| 1 | Geotechnical Investigation for the Proposed Additional NP Equalization pit at FACT Cochin Division, Kochi. |
| 2 | Mobilisation of all necessary equipment and personnel at the proposed location including setting up of equipment at various test locations, shifting from one location to the next location and dismantling, demobilising the same after completion of work. |
| 3 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From Ground level up to 10m depth. |
| 4 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: From 10m to 20m depth below Ground level. |
| 5 | Boring 150mm minimum diameter bore holes through different strata except boulders and hard rock including conducting standard penetration test and collection of samples from split spoon and disturbed samples from soil layers as specified: Beyond 20m depth below Ground level. |
| 6 | Drilling through hard rock/ boulders using Rotary Drilling and collection of core samples with Nx size coring bits including preservation of core samples in standard core boxes as specified. |
| 7 | Determination of ground water level and collection of water samples as specified or as directed by the Engineer-in-charge. |
| 8 | Collection of undisturbed soil samples including sealing the sampling tube, handling, transportation, etc. complete. |
| 9 | Natural moisture content |
| 10 | Bulk and dry density test. |
| 11 | Grain size analysis. Sieve analysis. |
| 12 | Hydrometer analysis. |
| 13 | Atterberg limits |
| 14 | Specific gravity |
| 15 | Unconfined compression test |
| 16 | Tri-axial (CD) test |
| 17 | Consolidation test. |
| 18 | Direct shear test |
| 19 | Uniaxial Compressive Strength of Rock |
| 20 | Chemicalanalysis of groundwatersamplesincludingdetermination of sulphate,chloride, carbonate, PH value, etc |
| 21 | Chemicalanalysis on soil samples todeterminesulphate,chloride, carbonate, PH value, etc. |
| 22 | Submission of final soil investigation report (5 copies) outlining the complete investigation works with theanalysis of results, bore log details and recommendations for the foundation systems, etc. as specified, duly certified by competent Geotechnical Engineer as defined in specific requirement of work. |