| 1 | Desilting/ Removal of sludge and silt consisting of slushy earth, algae, boulders and other foreign materialby necessary excavation , disposting off the sludge by lifting from bottoms to top of tankthrought help of pulleys or any mechanical device up toa height of 8 meterand throwing the same awayfrom the monument bywat of trator trolley etc complete. |
| 2 | Provision for taking out of dumped heavy architectural / ornamental Stone members around of main Structures by sorting out the serviceable material & shifting them properly at suitable place for reuse during the conservation of structures & disposal the unserviceable material lead approximate 100 mtr away of working site etc complete. |
| 3 | Taking out / removal of existing bulged / out of plumb R.R. stone Massonarry wall sorting out the serviceable material & stacking the proper place for reuse & disposal the unserviceable material by head load up to lead 200 mtr. etc complete |
| 4 | Earth work excavation manually for base of pathway / flooring in all sorts of soil including throwing away the excavated earth outside of monument premises including all labors, T & P etc. all complete as per direction of site in-charge. |
| 5 | Laying the Brick Jelly Lime Concrete in 1:2:4 (1 Lime: 2 Sand:4 Brick aggregate) below the flooring / pathway including ramming, consolidating and leveling etc. complete including compacting, curing, finishing, T & P, materials, labors etc. all complete. |
| 6 | Provision for construction of a dwarf wall of rubble masonry in Lime mortar 1:1:1 ( Lime :1B.Surkhi: 1 C.Sand) of 1.0 m total height, comprising 0.60 m foundation below ground level and 1.00 mheight above ground level, for protection of water bodies etc complete,as per direction of site in charge. |
| 7 | Providing & laying 12cm thick sand stone flooring smooth and plain dressed set in L.S.S.(1:1:1) (1 part lime, 1 part sand, 1 part surkhi) mortar mixed with additives like gur, gugal, methi etc. including pointing, curing, all materials, labors, T & P etc. all complete as per direction of site in-charge. |
| 8 | Recess pointing the R.R. Stone masonry wall in lime surkhi mortar 1:1:1 (1 lime : 1 surkhi : 1 C. Sand) with coloring pigment for matching with the original texture including raking cleaning and washing at the joints out etc. complete. |
| 9 | Providing & fixing the M.S Gate with Angle iron 50x50x6mm shutter & 16 mm squire bar 10 cm c/c distance & fixing them in .Rolled Steel Channels ( 125 x 50) mm size as per drawing & design including Painting two or more coat with syntactic enamel paint over red Oxide primer & fixing the lime cement mortor & transformation Charges with loading / unloading etc Complete |
| 10 | Provision for clearance of the debris/ malba/ Small size R.R.Stone /earth by sorting out the serviceable stone & others and disposal the unserviceable material lead approximate 100 mtr away of working site etc complete |
| 11 | Provision For a Minor Repairing of the MS.Railing (fencing) i.e M.S Mesh,Iron patti,Ms angle, * Repainting the M.S Railing synthetic enemal paint Two or more coatof approved brand / shade with scraping bybrush & sand paper for preparing the surface smooth etc complete |
| 12 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish lead up to 50 mtr. And lift up to 1.50 mtr etc complete in all respect |