|
| 1 | Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. |
| 2 | X-arms holding clamps with bolts & nuts for ST/PCC Pole |
| 3 | M.S clamp for Top, T-off channel with bolts & nuts |
| 4 | Stone pad 300x300x75 mm |
| 5 | F-bracket with bolts & nuts for ST/PCC Pole |
| 6 | Danger board with clamp & bolts for ST/PCC Pole |
| 7 | Guarding Angle Clamp |
| 8 | E-bracket with bolts & nuts |
| 9 | LT Clamp |
| 10 | EYE HOOK |
| 11 | J HOOK |
| 12 | Suspension CLAMP |
| 13 | Dead end clamp |
| 14 | LT Shackle Insulator |
| 15 | NUT AND BOLT Shackle Insulator |
| 16 | EARTH WIRE CLAMP |
| 17 | 3 PHASE DRISTIBUTION BOX |
| 18 | 3 PHASE DRISTIBUTION BOX CLAMP |
| 19 | ALUMINIUM BINDING WIRE |
| 20 | T/F CLAMP |
| 21 | ALUMINIUM lug |
| 22 | P G Clamp |
| 23 | G I PIPE 6\" DIA |
| 24 | G I PIPE JOINTER 6\" DIA |
| 25 | EXTENTION BRACKET OF 11 KV XLPE CABLE |
| 26 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. |
| 27 | STP Poles,11 meter long |
| 28 | PCC Poles,8.5 meter long |
| 29 | Line materials with ACSR Weasel Conductor etc |
| 30 | 11 KV XLPE Cable size 3x70/120/185mm2 |
| 31 | CABLE JOINTING KIT |
| 32 | LT ABC 3x50+1X35+1X16 mmsq |
| 33 | Erection |
| 34 | Erection of single support ST/PCC Pole for construction of 11 KV Line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 35 | Erection of Sectional Double Pole Structure of PCC Pole including digging of pit. Fitting of accessories back fitting of earth, earthing, grouting of each pole & all stay sets (coment sand & brick ballst will be supplied by the contractor on this own his own cost) & other required works. |
| 36 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms(cement sand & brick ballast wil be supplied by the constractor on his own cost) |
| 37 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 38 | Earthing of Poles |
| 39 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. |
| 40 | Stringing & sagging of LT line upto proper sag including laying of ABC. |
| 41 | Mounting of 10 KVA Transformer along with HT< Connections per RESSPO norms. |
| 42 | Mounting of 100 KVA Transformer along with HT< Connections per RESSPO norms. |
| 43 | Laying, of Over head 11 KV XLPE cable as Per RESSPO norms |
| 44 | Grouting of11 KV Line as per RESSPO norms |
| 45 | Filling of 11cable jointing kit size 3x185mm2 11 KV indoor type as per Respo norms. |
| 46 | Shiffting of 10 KVA Transformer. |
| 47 | Shiffting of 100 KVA Transformer. |
| 48 | Dismantaling charge of Old 11 KV/LT line. |
| 49 | Cartage of Received back material from site to ESC Mirzapur Please Enable Macros to View BoQ information |