|
| 1 | M&L for removing denting wherever required from the following furniture articles, making the surface smooth after removing old paint wherever poped out, removing existing treatment completely without damaging the adjuscent areas, clean throughly to remove all dust/oily spot/ dirt interior and exterior, filling putty at required places, scrubbing with emery paper to make the surface smooth and painting with two coats in the new and repaired parts and single coat in remaining portion in the required colour of 1st quality synthetic enamel paint using spray paint mechine/ brush as required complete all as specified and directed by Engr-in-charge. |
| 2 | Almirah large steel (FD-1031) |
| 3 | AlmirahMedium steel (FD-1032) |
| 4 | Locker bed side steel (FD-257/1029) |
| 5 | Rack steel of different sizes (FD-81(M)/ FD-1023) |
| 6 | Table office officer steel (FD-84/ FD-1002/ FD- 1003) |
| 7 | Table office clerk steel (FD-84/ FD-1004) |
| 8 | Table 3’ x 2’ without drawer (FD-1007) |
| 9 | Table 3’ x 2’ with drawer (FD-1008) |
| 10 | S&F in replacement of unserviceable lock of almirah steel with new GI lock 4 lever with duplicate keys incuding removal of unsv one and fixing with machine screws of required size all as specified and directed.(FD-67/ FD-1031/ 1032) |
| 11 | S&F in replacement of unserviceable lock of Table office officers/clerk steel / 3 x 2 with new GI lock 4 lever with duplicate keys incuding removal of unsv one and fixing with machine screws of required size all as specified and directed.(FD-67/ FD-1003/ 1004/ 1008) |
| 12 | M&L for replacement of handle of following articles with new handle of mild steel/ GI heavy duty to be fixed with machine screw/ nuts/ bolts of required size all as specified and directed. |
| 13 | Almirah large steel/ Almirah large steel with locker (FD-67/ FD-1031) |
| 14 | Almirah medium steel (FD-67/ FD-1032) |
| 15 | Locker bed side steel (FD-257/1029 ) |
| 16 | S&F of MS hasp and staple/ MS Tower bolt of Locker bedside steelwith new one to be fixed with MS revit/ nuts/ bolts/ welding as required all as specified and directed.(FD-257/1029 ) |
| 17 | S&F cromium plated steel conduit pipe of 20mm dia with 1.6mm wall thickness with sockets at both ends for Locker bedside steel complete all as perdrawing and directed by Engr -in Charge. Drawing No (FD-257/1029). |
| 18 | S&F of clips for fixing of shelves, including removing unserviceable clips from Almirah steel of any size or type complete all as perdrawing and directed by Engr -in Charge. Drawing No (FD-257/1029). |
| 19 | M&L for weldingon various parts of steel furniture items including preparation of surface and removing the unwanted welding spots complete all as specified and directed. |
| 20 | M&L for removing existing unserviceable legs of following furniture articles and supply and fixing new legs as existing made of 1 mm thick MS sheet welded as per best trade practice and painting with one coat of metal primer complete all as specified and directed. |
| 21 | Almirah large steel/ Almirah large steel with locker (FD-1031 & FD/E6/MAP/18 ) |
| 22 | Almirah medium steel (FD-1032) |
| 23 | Locker bed side steel (FD-257/1029) |
| 24 | M&L for removing 3 way locking device and chakar (excluding lock and handle) from the following furniture articles and supply & replacement with new 3 way locking device and painted with one coat of metal primercomplete all as specified and directed. |
| 25 | Almirah large steel/ Almirah large steel with locker (FD-1031 & FD/E6/MAP/18 ) |
| 26 | Almirah medium steel (FD-1032) |
| 27 | M&L for replacement of broken/ damaged shelf in the following furniture articles made out of 20 gauge MS sheet made to shape as per existing duly painted with a coat of primer complete all as specified and directed. |
| 28 | Almirah large steel/ Almirah large steel with locker (FD-1031 & FD/E6/MAP/18 ) |
| 29 | Almirah Medium steel(FD-1032) |
