| 1 | Part A: Transportation, installation, commissioning & trial run of one 1000mm width, 2X150kW, 6.6kV, double drive belt conveyor for a length of 69mtr from 59L/8D to 59L/10D in R-VII seam. |
| 2 | Loading, transportation and unloading of one breaker(6.6kV/200A), starter(6.6kV/2X150kW), LS unit from surface to 59L/8R(R-VII) with help of haulages & 100 mtr manually. (Distance- approx. 3800mtr.) |
| 3 | Laying-hanging of 100mtr 6.6kV grade 70 sq.mm. PVCDWA cable from 62L/9R ACB to 59L/9R ACB manually. |
| 4 | Transportation of the 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Loop take up structure, lockout arrangement((10+2.5+2.56+0.945+40.21) ton) and installation at 59L/9D (R-VII) with necessary fabrication job. |
| 5 | Transportation of 140mtr. 1000mm width PVC belting from dismantled site to 59L belt installation site(9D/59L) with help of haulages & 10mtr manually. |
| 6 | Laying, lapping, jointing & tensioning of this 140mtr. 1000mm width PVC belting in proposed 59L belt. |
| 7 | Taking apart 1000mm width, 2X150kW, 6.6kV, double Drive Head unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, baseplate, fencing etc., Loop take up structure, lockout arrangement and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7 (for 1 ton)Actual calculation will be done on tonnage, breakup given ((10+2.5+2.56+100.53+0.945) ton) |
| 8 | Unlapping & pulling out of approximately 1400 mtr. (including loop) 1000mm width PVC belting of previously installed belt conveyors at panel 7,8 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage. |
| 9 | Transportation of 420mtr. 1000mm width PVC belting from dismantled site to extension site of the previously running belt conveyor(8D/59L) with help of haulages & 10mtr manually. |
| 10 | Laying, lapping, jointing & tensioning of this 420mtr. 1000mm width PVC belting in extension site of the previously running belt conveyor(8D/59L). |
| 11 | Transportation of the 1000mm width tail end((0.945) ton) and installation at 58L/8D.(For 1 ton)(As per committee report Sl.no. 2 ECL/GM/JNR/2024-25/303 Dt. 29.08.2024) Final amount will be calculated on tonnage(0.945 for 1000mm tail end) |
| 12 | Transportation of 500mtr belt sequence cable from surafce to 72L/8D(R-VII); then laying-placing them from 72L/8D starter to 59L/9D starter in R-VII seam. |
| 13 | Testing, trial run, alignment & commissioning of 59L belt conveyor from59L/8D to 59L/10D and previously installed belt conveyor(after extension of 5 pillars) in R-VII seam. |
| 14 | Supply of M.S. Nut & Bolt 5/8x2\" |
| 15 | Supply of DA cylinder(6.2 cum) |
| 16 | Supply of industrial oxygen cylinder(7.1cum) |
| 17 | Supply of 5T Turnbukle 89 G 63-88 |
| 18 | Part B: Twelve times extension for a length of 12 pillars 414mtr. from 59L/10D to 59L/22D in R-VII seam. Each time belt extension will be for a length of 34.5mtr. |
| 19 | Transportation and Installation of 34.5mtrs of belt structure(weight of 1000mm structures is 0.1457MT/mtr.) |
| 20 | Transportation of 70mtr.(approx) 1000mm PVC belting through haulages & 100mtr. manually to 59L(R-VII) belt extension site. |
| 21 | Laying, Lapping, Jointing & Tensioning of this 70 mtr. 1000mm belting and trial run. |
| 22 | Shifting and installation of tailend at the time of belt extension |
| 23 | Supply of M.S. Nut & Bolt 5/8\"x2\" |
| 24 | Part C: Civil Work |
| 25 | Civil foundation works for installation of 2X150kW, 6.6kV, 1000mm wide belt conveyor drive head, discharge unit, loop take-up unit and platform for VCB, Starter for proposed 59L belt conveyor of 3&4 incline, JPC. |
| 26 | Part D: Roof heightening by drilling and blasting in stone, cleaning, roof bolting, including cost of drill rod, drill bit for installation of proposed 59L belt conveyor in R-VII seam of 3&4 incline under JPC. |
| 27 | Roof heightening by drilling, blasting in stone including dressing, Cleaning with cost of drill rod and drill bit. (Excluding cost of explosive & detonator). |
| 28 | Roof bolting including carrying of materials from surface to u/g side, drilling, grouting & cost of drill rod and drill bit. |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |