| 1 | Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposalof dismantled material up to a leadof 1 kilometer, as per direction of Engineer-in-charge. |
| 2 | Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.Water bound macadam road. |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 4 | Preparation and consolidation of sub grade with power road roller of8 to 12 tonne capacityincluding making good the undulations etc. as per direction of engineer in charge |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold Twisted bars |
| 6 | Centering and shuttering including strutting, propping etc., and removal of form for Foundations, footings, bases of columns, etc., for mass concrete |
| 7 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 Crushed Stone Sand : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 9 | Providing and laying design mix cement concrete of M-40 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using crushed stone sand and graded stone aggregate of 20 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineerin- charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-40 is @ 390 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. Cement concrete manufactured in automatic batching plant (RMC plant) including transportation to site in transit mixer |
| 10 | Providing and fixing pre-moulded joint filler in expansion joints of RCC roads / CC pavements after making the joints dust free with high pressure air jet cleaners, all complete as per direction of the Engineer-in-Charge. (Pre-moulded joint fillers shall be made of bitumen hot sealing compoundimpregnated fibre board having impregnation more than 35%, conforming to IS:1838 for fibre board and IS: 1834 for hot sealing bitumen compound grade A.) |
| 11 | Providing and filling in position rubberized bitumen hot sealing compound for sealing of expansion joints in roads / pavements all complete as per direction of the Engineer-in-Charge. Using grade \"A\" sealing compound conforming to IS: 1834 |
| 12 | Repurchase price of dismantled materials (to be paid by or recovered from the contractor work bill) Inclusive of cost born for loading and unloading etc., by the contractor. Excavated stone aggregate from GSB (greater than or equal to 40 mm) |
| 13 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 14 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. 80 mm dia nominal bore |
| 15 | Providing, laying and fixing following dia G.I. pipe (medium class) inground complete with G.I. fittings including trenching and re-filling etc as required.100 mm dia |
| 16 | Providing and applying FOSROC Nitoflor Hardtop non-metallic surface floor hardener @ 5 kg/sqm including finishing of the top surface by floating method using power trowel with disc (floater) as directed by Engineer-in-charge. |