| 1 | HT/ LT LINE ERECTED |
| 2 | PSC Pole 9.0m |
| 3 | PSC Pole 8.0m |
| 4 | Base Plate |
| 5 | Tapping Cross arm |
| 6 | Guarding X arm |
| 7 | V X arm 4\"6\" |
| 8 | HT TI Fitting |
| 9 | LT 3 0 X arm |
| 10 | LT S 0 X arm |
| 11 | Back Clamp 9.0m PSC |
| 12 | Back Clamp 8.0m PSC |
| 13 | Stay Clamp 9.0 PSC |
| 14 | Stay Clamp 8.0 PSC |
| 15 | Insulator 22KV Polymer Composite Pin Type |
| 16 | Insulator 22KV 70KN Polymer Come Disc |
| 17 | Metal Parts for Rabbit/Weasel Conductor |
| 18 | LT Shackle with MP |
| 19 | LT Pin with Insulator |
| 20 | Alu, Knob |
| 21 | Stay Plate |
| 22 | Guy Shackle H.T |
| 23 | Stay Set Complete |
| 24 | Stay Wire 7/12 |
| 25 | GI Wire No.8 SWG |
| 26 | Pole Concreting |
| 27 | Pole Earth |
| 28 | AAAC 7/3.15 mm |
| 29 | AAAC 7/2.50 mm |
| 30 | Bolt & Nut MS 6 \"X 5/8\" 150X16mm |
| 31 | Bolt & Nut MS 2 1/2\"X5/8\" |
| 32 | Bolt & Nut MS 3 1/2\"X5/8\" 88/90X16mm |
| 33 | Bolt & Nut MS 4 1/2\"X5/8\" 113/120X16mm |
| 34 | Washer MS 5/8\" 16mm |
| 35 | Storage @3% |
| 36 | Labour and Transport charges (for loading, unloading,transport@5% and erection of materials at new locationP10%) Total 15% |
| 37 | Add : dismantling charges for the reusable materials dismantled and to be devoluted to stores |
| 38 | Add : transport charges on the scrap materials to be devoluted to stores |
| 39 | DT Structure Erected |
| 40 | PSC Pole 9.0 Mtr 400 Kg WL |
| 41 | Base plate |
| 42 | Structure Materials for Transformer |
| 43 | Clamp Transformer Stucture 9.0mtr PSC Pole |
| 44 | AB Switch 22KV 6 Pole W/ Insulator |
| 45 | HG Fuse set 22KV Set W/Insulator |
| 46 | LAS Distn Type 18KV/22KV |
| 47 | Structure earthing arrangements GI Earth pipe 40mm dia 3mtr Iona includina GI wire 8 SWG |
| 48 | Mass concreting and coping with sand ,Blue metal and cement for DP |
| 49 | Stay set complete incl,GI Wires 5Kg, Thimble, 20mm road,Stay plate & Stay Clamp (Pair) |
| 50 | Guy Shackle HT |
| 51 | Jumering Materials |
| 52 | LAS Distn Type LT |
| 53 | Open Fuse unit LT Complete |
| 54 | Danger Board of various type |
| 55 | Bolt & Nut GI 5/8X15\" |
| 56 | Bolt & Nut MS 6 \"X 5/8\" 150X16MM |
| 57 | Bolt & Nut MS 4A1/2\"X5/8\" 113/120X16MM |
| 58 | Bolt & Nut MS 3A1/2\"X5/8\" 88/90X16MM |
| 59 | Bolt & Nut MS 2A1/2\"X5/8\" 63/65X16MM |
| 60 | Washer MS 5/8\" 16MM |
| 61 | LT Open type Set Arrangement |
| 62 | Cross Arm Guarduinq |
| 63 | Back Clamp PSC Pole |
| 64 | Channel X Arm 3 0 LT |
| 65 | Stay Clamp PSC 9.0mtr |
| 66 | LT Pin with Insulator |
| 67 | Alu Knob |
| 68 | ACSR 7/4.09 mm |
| 69 | Storage @3% |
| 70 | Labour and Transport charges (for loading, unloading,transport@5% and erection of materials at new locationP10%) Total 15% |
| 71 | Labour & Transport charges for re-erection of dismantlingold materials at new site (tor loading from old site , unloading at new site@10% and erection 10% at new location Total 20% |
| 72 | 63KVA/ 22KV/ 433V Dismantling and re-erection at new site (Actual) UnLoading Rs.600+Loading Rs.600+Dis Mantling Rs.500+Erection Rs.1000+ Transport Rs.1000 |
| 73 | Add : dismantling charges for the reusable materials dismantled and to be devoluted to stores |
| 74 | Add : transport charges on the scrap materials to be devoluted to stores |
| 75 | Calculation of SubTotal, GST and Total carried out by system automatically |
| 76 | Sub Total Amount for above all items (excluding GST) |
| 77 | GST 18% for above SubTotal Amount |
| 78 | Total in Figures (SubTotal + GST) |