| 1 | Description and specification of items of work to be executed (complete work) |
| 2 | Provision for taking out brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 3 | Provision for removallime concrete from terrace about 6 m height manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer- in-charge. |
| 4 | Provision for removal of damaged windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead |
| 5 | Provision for removal of modern brick work manually including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge |
| 6 | Provision for brick work with common burnt clay brick of class designation 7.5 in foundation and plinth with cement mortar ratio (1:4) 1 cement : 4 coarse sand |
| 7 | Provision for providing, transportation, hoisting and fixing precast cement concrete in beams, lintle at ceiling including setting in cement mortar (1:3) 1 cement : 3 C sand including cost of centring & shuttering but excluding cost of reinforcement with (1:1.5:3) 1 cement :1.5 c sand : 3 natural aggregate 20mm nominal size |
| 8 | Provision for steel reinforcement for RCC work including straightening,cutting, bending, placing in position and binding all complete upto fifth floorusing TMT bar Fe 500D or more |
| 9 | Provision for flat brick terracing at top with cement mortar (1:3) 1 cement : 3 c sandmixed with 2% integral water proofing compound by weight of cement over 12 mm layer of cement mortar(1:3) 1 cement : 3 c sand and finished neat with FPS non modular brick tile class designation 10 |
| 10 | Provision for cement concrete layer in at roof level below brick terraing with 1:2:4 (1 cement : 2 C sand : 4 coarse agg. Natural stone agg.20mm nominal size ) |
| 11 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 C sand : 4 coarse agg. Natural stone agg.10mm nominal size ) including finishing with neat cement mortar (1:3) 1 cement : 3 c sand |
| 12 | Providing wood work in frames ofwindow, clerestory window, and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasterns of required dia &length (hold fast lugs or dash fastener shall be paid for separately) in second class teak wood |
| 13 | Providing and fixing panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of engineer in charge (Note butt hinges and necessary screws shall be paid separately) second class teak wood 35mm thick |
| 14 | Provision for providing corrugated G.S. sheet roofing including verticle / curved surface fixed with polymer coated J /L hook, bolt, nut 8 mm diameter with bitumen and G.I. limpet washer including coat of steel primer and two coat of approve paint, excluding cost of purlin, rafters, trushes and including cutting to size and shape whatever required 1 mm thick with zinc coating |
| 15 | Provision for cement plaster 12 mm thick outer side the foundation wall upto plinth level with cement mortar ratio 1:4 ( 1 cement : 4 fine sand) with combination of water proofing compound |
| 16 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm (inner side white and outer side pink matching with old pattern ) |
| 17 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture |
| 18 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work and removing it thereafter |
| 19 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |