| 1 | Earth work in excavation /mud cleaning for nalla contruction in comp.position |
| 2 | Disposal surplus earth from site up to 90% |
| 3 | Water dirvision charge for nalla contruction work |
| 4 | Earth work in filling with cartage 5.0km lead including royality in comp.position |
| 5 | Cc in (1:4:8) in nalla bed with 4cm gauge b/ballast cement c/sand in comp.position (s.i-281) |
| 6 | M-150 brick work in (1:3) mortar with cement and f/sand in wall and drain in comp.position (s.i-306) |
| 7 | 12 mm thik plaster in (1:4) mortar with cement and f/sand on brick work in comp.poition (s.i-584) |
| 8 | Rcc work in (1:1.5:3) mortar with approved stone grit cement c/sand in nalla wall and bed including shuttering deshuttering in comp position (s.i-284) |
| 9 | Reinforcement and its bending but excluding its fixing and bending centring and shuttering including all material labour tools etcin comp position DSR |
| 10 | contruction of plain cement concrete pavement in (1:1.5:3) mortar with 2cm gauge stone grit cement c/sand and laying of 125 micron thick polythine film including all material labour tool etcin comp .position (s.i-new item -9(1) |
| 11 | s/fixing sign board at site in comp .position |
| 12 | Excavation in foundation in ordinary soil including lift upto 2.10 M. and lead upto 30.00 M. and including filling watering and ramming of excavated earth into the trenches. S.I NO 251 |
| 13 | Concrete with 4cm gauge brick ballast, fine sand of 1.25 F.M. and cement, in proportion of 10:5:1 in foundation including supply of all material, labour, tools % plants etc. required for proper completion of the work. S.I NO 274 |
| 14 | RCC work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportion of 1:1.5:3 in column and T-beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc. and supply of all material, labour, tools , and plants etc. required for completion of the work including cost of the binding wire. The rate excludes making of drip course which shall be paid extra. S.I NO 289 |
| 15 | M150 brickwork in 1:4 (one cement four coarse sand) in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. S.I NO 305 |
| 16 | Mild steel |
| 17 | RCC work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportion of 1:1.5:3 in column and T-beam excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire and including necessary centering and shuttering etc. and supply of all material, labour, tools , and plants etc. required for completion of the work including cost of the binding wire. The rate excludes making of drip course which shall be paid extra. S.I NO 289 |
| 18 | Mild steel |
| 19 | M150 brickwork in 1:4 (one cement four coarse sand) in foundation and plinth including supply of all materials, labour, tools and plants etc. required for proper completion of the work. Above G.L. upto 0.91 m. height. S.I NO 305 |
| 20 | 12 mm th. Plaster with cement and approved coarsse sand in 1:3 over brick work minimum thickness not to be less than 1 cm. including supply of all materials, labour , tools and plants etc required for proper completion of the work. S.I NO 582a |
| 21 | Granite or Marble Stone as specified on top and sides, concrete base including supply of all materials , labour, tools, and plants etc. required for proper completion of the work. Polished Granite stone slab of colour Black, cherry/ruby red or equivalent. Dsr – 11.56.1 |
| 22 | STATUE OF FARMER/RELIGIOUS ETC. including supply of all materials , labour, tools, and plants etc. required for proper completion of the work. |
| 23 | Electric work, water supply And Miscellaneous work Please Enable Macros to View BoQ information |