| 30 | M&L for replacement of broken/ damaged door in the following furniture articles made out of 20 gauge MS sheet with hinges made to shape as per existing duly painted with a coat of primer complete all as specified and directed. |
| 31 | Almirah large steel/ Almirah large steel with locker (FD-1031 & FD/E6/MAP/18 ) |
| 32 | Almirah Medium steel (FD-1032) |
| 33 | Locker steel (FD-257/1029/ 127 (M) ) |
| 34 | M&L for replacement of old unserviceable drawerswith new drawer made out of 20 gauge MS sheet made to shape as perduly painted with a coat of primer complete all as specified and directed. |
| 35 | Table office clerk steel (FD-1004) |
| 36 | Table office officer steel (FD-1002/1003) |
| 37 | Table 3’ x 2’ with drawer (FD-1008) |
| 38 | M&L for replacement of old unserviceable PVC covering on recessed handle of drawersof tables with new one as percomplete all as specified and directed. |
| 39 | M&L for replacement of old unserviceable legs with new legs made with 25 mm square MSl tube of wall thickness 1.6mm as perduly painted with a coat of metal primer complete all as specified and directed. |
| 40 | S&F in replacement rubber shoes of size 25 mm X 25 mm to the legs of various types of furniture items after removing the existing old one completly. |
| 41 | S&F top made of 17/ 18 mm thick both side pre laminated exterior grade MDF board of required colour/ pattern provided with 4 mm thick TW beading all around (the beading should be fixed with nails and fevicol) for various type of tables in replacement of existing u/s top of any type and size complete all as specified and directed. |
| 42 | CHAIR VERANDAH( NO FD-256/ FD/MAP-II/06) |
| 43 | Materials and labour for removal of old paint and painting the same with two coats of white synthetic enamel paint including the preparation of the surface complete all as specified and directed. |
| 44 | M&L for 20mm dia 16 Guage MS conduit pipe for left or right side frame (consisting front & rear leg portion) duly welded to the seat frame of chair verandah and also to 10 mm dia MS rod in front leg complete duly painted with a coat of metal primer all as perdrawing and directed by Engr -in Charge. |
| 45 | M&L for recanning with new plastic cane 4mm wide half round of best quality (Mat pattern) duly approved in white colour on Chair Verandah including removing of old unserviceable cane/newar complete all as perdrawing and directed by Engr -in Charge. |
| 46 | New PVC seat and back 4 mm thick with weight not less than 1.85 kg and grooves 90X10 mm 10 Nos on seat and back. Make: AMCO/CELLO/MILTON/HARMONY |
| 47 | S&F new hard rubber/ PVC shoes (Set of 04 Nos) of approved quality including removing of old unserviceable rubber shoes of verandah chair complete all as perdrawing and directed by Engr -in Charge. |
| 48 | CHAIR WRITING (FD/E6/MAP/12)Supply and fixing in replacement of following unserviceable parts of chair writing all as specified and directed: |
| 49 | Seat made of 75 mm thick foam with new tapestry cloth cover of good quality of cost not less than Rs. 250/- per metre including 12 mm thick ply seat bottom complete. The bottom part of the seat should be covered with black colour nylon cloth. Colour and pattern of tapestry cloth as approved by GE. |
| 50 | Back made of 75 mm thick foam with new tapestry cloth cover of good quality of cost not less than Rs. 250/- per metre including 12 mm thick ply back support complete. The joints of tapestry cloth should be provided with rubber/ nylon beading as directed. Colour and pattern of tapestry cloth as approved by GE. |
| 51 | Removing old soiled/ torn seat and back cover only and S&F new seat and back cover as per srl item no. 19.01 and 19.02 above complete as directed. |
| 52 | S&F MS strip of existing size 4mm thick by welding to the existing frame below the seat of chair writing including provision of hole of fixing the seat by screwing duly painted with acoat of metal primer. |
| 53 | Arms as per existing. |
