|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 2 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 4 | 1:3:6 (1 Cement : 3 Pulverised sand (zone-III) derived from natura sources : 6 graded stone aggregate 40 mm nominal sizederived from natura sources) |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 6 | 12 mm Cement Plaster of mix: |
| 7 | 1:4 (1 Cement :4 River Sand) |
| 8 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. |
| 9 | With cement mortar 1:4 (1 cement : 4 fine sand) |
| 10 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. |
| 11 | 40 mm thick with 20 mm nominal size stone aggregate |
| 12 | Cleaning of Ring well by pumping out water along with cleaning of bottom and removing silt and other deposits and applhy bleaching on bottom and surface of wall inside the well, etc. All complete as per the direction of Engineer-in-Charge. |
| 13 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. |
| 14 | All kinds of soil |
| 15 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 16 | Finishing walls with textured exterior paint of required shade : |
| 17 | Old work (Two or more coats on existing cement paint surface applied @ 3.28 ltr/10 sqm. |
| 18 | Painting with black anti-corrosive bitumastic paint of approved brand and manufacture to give an even shade : |
| 19 | Two or more coats on new work |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 21 | Foundations, footings, bases of columns, etc. for mass concrete |