| 1 | Top bracket 100x 50x6 mm GI channel (2kg) |
| 2 | 100 mm2 AAAC |
| 3 | PG clamp for 100 sqmm AAA conductor |
| 4 | 11 KV pin insulator polymer |
| 5 | HW fitting (B & S)70 KN ,3bolt |
| 6 | Disc insulator(B & S) 70 KN polymer |
| 7 | Top channel100x 50x6 mm ,9.56 kg/mtr,each |
| 8 | Fish plate 50 x 6 mm,2.36 KG/mtr,each |
| 9 | Danger plate,2 nos |
| 10 | Back clamp foe danger plate 25 x 3 mm fla |
| 11 | H.T stay set(complete) |
| 12 | H.T stay insulator type-c(2 nos.) |
| 13 | H.T stayclamp, 50 x 8 mmflat,3.14 kg/m |
| 14 | 7/10 SWG stay wire 15 kg/stay |
| 15 | GI barbed wire anticlimbing device 3kg |
| 16 | back clamp for anticlimbing device 25 x 3 |
| 17 | GI nut ,bolt & washer of different size |
| 18 | RS JOIST pole 150 x 150 (11 mtr long,34.6) |
| 19 | Top channel GI 100 x 50x6 mm (3000 mm) |
| 20 | Fish plate 50 x 6 mm,2.36 KG/mtr,each |
| 21 | Channel GI 75 X 40 X 4.8 MM 3000 mm long)7 |
| 22 | Angle 50x 50x 6 mm GI (1282 MM LONG)4 |
| 23 | 50 X 6 mm GI flat for earthing,2.36 kg/mtr |
| 24 | 100 KVA ,11/0.4 KV(AL)trasnsformer BI |
| 25 | LT distribution box with MCCB,Aluminium |
| 26 | 55 mm2 all alloy aluminium conductor(AAAC) |
| 27 | 4C X 150 MM2 LT XLPE cable (armoured)-F |
| 28 | AB switch (11 KV,200 A,3 pole,50 Hz) |
| 29 | H.G fuse(11 Kv,200 A 3 POLE) |
| 30 | PG clamp for 55 MM2 AAA conductor |
| 31 | Disc insulator(B & S) 70 KN polymer |
| 32 | H W fitting (B & S)70 KN ,3 bolted |
| 33 | Lightning arrester(12 KV,10 KA)station CI |
| 34 | 11 KV pin insulator polymer |
| 35 | HT stay set complete |
| 36 | HT stay clamp(1.9 kg/pair) |
| 37 | HT stay insulator(TYPE-C) |
| 38 | 7/10 SWG GI stay wire grade -2 15 kg/stay |
| 39 | 40 mm nominal bore GI pipe(medium gauge) |
| 40 | GI Nut ,bolt of assorted size(25 kg |
| 41 | GI barbed wire/anticlimbing device (3kg) |
| 42 | back clamp for anticlimbing device 25 x 3 |
| 43 | Danger plate 11 KV |
| 44 | Name plate |
| 45 | yellow colour paint for background |
| 46 | Black colour paint for numbering |
| 47 | back clamp for danger plate 25 x 3 mm flat |
| 48 | METER SMART 3P4W LTCT 200/5A |
| 49 | BOX TP F/LTCT SMART METER 200/5A W/CMP C |
| 50 | Fixing of complete 11 KV line complete set |
| 51 | concreting ration 1:1.5:3( 500 mm x 500mm x 18) |
| 52 | couping ration 1:1.5:3(500 mm x 500 mm x 450mm) |
| 53 | fixing of stay set with 0.5 cum cement c |
| 54 | Construction earthing chamber including |
| 55 | supply and erection of GI fencing with G |
| 56 | stock,storage & insurance (3% of A) |
| 57 | ContingencyY (3% of A + C) |
| 58 | tool & plant(2% of A + C) |
| 59 | Transport(7.5% of A + C) |
| 60 | Erection charges(10% of(A1 + C1) |
| 61 | Erection charges(5% of(A3 + C3) Please Enable Macros to View BoQ information |