| 1 | EARTH WORK |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth anywhere in campus and any lift, as directed by Engineer-in-charge. |
| 3 | All kinds of soil |
| 4 | Filling quarry muck in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., for all lead and lift : |
| 5 | CEMENT CONCRETE (CAST IN SITU) |
| 6 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | 1:4:8 (1Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: |
| 9 | Foundations, footings, bases for columns |
| 10 | REINFORCED CEMENT CONCRETE |
| 11 | Providing and laying in position specified grade of reinforced cement concrete,excludingthecostofcentering,shuttering,finishingand reinforcement - All work up to plinth level : |
| 12 | 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 14 | Steel reinforcement for R.C.C. work ready to use \"cut and bend\" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level. |
| 15 | Thermo-Mechanically Treatedbars of gradeFe-500D or more. |
| 16 | WOOD AND P. V. C. WORK |
| 17 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. |
| 18 | Fixed to steel windows by welding |
| 19 | FINISHING |
| 20 | 12 mm cement plaster of mix: |
| 21 | 1:4(1 cement: 4 fine sand) |
| 22 | Finishing walls with Acrylic Smooth exterior paint of required shade: |
| 23 | Old work (Two or more coat applied @ 1.67 Itr/ 10 sqm) on existing cement paint surface |
| 24 | Finishing Floors with premium floor guard (Apex floor guard or equivalent) with Silicone additives of required shade: |
| 25 | Two or more coats applied as per manufacturer specifications |
| 26 | Dismantling and Demolishing |
| 27 | Dismantling interlock paver tile carefully, including cleaning and stacking of serviceable materialin engineering unit storeanddisposal of unservicable material ousidein campus and for all liftasper direction of Engineer - in - charge. |
| 28 | ROAD WORK |
| 29 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed ofsand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. |
| 30 | 80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. |
| 31 | Providing and laying available Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, over 50 mm thick compacted bed ofsand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. |