 12 | Supplying and fixing 75mm dia PVC Pipe (Kisan/Supreme) i/c cost of all material, labour, and T&P etc. complete. all specified and as directed by Engineer in charge. |
| 13 | Supply and fixing Sign Board and writing on it i/c cost of all material, labour T&P etc. complete. all specified and as directed by Engineer in charge. |
| 14 | Finishing wall two or more coat with Acrylic smooth exterior paint (Apex) of required shade i/c priming coat of exterior primer. all specified and as directed by Engineer in charge. Please Enable Macros to View BoQ information |