| 1 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary Soil B Mechanical Means with dewatering i) Depth upto 3 m |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Manual Means (B) RCC |
| 3 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser PCC Grade M15 |
| 4 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser RCC M35 Grade (i) Unsing Concrete Mixer |
| 5 | Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. Without plasticiser R.C.C grade M 25(i) Unsing Concrete Mixer |
| 6 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) |
| 7 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork(N) Without plasticiser (H) RCC Grade M35(a) Height upto 5 M using plasticiser, using concrete mixer |
| 8 | Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork(N) Without plasticiser RCC M25 Grade (i) Unsing Concrete Mixer |
| 9 | Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing andtechnical specifications(a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) |
| 10 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification. |
| 11 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular Material |
| 12 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. |
| 13 | Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification\" including steel shuttering formwork. (P) With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999.C. RCC Grade M35Case I : Unsing Concrete Mixeri) For solid slab super-structurea)Height up to 5m |
| 14 | Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) |
| 15 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications |
| 16 | Drainage Spouts complete as per drawing and Technical specification |
| 17 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification |
| 18 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specificationa) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) |
| 19 | Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) A For plain surface ( kerb +crash Barrier) |
| 20 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material |
| 21 | Span Load Test - Load testing of one or more spans of bridges as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor\"s labour, deflection measuring instruments, loading materials, recording and analyzing the load testing results including all leads and lifts etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges/loading materials etc. The load shall be 1.25 times the stipulated design load based on Design load & not span ( Extra for every increase of 100.00 mt or part there for in the span load capacity up to 800.00 mt. |
| 22 | Non-Destructive testing with Ultrasonic Pulse Velocity Meter with data storage facility for detection of cracks, voids and other imperfections in Reinforced concrete structures and furnishing the findings thereof in proper comprehensible format, complete as directed by the department |
| 23 | Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 Curtain wall, Levelling course Cement concrete grade M 10 |
| 24 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, Curtain wall1202 & 1203 A with crushed stone, III PCC Grade M20 Nominal mix (1:2:4) |
| 25 | Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall |
| 26 | Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 Rubble stone laid in cement mortar 1:3 CC BEDDING TO BE MEASURED and PAID EXTRA |
| 27 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,1202 & 1203 With crushed Stone, PCC M 15 Nominal mix (1:2.5:5) |
| 28 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 |
| 29 | Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder |
| 30 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 31 | Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 Total nos 2*8= 16 |
| 32 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) from private land |
| 33 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (a) from private land |
| 34 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.A)By Mix in Place Method for grading- II Material |
| 35 | WBM Grading 2 Using stone screening Type-B 11.2 mm for Gr.II Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. Manual means |
| 36 | WBM Grading 3 Using stone screening Type-B 11.2 mm for Gr.III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means |
| 37 | Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. Including Edge block/ Edge restraints |
| 38 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stackingthem at suitable places as directed. |
| 39 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) |
| 40 | Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309 (over earthen shoulder and side slope beyond boulder pitching |
| 41 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. 600mm equilateral triangle |
| 42 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. 800mm x 600mm rectangular |
| 43 | Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801. 600mm circular |
| 44 | Type - A, \"W\" : Metal Beam Crash Barrier (Providing and erecting a \"W\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mmX75mmX5mm, 330mm long complete as per clause 810.) |
| 45 | Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. |
| 46 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department |
| 47 | Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 48 | Implementation of Enviromental and Social Management Plan -Water Quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 49 | Implementation of Enviromental and Social Management Plan -Noise Quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 50 | Implementation of Enviromental and Social Management Plan -Soil Quality monitoring at 3 locations before the start of the construction work and will be treated as the baseline data. (3 Locations x single time = 3 Nos. of sample) First Year 1st season of of the works(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 51 | Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations for 3 seasons for 2 consecutive years (3x3 Season) (Construction Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 52 | Implementation of Enviromental and Social Management Plan -Water quality monitoring at 3 locations for 3 seasons for 2 consecutive years (3x3 Season) (Construction Stage)(i)Br. No. 1/1 Dusutimukh Hospital Road |
| 53 | Implementation of Enviromental and Social Management Plan -Noise quality monitoring at 3 locations for 3 seasons for 2 consecutive years (3x3 Season) (Construction Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 54 | Implementation of Enviromental and Social Management Plan -Soil quality monitoring at 3 locations for 3 seasons for 2 consecutive years (3x3 Season) (Construction Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 55 | Implementation of Enviromental and Social Management Plan -Air quality monitoring at 3 locations for 2 seasons for 1 year. (3x2 Season x 1 Years) = 6 Nos. of samples (operation Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 56 | Implementation of Enviromental and Social Management Plan -Water quality monitoring at 3 locations for 2 seasons for 1 year. (3x2 Season x 1 Years) = 6 Nos. of samples (operation Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 57 | Implementation of Enviromental and Social Management Plan -Noise quality monitoring at 3 locations for 2 seasons for 1 year. (3x2 Season x 1 Years) = 6 Nos. of samples (operation Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 58 | Implementation of Enviromental and Social Management Plan -Soil quality monitoring at 3 locations for 2 seasons for 1 year. (3x2 Season x 1 Years) = 6 Nos. of samples (operation Stage)(i) Br. No. 1/1 Dusutimukh Hospital Road |
| 59 | A Provisional sum (fixed amount) for items of tree felling/plantation & Occupational,Health and Safety Management Plan of Rs.68033.25(not to be changed by the Bidder in BOQ)(i) Br. No. 1/1 Dusutimukh Hospital Road Please Enable Macros to View BoQ information |