| 54 | M&L for painting to frame with one coat of black synthetic enamel paint including preparation of surface complete all as specified. |
| 55 | Rubber/ PVC shoes as per existing. |
| 56 | BED HARD IRON(FD/E6/MAP/08) |
| 57 | Materials and labour for complete removal of existing paint and applying two coats of black synthetic enamel paint over a coat of primer complete all as specified and directed. |
| 58 | Material and labour for removing existing unserviceable ply of bed hard top and supply and fixing new ply of 12mm thick, BWR exterior grade, 7 ply complete all as specified and directed. |
| 59 | Material and labour for removing existing unserviceable headboard and supply and fixing with new one made of 18mm both side prelaminated particle board. |
| 60 | Material and labour for removing existing unserviceable footboard and supply and fixing with new one made of 18mm both side prelaminated particle board. |
| 61 | S&F shoe for legs. |
| 62 | CHARPOY WITH HARD TOP (FD/ MAP-II/ 01) |
| 63 | Materials and labour for complete removal of existing paint and applying two coats of black synthetic enamel paint over a coat of primer complete all as specified and directed. |
| 64 | Material and labour for removing existing unserviceable ply and fixing new ply of 12mm thick, BWR exterior grade, 7 ply complete all as specified and directed. |
| 65 | CHARPOY GI WITH PLY TOP (FD-220) |
| 66 | Removing unserviceable long rail having both threadedbroken ends ,supply and fixing new long rail of GI tubing 32 mm bore medium grade (ISI marked) duly threaded both ends all as specified and shown on drawing ,complete all as specified and directed by theEngineer in Charge. |
| 67 | Removing unserviceable short rail having both threaded broken ends and supplying and fixing short rails converted out of broken long railobtained from Serial item No. 22.01 (2 Nos short rails from One long rail) here-in-above duly threading both ends of short rails and fixing in position, complete all as per drawing and as directed by the Engineer-in-Charge . |
| 68 | Removing unserviceable legs and replacing it with those made out of unserviceable short rail obtained from Serial item No. 22.02 here-in-above by proper threading end fixing in position, complete all as per drawing and as directed by the Engineer-in-Charge . |
| 69 | Removing of unserviceable galvanized iron elbow three ways 32 mm bore from GI charpoy , supply and assembling new elbows three way galvanized iron for 32 mm bore medium grade, ISI marked, complete all as per drawing and as directed by the Engineer-in-Charge . |
| 70 | Removing of unserviceable check nut galvanized iron 32 mm dia and supplying and assembling new check nuts of 32 mm dia, ISI marked, complete all as per drawing and as directed by the Engineer-in-Charge . |
| 71 | Supply & fixing stiffener made of 32mm x 5mm flat iron in replacement of unserviceable stiffner with proper welding process, duly painted with a coat of metal primer complete all as directed by the Engineer-in-Charge . |
| 72 | Supply and fixing in replacement of 12 mm thick 7 ply 1980 x 900 mm long, BWR grade ISI marked . The ply shall be fixed to frame with flat head MS nut and bolt ( after drilling hole in ply and frame of charpoy, if required. The corners of ply shall be made in to curve. Entire frame of charpoy except stiffners shall be painted with two coats of aluminum paint (1st grade quality) and stiffner shall be painted with black paint over a coat of metal primer. The work also include tightening of loose check nuts, elbows, long rails, short rails, legs etc. to make charpoy firm. Rest all specified in theand as directed by Engineer-in-Charge. |
| 73 | Double Bunk CharpoyGI pipe (FD-CESZ/SK-203/91) : Taking out old unsv parts as given below from Double Bunk CharpoyGI pipe and S & F new parts in replacement as per Shape and size as existing all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 74 | New GI pipe long rail 32mm dia medium grade ISI marked with both ends double hole including removing of unserviceable broken long rails from charpoy. |
