Tender For Electricity Connections And Electrification Works Under Mla Fund Under Electricity Distribution Division, Robertsganj. Electrification Work For The Year (2025-26)., Sonbhadra-Uttar Pradesh
TDR : 52850075
Tender Notice
BOQ
11 Days Left
Sonbhadra
Uttar Pradesh
Tender For Electricity Connections And Electrification Works Under Mla Fund Under Electricity Distribution Division, Robertsganj. Electrification Work For The Year (2025-26).
Name of Work:- Fo|Qr Forj.K [K.M] Jkov~Zlxat Ds Vurxzr Fo/Kk;D Fuf/K Ds V/Khu Fo|Qr Dusd”Kuksa O Fo|Qrhdj.K Ds Dk;Ksz Gsrq /Kujkf”K O’Kz Ik;Zur ¼2025&26½ Ds Dk;Ksz Dk Fo|Qrhdj.K Dk Dk;Za
Sl. No.
Item Description
1
CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.)
2
ST Pole 11 Mtr Long
3
PCC Pole 8.5 Mtr
4
11 KV V-type X-Arm
5
GI Pipe 6\" Dia
6
Top Channel MS 100x50x2240 MM. Long
7
ACSR Weasel Conductor
8
Stay Complete
9
10 KVA T/F
10
25 KVA T/F
11
63 KVA T/F
12
Dropper Channel MS 100x50x2000 MM
13
LT AB Cable 1x25+1x16 SQ MM
14
11 KV T-off Channel
15
S/S Base Angle
16
Earthing Complete
17
DE-CENTRALIZED MATERIALS, Provided by Contractor
18
Danger Board with Nut/Bolt
19
Barbed Wire
20
Number Plate
21
Cross Arm Holding Clamp
22
11 KV Polymeric Pin Insulator with Pin
23
11 KV Polymeric Disc Insulator with Fitting
24
PG Clamp
25
LT Shackle Insulator
26
LT Shackle Insulator for Clamp Nut & Bolt
27
I Hook With Dead End Clamp
28
I Hook With Suspenstion Clamp
29
F- Clamp
30
Nut & Bolt Washear
31
Stone Pad
32
Clamp for T/F
33
Clamp with Nut & Bolt
34
Work of following materials as Per RESSPO/PuVVNL norms at the work site.
35
Cairrage and Erection of Sectional Four Pole Structure , Sectional Double Pole Structure and Single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
36
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
37
Grouting of Stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
38
Stay Complete
39
Earthing Complete
40
Stringing of ACSR Weseal Conductor along with fitting of all accessories
41
10 KVA T/F
42
25 KVA T/F
43
63 KVA T/F
44
LT AB Cable 1x25+1x16 SQ MM
45
GI Pipe 6\" Dia Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.