| 1 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 2 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 3 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 4 | Erecting one HT PSC pole for HT ABC works including digging & back filling pit in ordinary soil |
| 5 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 6 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 7 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 8 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 9 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 10 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 11 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 12 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 13 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 14 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles |
| 15 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
| 16 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 17 | Fitting one set (3No.) 11kV LA and giving connections excluding earthing. |
| 18 | Fiting One no MVT on existing cross arm excluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 19 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm |
| 20 | Erection of suspension clamp for 11KV ABC of any size Please Enable Macros to View BoQ information |