| 75 | New GI elbow 32mm dia ISI marked matching with the existing shape & size including removing of unserviceable elbow from charpoy. |
| 76 | New MS algle bracket 35x35x5mm and 100 mm long with hole welded to pipe stand matching with the existing shape & size. Bracket shall be painted with two coats of black paint over a coat of red oxide primer. |
| 77 | New GI nut and bolt with washer counter sunk 10 mm dia for joint MS angle bracket 35x35x5mm x100 mm long and long rails matching with the existing shape & size as per drawing. |
| 78 | New commercial plywood top 12mm thick grade BWR commercial and fixing with nut and bolt of appropriate size including cutting / welding the stiffener andangle of size 35x35x5mm andtightening of frame as per ground requirement including removing of old unserviceable GI Elbow & plywood top Charpoy. |
| 79 | Supply and fixing of 10 mm thick glass top of size of 1200 mm long X 600 mm Wide all side rounded including 04 Nos vacuum rubber shoes in top of legs including removing unserviceable glass top and vacuum rubber of Table Center (brass fram) complete all as perdrawing and directed by Engr -in Charge. Drawing No (FD-375) |
| 80 | Material & Labourfor two coats of French polish of best quality on old surfaces after preparation of old surfaces of various furniture articles complete all as specified as shown on drawing and as directed by Engr-in-charge for the following items of furniture. |
| 81 | Chair Dining (FD-279) |
| 82 | Chair Easy (FD-229) |
| 83 | Chair Writing (FD-280) |
| 84 | Chair Dining Officers (FD/E6/MAP/10) |
| 85 | Chair Wooden Bottom (FD-56/225.) |
| 86 | Sofa set Five seater (FD-281, FD/MAP-II/02) |
| 87 | Sofa set Four seater (FD-281) |
| 88 | Sofa Single seater (FD-281) |
| 89 | Teapoy Wooden (FD-232/ 278) |
| 90 | Table Peg ( FD-236/ 277) |
| 91 | Table Writing (FD-275) |
| 92 | Table Centre (FD-274) |
| 93 | Table 900 mm x 600 mm with drawers (FD-283) |
| 94 | Table 900 mm x 600 mm without drawers (FD-284) |
| 95 | Table Dining 6 Persons (FD-273) |
| 96 | Table Dressing Ladies with Mirror (FD-251 / 378) |
| 97 | Table Dressing Gents with Mirror ( FD-230) |
| 98 | Hat Stand with Mirror (FD-233) |
| 99 | Bed plywood top (FD-246) |
| 100 | Table Bed side (FD- 276) |
| 101 | Chair Dining (FD-279)M&L for taking out old unsv components as follows from Chair Dining and S & F new Components as per shape and size as existing made out of well seasoned 1st class Hard wood Teak complete all as specified and shown on drawing and as directed by Engr-in-charge. |
| 102 | Front legs |
| 103 | Rear legs |
| 104 | Front rails/ Side rails/ Back rails |
| 105 | Back rest |
| 106 | Stiffeners |
| 107 | Chair Easy (FD-229)M&L for taking out old unsv components as follows from Chair Easy and S & F new Components as per shape and size as existing made out of well seasoned 1st class Hard wood Teak complete all as specified and shown on drawing and as directed by Engr-in-charge. |
| 108 | Front legs |
| 109 | Rear legs |
| 110 | Side /Front / Back Rail of seat and back |
| 111 | Arms |
| 112 | Chair Writing FD-280)M&L for taking out old unsv components as follows from Chair Writing and S & F new Components as per shape and size as existing made out of well seasoned 1st class Hard wood Teak complete all as specified and shown on drawing and as directed by Engr-in-charge. |
| 113 | Front legs |
| 114 | Rear legs |
| 115 | Front / Side / Back rails |
| 116 | Back rest |
| 117 | Arms |
| 118 | Stiffeners |
| 119 | Material & Labourfor cutting of unsv plastic cane and re-canning of various types chairs and other articles with half round plastic cane 2 mm wide 0.4mm thick in Godrej pattern for seat and back as required. complete all as specified and as shown on drawing and as directed by Engr-in-charge. |
