| 1 | Dismantling of C.C Road incl. sorting & stacking of serviceable materials incl. supply of lab,T&P etc complete |
| 2 | Excavation of foundation in ordinary soil incl. lift up to 1.50 mtr incl. supply of lab,T&P etc complete |
| 3 | Concrete work with 20 gauge brick blast, L.Sand & cement in foundation incl. supply of lab,mat,T&P etc complete |
| 4 | Making arrangement of barricading with sal ballies, red flag, lab,T&P etc complete |
| 5 | 1st class brick work with 1:3 cement & coarse sand mortar incl. supply of lab,mat,T&P etc complete |
| 6 | 12 mm thick plaster with 1:3 cement & L.Sand incl. supply of lab,mat,T&P etc complete |
| 7 | Providing bier to retain sewage water etc complete |
| 8 | RCC work with cement, C.sand & 20 mm gauge appd stone ballast in 1:1.5:3 incl. supply of lab,mat,T&P etc complete |
| 9 | Mild steel / iron work in slab incl. supply of lab,T&P etc complete |
| 10 | Bailing out of water with 5 HP mud pump incl. all accessories & supply of lab,T&P etc complete |
| 11 | Cast concrete for seat fixing incl. supply of lab,mat,T&P etc complete |
| 12 | Supply & laying of RCC pipe 300 mm dia incl. supply of lab,mat,T&P etc complete |
| 13 | Making sewer line connection incl. supply of lab,mat,T&P etc complete |
| 14 | Supply of RCC frame size 650 x 75 mm |
| 15 | Supply of RCC cover on M.H size 650 x 75 mm |
| 16 | Disposal of surplus earth & dismantled malva incl loading/unloading etc complete |
| 17 | Unforeseen work as cartage of pipe incl loading/unloading etc complete Please Enable Macros to View BoQ information |