| 1 | Foundation excavation in hard soil including levelling and dressing the bed and sides depositing muck within initial lead and lift etc. complete as per direction of Engg-in-Charge . |
| 2 | Goat Shed |
| 3 | Paddock |
| 4 | Compost Pit |
| 5 | Filling foundation and plinth with sand well watered and rammed including cost,conveyance and royality of sand etc. complete as per direction of Engg-in-Charge |
| 6 | Goat Shed |
| 7 | Compost Pit |
| 8 | Cement concrete 1:4:8 using 4cm. size CBG Crusher broken metal including cost,conveyance and royality of materials curing etc. complete as per direction of Engg-in-Charge . |
| 9 | Goat Shed |
| 10 | Compost Pit |
| 11 | R.C.C. work M20 grade using 20mm.and down grade HBG crusher broken chips including hoisting,laying, cost,conveyance and royality of materials curing including centering and shuttering etc. complete as per direction of Engg-in-Charge . |
| 12 | Goat Shed |
| 13 | Coloumn Base |
| 14 | Plinth Band |
| 15 | Coloumn & Beam |
| 16 | Supplying,fitting and placing uncoated HYSD bar reinforcement as per drawing and technical specification including cost,conveyance and all taxes of steel and binding wire etc.complete as per direction of Engg-in-Charge . |
| 17 | Goat Shed |
| 18 | Iron work wrought and put up in trusses and record racks per 1 Qnt including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work ,Labour welfare cess@1% etc. complete as per the direction of the EIC. |
| 19 | Goat Shed |
| 20 | Paddock |
| 21 | Supply fitting and fixing of 0.40mm GCI. Sheet in in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting as per direction of Engineer-incharge. |
| 22 | Goat Shed |
| 23 | Supply ,fitting ,fixing of Square mess jally including colouring complete as per the direction of EIC |
| 24 | Goat Shed |
| 25 | Paddock |
| 26 | Filling in foundation and plinth with excavated materials including 2/3rd of the respective items of earth work including watering and ramming with all complete. |
| 27 | Goat Shed |
| 28 | Supply,fitting ,fixing of Plastic Slatted Goat flooring. |
| 29 | CONSTRUCTION OF KITCHEN GARDEN(GANGA MAA MODEL) UNIT |
| 30 | Earth work in excavation of foundation in all kinds of soil including moorum, stony earth with all leads and lifts including dressing and leveling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P and dewatering if required for the works etc. complete as directed by the Engineer-in-charge. |
| 31 | Supplying, filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalties and taxes of sand with labour and T&P required for the work etc. complete |
| 32 | Cement concrete of proportion (1:4:8) in foundation and floors using 4cm (1½”) size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6”) thick to the required level ramming,watering, curing etc. complete including cost, conveyance,royalties and excluding GST of all materials with all labour,cess and T&P required for the work etc. complete in all respect. |
| 33 | Fly Ash brick masonry in cement mortar (1:6) in Plinth & Foundation work using fly ash bricks of having a crushing strength of not less than 75 kg/cm2 including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing including cost, conveyance, royalties and excluding GST of all materials with all labour, cess and T&P required for the work complete. |
| 34 | Fly Ash brick masonry in cement mortar (1:6) in Super strucutre work using fly ash bricks size having a crushing strength of not less than 75kg/cm2 including splays cutting circular moulding chamfering and corbelling and similarsuch type of works with all necessary projections watering and curing including cost, conveyance, royalties and excluding GST of all materials with all labour, cess and T&P required for thework complete. |
| 35 | 12 mm (½”) thick cement plaster (1:6) finished smooth to outside smooth surface of brick walls after raking out the jointincluding watering and curing with cost, conveyance, royaltiesand excluding GST of all materials with all labour and T&Prequired for the work etc. complete in all respect. |
| 36 | Supply fitting and fixing of 0.40mm GCI. Sheet in in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting as per direction of Engineer-incharge. |
| 37 | Iron work wrought and put up in trusses and record racks per 1 Qnt including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction of the EIC. Please Enable Macros to View BoQ information |