| 1 | Operation of water pumps for pumping water into the elevated tanks and sumps inside the port premises and distribution of water supply to the resident of ALHW colony, ALHW &PMB office, passenger toilets, water coolers installed at Jetty etc., including cost of all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent, cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge, including transportation charges of all materials to work site, all labour charges, minor tools, GST, Cess etc., complete. Internal Work exposed on walls. |
| 3 | CPVC Pipes (40mm nominal dia) |
| 4 | CPVC Pipes (25mm nominal dia) |
| 5 | CPVC Pipes (20mm nominal dia) |
| 6 | Providing and laying of Chlorinated Polyvinyl Chloride (CPVC) pipe fittings of various sizes of ISI mark, including cost of pipe fittings, cost of transportation charges of all materials to work site, all labour charges, minor tools, GST, Cess etc., complete.40mm dia fittings. |
| 7 | Elbow |
| 8 | Socket |
| 9 | Tee |
| 10 | Gate Value |
| 11 | Providing and fixing glazed earthen ware wash basin of size 550mm x 400mm with single hole for pillow tap with C.I or M.S. Bracket, including cutting holes and making good the same as directed by Engineer In Charge, including cost of cost of wash basin with all accessories (With I.S.I. Mark), cost of white lead, cement, pulverised stone sand, transportation charges of all materials to worksite, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 12 | Supply of water through water tanker/ truck to office complex, rest house and residential complex (during the period of March, April, May), including cost of water, hire charges of truck, driver, POL charges, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 13 | Cleaning the WC pans, squatting pan, urinal pans and washing of toilet floor with sanifresh, phenyl and bleaching powder etc., including cost of materials for cleaning, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 14 | Conveying of garbage from ALHW colony/Guest house area to outer side of residential area as directed by EIC with in a lead of 10km, including cost of hire charges of truck, driver, POL charges, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 15 | Sweeping and cleaning of ALHW Sub-Division offices (Civil and Mechanical sub-division), CC approach and surrounding area at Swaraj Dweep, including collection and conveying of sweepage / materials by head load to a designated dumping location within a lead of 100 to 150 meters, including dumping/disposal of the collected waste materials at the specified location, complete as per the direction of Engineer-in-Charge. The work includes the cost of all labour, brooms (soft and hard), collection tools, baskets/head-load carrying equipment, and any other minor tools or consumables required to complete the work in an efficient and safe manner, including cost of materials for cleaning, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 16 | Periodical cleaning the sump/over head tank (Sintex Tank), removing the sedimentation of water silt from the bottom of sump/tank and applying and cleaning with bleaching powder, including cost of materials for cleaning, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 17 | Providing and supply of workers as and when required for attending miscellaneous works which are non-susceptible to measure etc. including cost of all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 18 | Semi-Skilled Mazdoor for attending minor repair works, carpentry work, plumbing work etc. |
| 19 | Un-Skilled Mazdoor for attending as helper of carpentry work, plumbing work, trimming of trees, up-keeping of store materials etc. |
| 20 | Periodical servicing and maintenance of RO water purifier installed at ALHW Sub-Division Office at Swaraj Dweep, excluding cost of spares but including cost of servicing and transportation charges of RO water purifier, all labour charges, minor tools, labour welfare cess, GST etc, complete. |
| 21 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, including cost of all labour charges, minor tools, labour welfare cess, GST etc, complete. All kinds of soil |
| 22 | Providing and laying CC 1:3:6 (1 Cement, 3 Pulverised sand & 6 Stone chips of size 20mm graded Sri Vijaya Puram local quarry) in all CC works as directed by the EIC, including cost of cement, cost of stone chips and pulverised sand, (excluding cost of centering and shuttering charges which will be paid separately), but including the cost of screening and washing of both the aggregates, running charges of concrete mixer, conveying the concrete, placing in position, consolidation with vibrator, curing, including cost of all materials, all labour charges, transportation charges of all materials to worksite, minor tools, labour welfare cess, GST etc, complete. |
| 23 | Providing and laying RCC M20 (1:1.5:3, one cement, one and half mainland river sand & three mainland stone chips) using 20mm graded stone chips from mainland, mainland river sand, 43 grade ordinary portland cement for cast-in- situ concrete and as directed by the EIC, including cost of cement, cost of mainland stone chips and mainland river sand, (excluding cost of centering and shuttering charges which will be paid separately), but including the cost of screening and washing of both the aggregates, running charges of concrete mixer, conveying the concrete, placing in position, consolidation with vibrator, curing, including cost of all materials, all labour charges, transportation charges of all materials to worksite, minor tools, labour welfare cess, GST etc, complete. |
| 24 | Providing form work with marine plywood 19mm thick, including centering and shuttering so as to give a rough finish, strutting and propping etc. and removal of the same from reinforced cement concrete and plain concrete work, as directed by the EIC, including cost of marine plywood, centering andshuttering, all labour charges, cost of binding materials, cost of transportation charges of all materials to work site, cost of ballies, cost of minor tools and plant, labour welfare cess, GST etc, complete.Foundations, footings, bases for columns and mass concrete. |
| 25 | Supply, delivery and transportation of steel of grade Fe 500 HCR/CRSfor fabrication and fixing of reinforcement for substructure and superstructure works as per the direction of EIC including cost of fabrication and fixing steel rods, cost of steel rods, all handling charges, cutting, bending, lapping, welding in position wherever necessary and tying with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to work site, cost of binding wires, all T&P required for the work, minor tools, GST, labour welfare cess etc., complete. |
| 26 | Steel work in built up Pedestal of water tank, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welded and bolted, including cost of all materials like ISMB, MS Angle, MS Plate, MS Pipe, hire charges of welding machine, cost of welding rods, painting the steel surface with two coats of anti-corrosive paint, scaffolding charges, etc, and as directed by the EIC, cost of transportation charges of all materials to work site, all labour charges, tools and plants, GST, labour welfare Cess etc., complete. |
| 27 | Painting two or more coats on new work with 1st quality synthetic enamel paint of approved brand and manufacturer over the steel structure like MS Angle, ISMB, MS Pipe, base/gusset plate, stiffeners etc., and as directed by the EIC, including cost of all materials like paint, brush, scaffolding charge, transportation charges of all materials to work site, all labour charges, minor tools, GST, labour welfare Cess etc., complete. |