| 1 | Clearing of light jungle growth for formation of path for execution of works and monitoring |
| 2 | Formation of Path for Patrolling, Material Supply & Erection (As per SS 20 B) |
| 3 | Earth work for erection of pillar |
| 4 | PCC using 1:2:4 20mm Jelly |
| 5 | Supply of 65 mm dia GI B class Pipe |
| 6 | GI WIRE-2.0mm (100gsm), non rusting quality for main line. |
| 7 | GI WIRE ROPE- 1.5mm (100gsm) and non rusting quality |
| 8 | BULLETS (Connectors)- of copper material coated with stainless steel having an inner core hole size of 2.5mm diameter, 2cm length |
| 9 | SUPER STRAIN INSULATER Must be of polycarbonate material and should withstand of 16 kv. |
| 10 | ERRECTION OF HANGING FENCE INCLUDING TRANSPORTATION OF MATERIAL TO THE WORK SITE. Erection includes fixing bottom fixtures firmly into the ground using concrete, fixing GI pipes into the bottom fixtures, fixing ropes and wires as per the design and commissioning of system. (Using 1st class fitter for specialed work). In one day, 10 fitters can install a length of100 mts in 1 days |
| 11 | Fabrication and modification to the vertical post & Bottom Fixture (Welding of clamps, Holes, Pulley etc.,) |
| 12 | Insulating Bush - UV stabilized, heat resistant, non electrical conductible poly propylene material for fixing inside the GI square tube of Bottom Fixture. |
| 13 | ENERGIZER FOR 4KM: With the following specifications.• Must be from a reputed company• Must confirm to IEC 603352-76 and all National and International standards of safety.• Switch to high, medium and low power settings.• Solar panel option to recharge 12 volt battery.• Full & reduced power output terminals can be operated at once on different fences independently.• Should possess the following output characters- Peak o/p voltage not more than 10 KV on 50 K load.- O/p energy 3.5 J minimum- Pulse duration 1.01-3.0 m.sec- Pulse interval 1.1-1.4 sec- Peak current 7.0-8.0 A-High- RMS current 2.4-2.8A-High- Charge 1.0-1.4 mC-High3years warranty against manufacturing defects |
| 14 | SOLAR MODULE: With the following Specification• 120 watts, 12 volts rating with minimum 10 years warranty against manufacturing defects. |
| 15 | SOLAR CHARGE CONTROLLER to regulate the charging of the battery. |
| 16 | BATTERY: Must have 12 Volts, 150 AH Tubular Batteries, maintenance free (Exide/Base/okaya) battery with at least 3 years guarantee. |
| 17 | LIGHTNING DIVERTER:Must be capable of diverting stray lightening.The diverter assembly must be adjustable for spark gaps. : Adequate earthing to be provided |
| 18 | EARTHING SYSTEM Must contain earth mixture capable of retaining moisture and 8 MM dia stainless steel rod-non rusting quality of 4 feet long |
| 19 | LEAD OUT CABLE: Must be double insulated withstanding 15 KV voltage and Inner core wire must be GI |
| 20 | Sign Board in Polyethylene plastic with statutory warning Please Enable Macros to View BoQ information |