|
| 1 | Repairs to the front wheels of the truck by way of their dismantling, extraction of worn-out / damaged parts, washing with diesel and cleaning with waste cotton cloth and repairing by way of P/F new F/W oil seals (inner and outer) - 04no each, F/W bearings (inner and outer) - 04no. each, F/W brake linings with rivets -08nos, turning of wheel drums, adjustment of brakes and bleeding the air, Complete job including cost of material and labour charges. |
| 2 | Repairs to the electrical system of the vehicle by way of P/Laying of new electrical wiring set (24 volt) front and rear for the complete wiring system, front indicators – 02 No, side indicators – 02 No, rear brake light units – 02No, Rear Indicators – 02 No, Fuse Box Unit – 01 No, Battery Terminals – 04 No, Battery Leads (+ve and –ve) – 01 metre each and Battery combination lead – 01 No. Job includes cost of material, testing circuit on load, tools and tackles, skilled labour charges, carriage, transportation and all taxes applicable. |
| 3 | Labour charges for dismantling of the clutch system and removing of all damaged / worn out parts and p/f of new parts i.e. clutch plate set 01 no., pressure plate – 01 no., clutch release bearing – 01 no., clutch release fork – 01 no. fly wheel ring, allied spare parts and then assembling the same to the vehicle. The job includes cost of material, tools and tackles, skilled labour charges, carriage, transportation and all taxes. Complete job |
| 4 | Repair to the transmission system of the vehicle by way of dismantling the propeller shaft, removal of defective parts, P/F of U-J Cross Assembly – 01 No, Flange Assembly – 01 No, Coupling Nut and Bolt – 08 No, Transmission Booster Pump – 01 No Complete with all assorted nuts and bolts, Assembling the propeller shaft to the vehicle and all allied works. Job includes cost of material, tools and tackles, skilled labour charges, carriage, transportation and all taxes applicable. |
| 5 | Repairs to the Vehicle by way of dismantling the front and rear leaf assemblies by way of cutting the centre bolt by means of gas welding and removing the damaged parts, P/F of new parts i.e. Front Leaf spring 01 No, front leaf spring 2nd – 01 No, front leaf spring 4th – 01 No, rear spring main – 01 No, rear spring 2nd – 01 No, leaf spring bush (front and rear) – Complete Set, U Clamp – 01 Set, shakle bush – 02 No, U Bolt – 02 No, Job also includes retensioning of all leaf spring by hammering to the optimum curvature, assembling the leaf spring assembly, fitting and alignment of front and rear spring assembly and allied works. Job includes cost of material, tools and tackles, skilled labour charges, carriage, transportation and all taxes applicable. |
| 6 | Engine Oil |
| 7 | Engine Oil Filter |
| 8 | Water Separator Filter |
| 9 | Diesel Filter Set |
| 10 | Coolant |
| 11 | Fuel Strainer |
| 12 | Brake Fluid |
| 13 | Wheel Bearing Grease |
| 14 | Air Filter Primary & Secondary |
| 15 | Steering Oil |
| 16 | Gear Oil |
| 17 | HSD for transportation of Trailer from Kishtwar to Jammu (To and Fro) including Toll Tax (To and Fro) Please Enable Macros to View BoQ information |