|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | All kinds of soil. |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 4 | Extra rates for quantities of works, executed: |
| 5 | In or under water and/or liquid mud, including pumping out water as required |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | 1:2:4 (1 Cement :2 Pulverised sand (zone-III) derived from natura sources : 4 graded stone aggregate 20 mm nominal sizederived from natura sources) |
| 8 | 1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 40 mm nominal sizederived from natura sources) |
| 9 | 1:4:8 (1 Cement : 4 Pulverised sand (zone-III) derived from natura sources : 8 graded stone aggregate 40 mm nominal sizederived from natura sources) |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 11 | 1:1.5:3 (1 cement : 1.5 Pulverised sand (zone-III) derived from natura sources: 3 graded stone aggregate 20 mm nominal size derived from natura sources). |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 13 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 15 | Foundations, footings, bases of columns, etc. for mass concrete |
| 16 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 17 | 12 mm Cement Plaster of mix: |
| 18 | 1:4 (1 Cement :4 River Sand) |