| 120 | Chair Dining Officers (FD/E6/MAP/10)M&L for taking out old unsv components as follows from Chair Dining Officers and supply & fixing New Components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 121 | Front legs |
| 122 | Rear legs |
| 123 | Front/ Back/ Side Rails |
| 124 | Back rest |
| 125 | Vertical stripsof back rest |
| 126 | Stiffner |
| 127 | M&L for taking out old unserviceable cushion seat and S&F cushion seat of 75 mm thick, 32 density foamwith 12 mm thick plywood bottom covered with superior quality tapestry cloth cover stitched to make good shape (Tapestry cloth cost not less than Rs.350/- per metre) complete all as specified and directed.Note: Colour & pattern as approved by GE/Engineer-in-Charge. |
| 128 | Chair Wooden Bottom (FD-56/225)Taking out old unsv components as follows from Chair WB and S & F new Components as per shape and size as existing made out of well seasoned 1st class Hard wood Teakcomplete all as specified and shown on drawing and as directed by Engr-in-charge :- |
| 129 | Front legs |
| 130 | Rear legs |
| 131 | Side / Front /Back rails |
| 132 | Back rest |
| 133 | Stiffeners |
| 134 | Seat made of 6mm thick plywood commercial BWR grade. |
| 135 | Sofa set Five/ Four / Single seater (FD-281, FD/MAP-II/02)M&L for taking out old unsv components as follows from Sofa set 5/4/ single seater and S& F new components as per shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 136 | Seat Rails Right and leftof Sofa set (Single Seater) |
| 137 | Seat Rails Front and Back of Sofa set (Single Seater) |
| 138 | Rails of back frame Top and bottom of Sofa set (Single Seater) |
| 139 | Back and bottom support of Sofa set (Single Seater) |
| 140 | Long rails of seat front and back of Sofa set (Three Seater) |
| 141 | Long rails of Back frame Top and bottom of Sofa set (Three Seater) |
| 142 | Long Back and bottom support of Sofa set (Three Seater) |
| 143 | Legs of Sofa Single seater/Three seater |
| 144 | Arms of Sofa set. |
| 145 | Bearers of Seat and Back of Sofa set. |
| 146 | M&L for replacement of old worn out cushion of sofa set and S & F new cool foam cushion 32 density, 100 mm thick with superior quality tapestry cloth cover duly stitchedto make good shape (Tapestry cloth not less than Rs.350/- per metre)complete all as specified and directed.Note: Colour & pattern of tapestry cloth as approved by GE/ Engineer-in-Charge. Cushion shall be brought to BSO furniture yard in company packing for approval by Engineer-in-charge and then stitched in yard under supervision of Supervisor (B/S). |
| 147 | Teapoy (FD-232/ 278)M&L foraking out old unsv components as follows from Teapoy and supply & fixing new Components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 148 | Legs |
| 149 | Long Rails |
| 150 | Short Rails |
| 151 | Stiffner |
| 152 | Table Peg (FD-236/ 277)M&L for taking out old unsv components as follows from Table Peg and supply & fixing new Components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 153 | Legs |
| 154 | Long Rails |
| 155 | Short Rails |
| 156 | Stiffner |
| 157 | Table Writing (FD-275)M&L for taking out old unsv components as follows from Table Writing and supply & fixing new Components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 158 | Legs |
| 159 | Top side long rails |
| 160 | Top side short rails |
| 161 | Stiffners |
| 162 | Drawers. |
| 163 | Shutter of cupboard fixed with continues piyano hinges. |
| 164 | 6 mm thick commercial plyon back and side of cupboard. |
| 165 | New side of 4 mm thick teak veneer ply. |
| 166 | Table Centre/ Table Centre Two Tier (FD-274)M&L for taking out old unsv components as follows from Table Centre and supply & fixing new Components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 167 | Legs |
| 168 | Short Rails/ Stiffner |
| 169 | Long Rails / Stiffner |
| 170 | Rails of bottom tier |
| 171 | Table 900 mm x 600 mm with/ without drawers. (FD- 283/ 284)M&L for taking out old unsv components as follows from various tablesas above and supply & fixing new components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 172 | Legs |
