| 1 | (4.10.1.1) Earth work in excavation in foundation, trenches etc. includingdressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 2 | (25.1.2) Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 3 | (2.4.2) Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks |
| 4 | (1.1.3) Carriage of Materials by mechanical transport including loading,unloading and stacking ::Stone,boulders,gravelly material Rate for lead 5Km. |
| 5 | (22.1.1) Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting,propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. |
| 6 | (21.7.1) Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 50mm thick |
| 7 | (32.3.2) Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix :1:4 (1 cement : 4 fine/ coarse sand) |
| 8 | (12.6.3) Providing and fixing of reinforced Ferro-Cement drain coversdesigned for \"AA\" class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc.Standard Size 1500x600mm (125mm thick) for span 701 to 1200mm |
| 9 | (23.19.6) Reinforcement for R.C.C. work at all levels including straightening,cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. |
| 10 | (23.1.2) Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 11 | (29.2) Structural steel work riveted, bolted or welded in built up sections,trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 12 | Desilting of covered nala/covered drain(which will incude continues covering for 5 mtr& above length at a stretch)including removing of stone patties,ferro cement drain covers,deismantling of existing cc flooring etc & replacing the same(without mortar & C & C etc)after desilting of nallah.specing of opening should not be more than 5mtr.or as per direction of engineer in charge with lead upto 50 mtr & all lift complete in all respect. Please Enable Macros to View BoQ information |