| 173 | Short Rail / Short Stiffners |
| 174 | Long Rail / Long Stiffners |
| 175 | Drawer. |
| 176 | Table Dining6 Persons (FD-273)M&L for taking out old unsv components as follows from Table Dining 6Persons and supply & fixing new components as per Shape and size as existing made out of well seasoned 1st class teak wood all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 177 | Legs |
| 178 | Short Rail |
| 179 | Long Rail |
| 180 | Table Dressing Ladies with Mirror (FD-251 / 378)M&L for taking out old unsv components as follows from Table Dressing Ladies and supply & fixing new components as per Shape and size as existing complete all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 181 | Looking mirror of 5mm thick. |
| 182 | New Frame and back membrane of the mirror including back side 6 mm thick commercial plywood. |
| 183 | Legs made of first class HW teak. |
| 184 | Top made of 18mm thick pre-laminated particle board teak face providing 4mm thick Teakwood beading on exposed sides. |
| 185 | Drawers made out of 12 mm thick plywood with front side having 18mm thick pre-laminated particle board teak face providing 4mm thick Teakwood beading on exposed sides. |
| 186 | Glass panes shutters 5 mm thick alongwith aluminium channel and glass runners. |
| 187 | Back / Bottom made of 12 mm thick plywood. |
| 188 | Table Dressing Gents with Mirror ( FD-230)M&L for taking out old unsv components as follows from Table Dressing Gents and supply & fixing new components as per Shape and size as existing complete all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 189 | Looking mirror 5mm thick. |
| 190 | Frame & back membrane of the mirror including back side 6 mm thick commercial plywood. |
| 191 | Drawers made out of 12 mm thick plywood with front side having 18mm thick pre-laminated particle board teak face. |
| 192 | New Top made out of 12 mm thick pre-laminated particle board teak faced and providing 4 mm thick Teakwood beading on front side. |
| 193 | Hat Stand with Mirror (FD-233)M&L for taking out old unsv components as follows from Hat stand and supply & fixing new components as per Shape and size as existing complete all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 194 | Looking mirror5mm thick. |
| 195 | 4 mm thick plywood one side teak face on front. |
| 196 | Aluminium Pegs 100 mm long |
| 197 | Teak wood edging of size 6 x 35 mm alround the hat stand |
| 198 | 6 mm thick commercial ply wood ISI marke for back side. |
| 199 | Bed Plywood top (FD-246)M&L for taking out old unsv components as follows from Bed plywood top and supply & fixing new components as per Shape and size as existing complete all as specified and shown on drawing and as directed by Engr-in-Charge. |
| 200 | Head board with legs and outer frame made out of teak wood and the inner portion of frame made out of deodar wood covered with 4 mm thick one side teak face ply of exterior grade. |
| 201 | All as per Srl item No 42.01 above but foot board |
| 202 | Plywood 12mm thick, BWR grade 7 ply. |
| 203 | Long rail made of Sal wood. |
| 204 | Stiffener made of TW joining the long rails. |
| 205 | S&F knob as per approved sample on various furniture articles with appropriate size machine screws complete all as specified and directed. |
| 206 | S&F nylon/ PVC buffer as per approved sample on various furniture articles with appropriate size screws complete all as specified and directed. |
| 207 | S&F key plates as per approved sample on various furniture articles with appropriate size screws complete all as specified and directed. |
| 208 | S&F lock with double keys as per approved sample on various furniture articles with appropriate size screws complete all as specified and directed. |
| 209 | Notes :- Amount of Credit Schedule for Schedule \"A\" Part-ll shall be deducted from total quoted amount of BOQ to arrive at the contract sum. |